1772-LP3 Allen-Bradley Processor Module PLC-2/30 Series
1772-LP3 Allen-Bradley Processor Module PLC-2/30 Series
Allen-Bradley

1772-LP3 Allen-Bradley Processor Module PLC-2/30 Series

SKU: 1772-LP3
Categories : All Products
In Stock
  • Dimensions: 31 x 22 x 34 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 1772-LP3, also cataloged as the 1772-LP3 Processor Unit, operates as a dedicated hardware component for central logic processing and I/O scan execution within PLC-2/30 system racks.

Hardware Designation Breakdown

  • 1772-LP3: Primary chassis-mount processor assembly for execution of industrial ladder logic and peripheral scan routines.

  • 1772LP3: Alternate catalog string referencing identical internal logic board stack, memory backplane, and power transformer layout.

Electrical & Physical Specifications

Parameter Specification
Model 1772-LP3
Brand Allen-Bradley
Origin United States
Weight 16.12 kg
Shipping Dimensions 31.0 x 22.0 x 34.0 cm
Operating Temp 0 to 60 deg C
Power Consumption 240 VA maximum
Operating Voltage 120/240 VAC (50/60 Hz)
Current Rating 2 A (120 VAC) / 1 A (240 VAC)
Mounting Configuration Chassis Mount
System Architecture PLC-2/30 Processing Platform

Backplane Bus Communication Velocity & Scanning

The module governs backplane bus communication velocity across localized I/O chassis racks through dedicated bus timing logic. Logic solution sweeps run synchronously with input/output image table updates. This fixed scan priority maintains deterministic instruction timing and prevents signal latency during intensive block transfer operations across expansion backplanes.

Standard Delivery Hardware

  • 1 x Allen-Bradley 1772-LP3 Processor Unit

  • 1 x Power connection jumper plug

Field Installation & Mounting Rules

  • Mounting Surface Preparation

    • Secure the chassis directly to a flat metal enclosure panel using heavy-duty bolts to support the 16.12 kg weight.

  • Line Voltage Selection

    • Set internal terminal jumpers to match either 120 VAC or 240 VAC mains input before applying operating power.

  • Enclosure Thermal Clearance

    • Maintain a minimum vertical clearance of 100 mm above and below the assembly for natural convection cooling.

  • Earth Grounding Integrity

    • Connect a heavy gauge grounding strap directly from the chassis grounding stud to the main enclosure earth bus.

Technical System FAQs

  • What is the required mains AC supply voltage for the 1772-LP3 unit?

    The processor operates on nominal 120 VAC or 240 VAC power supplies at 50/60 Hz frequency ranges.

  • What current level does the processor draw under full operating load?

    The unit draws 2 A maximum when connected to 120 VAC, or 1 A maximum when wired for 240 VAC operation.

  • Is hot-swapping allowed for this heavy processor assembly?

    No, main AC power must be isolated prior to physical installation, wiring adjustment, or unit removal.

  • How does the unit maintain backplane bus communication velocity?

    Dedicated control buses regulate synchronous timing loops during execution of the internal instruction set.

  • What thermal operating limits must be maintained in the enclosure?

    Ambient operating air temperatures surrounding the chassis must be maintained between 0 deg C and 60 deg C.

  • How is the processor mounted inside an industrial panel?

    The unit utilizes a rigid chassis-mount structure secured via direct mounting holes to the backplate.

  • Does the processor support external 1771 I/O chassis expansion?

    Yes, the unit routes control data to local or remote I/O chassis using dedicated parallel backplane cables.

  • What grounding precautions are mandatory during field setup?

    The central chassis ground terminal must link directly to system ground to suppress high-frequency noise.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More