Allen-Bradley 1783-US03T01F Stratix Managed Switches Stratix 2000 3+1 Port
Allen-Bradley 1783-US03T01F Stratix Managed Switches Stratix 2000 3+1 Port
Allen-Bradley 1783-US03T01F Stratix Managed Switches Stratix 2000 3+1 Port
Allen-Bradley

Allen-Bradley 1783-US03T01F Stratix Managed Switches Stratix 2000 3+1 Port

SKU: 1783-US03T01F
Categories : All Products
In Stock
  • Dimensions: 4.5 x 12.7 x 10.7 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for unmanaged Ethernet switching tasks in EtherNet/IP networks, the Allen-Bradley 1783-US03T01F (1783-US03T01F Stratix Managed Switches) provides direct physical/electrical execution.

Configuration and Catalog Structure

The 1783-US03T01F belongs to the Stratix 2000 product line. The hardware architecture incorporates three 10/100 Mbps copper ports supporting full or half duplex transmission and one 100BASE-FX multimode fiber port utilizing an LC connector interface. Power input is designed for 20 VAC or 24 VDC systems.

Hardware Specifications

Parameter Specification
Model 1783-US03T01F
Brand Allen-Bradley
Series Stratix Managed Switches
Origin USA
Weight 0.24 kg
Shipping Dimensions 4.5 x 12.7 x 10.7 cm
Tariff Code 8537101190
Power Requirements 20 VAC / 24 VDC
Isolation Voltage 30 V
Inrush Current 2.2 A
Ethernet Data Rate 100 Mbps
Fiber Optical Link Budget 62.5/125
Certifications C/Us, CE, UL, C-Tick

Industrial Automation Control Integration

Operating within Allen-Bradley control architectures, this unmanaged switch executes deterministic Ethernet/IP network transmission across distributed nodes. The unit maintains stable backplane bus communication velocity, supporting strict packet transfer intervals for connected I/O and controller hardware. The device requires no firmware configuration, ensuring transparent Layer 2 frame forwarding across plant-floor topologies without introducing software-induced latency or routing overhead.

Ordering Information

  • 1 x 1783-US03T01F Stratix 2000 Switch Unit
  • 1 x Integrated Terminal Block for Power Connection
  • 1 x Product Installation Instruction Sheet

Field Installation Guidelines

  • DIN-Rail Mounting: Secure the switch housing directly onto standard industrial DIN rails, ensuring positive locking engagement of the rear mechanical latch.
  • Power Cabling: Terminate the incoming 20 VAC or 24 VDC supply lines to the removable terminal block, maintaining correct polarity and torque specifications.
  • Shielding and Grounding: Bond the functional ground terminal to the local control cabinet ground bus using low-impedance copper wire to mitigate electromagnetic interference.
  • Fiber Optic Handling: Maintain minimum bend radius limits for the 62.5/125 multimode fiber cables and protect LC connectors from particulate contamination prior to insertion.

Frequently Asked Questions

  • Does this switch require software configuration prior to network deployment?
  • No configuration is required. The unit functions strictly as an unmanaged layer-2 device and operates immediately upon power application.
  • What is the maximum data transmission rate supported by the copper ports?
  • The copper ports support 10/100 Mbps data rates in both full and half duplex operational modes.
  • Can the multimode fiber port communicate with single-mode fiber infrastructure?
  • No. The fiber transceiver is designed exclusively for 62.5/125 multimode fiber optics utilizing an LC connector format.
  • How is electrical isolation maintained within the unit?
  • The internal circuitry maintains a rated isolation voltage threshold of 30 V to isolate power input from communication channels.
  • What is the specified inrush current during initial power-up?
  • The unit draws an inrush current of 2.2 A when power is initially applied to the terminal block.
  • Is hot-swapping supported for the power supply terminals?
  • Power connections should be de-energized before removing the terminal block to prevent electrical arcing and terminal degradation.
  • What standard regulatory marks are stamped on the device housing?
  • The hardware complies with C/Us, CE, UL, and C-Tick industrial regulatory standards.
  • How should the switch be mounted inside an industrial enclosure?
  • The unit is engineered for standard DIN-rail mounting within a properly rated industrial control cabinet.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More