Allen-Bradley 1756-RMC3 3 m RM Fiber Optic Cable ControlLogix Redundancy System
Allen-Bradley 1756-RMC3 3 m RM Fiber Optic Cable ControlLogix Redundancy System
Allen-Bradley

Allen-Bradley 1756-RMC3 3 m RM Fiber Optic Cable ControlLogix Redundancy System

SKU: 1756-RMC3
Categories : All Products
In Stock
  • Dimensions: 19.5 x 16.3 x 4.3 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for peer-to-peer chassis synchronization in ControlLogix redundant systems, the Allen-Bradley 1756-RMC3/A (1756-RMC3 RM Fiber Optic Cable) transports the duplex optical redundancy link between paired 1756-RM-class modules .

Catalog Marking and Length Family

Marking Definition
1756-RMC3 Base catalog number, 3 m (9.84 ft) prefabricated RM fiber optic cable
1756-RMC3/A Revision A hardware/build of the cable assembly
1756-RMC1 1 m sibling in same RM cable family
1756-RMC10 10 m sibling in same RM cable family
1756RMC3 Non-hyphenated BOM / shipping label string

Hardware Specifications

Parameter Specification
Model 1756-RMC3
Brand Allen-Bradley / Rockwell Automation
Origin United States
Weight 0.15 kg
Shipping Dimensions 19.5 x 16.3 x 4.3 cm
Assembly Type Passive prefabricated duplex LC-to-LC RM synchronization cable
Length 3 m (9.84 ft)
Typical Connector Duplex LC, keyed for 1756-RM / 1756-RM2 / 1756-RMXT / 1756-RM2XT ports
Fiber Class Matched to RM module port: 62.5/125 um or 50/125 um multimode, or 8.5/125 um singlemode per RM generation
Link Topology Point-to-point only; no couplers, media converters or switches in line
Power Consumption Not applicable; passive optical link, no backplane current draw
Operating Temp -25 to 70 deg C (-13 to 158 deg F) per supplied nameplate data
Storage Temp -40 to 85 deg C typical for industrial-grade prepatch cord
Minimum Bend Radius 30 mm floor for OM1/OM2 multimode service; observe larger singlemode cable rating where G.652 singlemode is used
Used With 1756-RM, 1756-RM2, 1756-RMXT, 1756-RM2XT redundant modules
Status Discontinued as standalone cable assembly in legacy RM families

ControlLogix Redundant Link Throughput and Firmware Pairing

The 1756-RMC3 is the physical media carrying the ControlLogix redundant chassis synchronization traffic between two 1756-RM-class modules mounted in separate 1756 racks. On 1756-RM / 1756-RMXT the optical link runs at 100 Mbps; on 1756-RM2 / 1756-RM2XT the same duplex LC path runs at 1000 Mbps, mirroring program, I/O image, tag, timer, alarm and communication buffer state between primary and secondary controllers . There is no backplane bus communication velocity licence field on the cable itself; the effective synchronization rate is fixed by the slower of the two terminated RM modules and the fiber grade. Firmware flash compatibility is enforced at the 1756-RM pair, not at the cable: a primary 1756-RM2 and secondary 1756-RMXT, or 1756-RM mixed with 1756-RM2, are rejected by the redundancy manager regardless of a clean 1756-RMC3 optical link . I/O density scaling of the overall system is unaffected by the 3 m cable length, but 3 m only closes adjacent or neighboring-cabinet rack pairs; longer RM cable assemblies (1756-RMC10 or field-terminated singlemode spans) are required before the 100 m multimode or 10 km singlemode limits are reached.

Ordering Information

  • 1 x 1756-RMC3 3 m duplex LC-to-LC RM fiber optic cable (base assembly)
  • 2 x LC dust caps pre-fitted on both ends on sealed NOS stock
  • 1 x Cable label set for PRIMARY / SECONDARY rack identification
  • 1 x Printed cleaning instruction card for LC ferrule wipe before insertion

Rack-to-Rack Optical Laydown Rules

  • De-energize both redundant chassis or rely on RM module RIUP only when the exact RM generation and firmware match is already confirmed; never insert a suspected-damaged cord into a live SYNC port
  • Connect 1756-RMC3 directly between the two RM module optical ports of the same generation; no patch panel, media converter or Ethernet switch is permitted in the path
  • Keep the 3 m service loop away from 480 VAC tray cable, VFD output duct and welding return conductors; route through separate grounded steel conduit where cabinet separation is not achievable
  • Wipe each LC ferrule with lint-free IPA swab before mating; a contaminated ferrule is the dominant cause of intermittent SYNC LED loss on a previously commissioned redundancy link
  • Do not kink, staple or zip-tie the jacket below the 30 mm bend radius; a crushed jacket section raises return loss and collapses the redundant channel even when the OK LED is still lit on one side

Technical Questions and Answers

Is 1756-RMC3 a standard LC-LC patch cord usable on a switch?

No. It is a prepopulated RM synchronization cord sized, labeled and validated for the 1756-RM family optical budget. Connecting it to a non-RM port or through a coupler/switch breaks the ControlLogix redundancy handshake and leaves both chassis non-synchronized.

Can 1756-RMC3 link a 1756-RM to a 1756-RM2 across the two racks?

No. 1756-RM and 1756-RM2 are not cross-pairable; the redundancy manager faults on dissimilar module type even with a clean 1756-RMC3 optical link. Primary and secondary must be the same RM generation and firmware major revision .

Does the 3 m length limit system availability?

Only mechanically. Electrically the multimode RM link supports up to 100 m on 1756-RM / RMXT, and singlemode spans support longer distances on RM2 / RM2XT. A 3 m cord simply means the two redundant racks must sit in adjacent or near-adjacent enclosures.

Who carries the switchover delay, the cable or the RM module?

The 1756-RMC3 is passive; it adds only propagation delay over 3 m, which is negligible. Primary-to-secondary bumpless takeover is governed by the 1756-RM2 / RM2XT synchronization engine, commonly sub-20 ms to sub-50 ms depending on program size and I/O map .

Can two 1756-RMC3 cords be spliced to make 6 m?

Not recommended. Every added splice, barrel or inline adapter inserts insertion loss and reflectance into a link that has no margin headroom reporting at the cable level. Use a factory 1756-RMC10 or a qualified field-terminated singlemode span instead.

Why does SYNC stay off although both LC ends click home?

Most often the far-end RM module is not in redundancy mode, the primary/secondary role is unassigned in Studio 5000, or one LC face is dirty / partially seated. The 1756-RMC3 itself has no diagnostics; verify with RM OK / SYNC / COM LEDs and the redundancy diagnostics object.

Does XT and non-XT mix work if both use 1756-RMC3?

1756-RMXT pairs with 1756-RMXT, and 1756-RM2XT pairs with 1756-RM2XT; a wide-temp module does not form a redundant pair with its non-XT sibling merely because the optical cord is inserted. The 1756-RMC3 only closes the physical layer, not the firmware compatibility gate .

Can the cord survive cabinet door flexing over years?

Only if the service loop is not loaded by the door hinge. Repeated bending at one point, or trapping the jacket in the door gasket, microfractures the cladding and produces gradual attenuation increase that first appears as periodic COM LED flicker before hard SYNC loss.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

2026 World Clean Energy Equipment Conference to Be
Oct 09, 2026
Maxwell
2026 World Clean Energy Equipment Conference to Be Held in Deyang Sichuan October 14-16
When the 2026 World Clean Energy Equipment Conference opens its doors in Deyang, Sichuan Province...
Read More
Wind Turbine Tower Safety Monitoring Standard Takes Effect
Oct 08, 2026
Maxwell
Wind Turbine Tower Safety Monitoring Standard Takes Effect
Wind Turbine Tower Safety Monitoring Standard Takes Effect A new national standard for wind turbine...
Read More
Domestic Wind Turbine Installation Robot Achieves Commercial Application
Oct 08, 2026
Maxwell
Domestic Wind Turbine Installation Robot Achieves Commercial Application
Domestic Wind Turbine Installation Robot Achieves Commercial Application A significant milestone in wind energy operations...
Read More
TotalEnergies Partners with Mistral on Oil and Gas AI
Oct 08, 2026
Maxwell
TotalEnergies Partners with Mistral on Oil and Gas AI
TotalEnergies Partners with Mistral on Oil and Gas AI TotalEnergies has announced a strategic three-year...
Read More
XJ Electric Offshore Wind HVDC Patent Granted
Oct 07, 2026
Maxwell
XJ Electric Offshore Wind HVDC Patent Granted
XJ Electric Offshore Wind HVDC Patent Granted XJ Electric Co., Ltd. and XJ Group have...
Read More
Grid-Forming Technology Scales from Demonstration to Commercial Deployment
Oct 07, 2026
Maxwell
Grid-Forming Technology Scales from Demonstration to Commercial Deployment
Grid-Forming Technology Scales from Demonstration to Commercial Deployment The 2026 Grid-Forming Technology and Equipment Innovation...
Read More
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements
Oct 07, 2026
Maxwell
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements The 2026 World Manufacturing Conference concluded in...
Read More
Lingyang Industrial Large Model 3.5 Released with Three AI Agents
Oct 07, 2026
Maxwell
Lingyang Industrial Large Model 3.5 Released with Three AI Agents
Lingyang Industrial Large Model 3.5 Released with Three AI Agents At the 2026 World Manufacturing...
Read More
Gastops and Vestas Renew MetalSCAN Oil Debris Monitoring Agreement
Oct 06, 2026
Maxwell
Gastops and Vestas Renew MetalSCAN Oil Debris Monitoring Agreement
Gearbox failures on wind turbines announce themselves long before they happen — in the metal...
Read More
XCMG Breaks Ground on Indonesia Mining Equipment Remanufacturing Center
Oct 06, 2026
Maxwell
XCMG Breaks Ground on Indonesia Mining Equipment Remanufacturing Center
On September 16, 2026, in Balikpapan on the island of Borneo, a Chinese construction machinery...
Read More