ALF111-S51 Yokogawa FOUNDATION Fieldbus Communication Module /F9S00
Yokogawa

ALF111-S51 Yokogawa FOUNDATION Fieldbus Communication Module /F9S00

SKU: ALF111-S51
Categories : All Products
In Stock
  • Dimensions: 130 mm x 130 mm x 42 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Yokogawa ALF111-S51 acts as a high-performance digital gateway, enabling the CENTUM VP and ProSafe-RS control systems to interface directly with FOUNDATION Fieldbus (FF) H1 segments. This module serves as a Link Active Scheduler (LAS), managing the precise cyclic and acyclic data exchange required for multi-variable field instruments. By utilizing the ALF111-S51, industrial facilities can transition from traditional analog loops to a fully digital architecture, gaining access to extensive device diagnostics, reduced wiring complexity, and enhanced signal integrity. This specific S51 configuration includes the ISA Standard G3 conformal coating, providing essential defense against atmospheric corrosion in challenging chemical or coastal environments.

Technical Infrastructure and Hardware Profile

The ALF111-S51 is designed for high-density integration within Yokogawa node units, offering reliable digital bus management.

  • Communication Standard: FOUNDATION Fieldbus H1 (31.25 kbps)

  • Number of Ports: 4 segments per module

  • Maximum Devices: Up to 32 devices per module (8 per segment)

  • Digital Interface functionality: Link Active Scheduler (LAS) and Basic Device roles

  • Corrosion Resistance: ISA Standard G3 compliant coating

  • Terminal Interface: Includes ATF9S-00 pressure clamp terminal block

  • Current Consumption: 0.5 A at 5 V DC

  • Module Weight: 0.4 kg (400g)

  • Full Shipping Weight: 2.0 kg

  • Unit Dimensions: 130 mm x 130 mm x 42 mm

  • Environmental Tolerance: 0 to 60 degrees Celsius operating range

Strategic Industrial Applications

The ALF111-S51 is a foundational component for plants seeking data-rich instrumentation and decentralized control.

  • Advanced Process Monitoring: Connecting smart transmitters (pressure, temperature, flow) to the DCS while capturing secondary variables and device health status simultaneously.

  • Corrosive Gas Protection: Operating in refineries or wastewater treatment plants where the G3 coating prevents circuit failure caused by hydrogen sulfide or other industrial pollutants.

  • Redundant Digital Backbones: Implementing dual-module configurations to ensure that communication with field segments remains active even during a module maintenance event.

  • Interoperability Management: Bridging diverse third-party field instruments into a unified Yokogawa control environment through the vendor-neutral FOUNDATION Fieldbus protocol.

FAQ

Q: What is the significance of the /F9S00 suffix on this module?

A: The /F9S00 suffix indicates that the module is supplied with the ATF9S-00 pressure clamp terminal block. This ensures secure and efficient wiring for the four Fieldbus H1 segments directly at the module interface.

Q: How many Fieldbus devices can I connect to a single ALF111-S51?

A: While the technical maximum is 32 devices per module (8 per segment), actual counts may vary based on power supply capacity and the communication traffic requirements of your specific control loops.

Q: Does this module support Link Active Scheduler (LAS) functions?

A: Yes, the ALF111-S51 can function as the LAS for each of its four segments, managing the bus communication schedule and ensuring deterministic data updates.

Q: Is it necessary to use a Fieldbus Power Supply with this module?

A: Yes, the ALF111-S51 provides the communication interface, but an external Fieldbus Power Supply and Power Conditioner are required to provide the necessary DC voltage to the field instruments.

Q: Can the ALF111-S51 be hot-swapped in a running system?

A: In a dual-redundant configuration, the module can be replaced while the system is under power without losing communication with the field instruments, provided the redundant partner module is healthy.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
Oct 18, 2026
Maxwell
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
drone-based infrastructure inspection has moved from experimental pilot projects to long-term service agreements, signaling a...
Read More
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
Oct 18, 2026
Maxwell
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
The International Federation of robotics released its 2026 World Robotics Report on September 24, and...
Read More