ABB TB511-ETH 1SAP111100R0270 Terminal base AC500 V2
ABB TB511-ETH 1SAP111100R0270 Terminal base AC500 V2
ABB

ABB TB511-ETH 1SAP111100R0270 Terminal base AC500 V2

SKU: 1SAP111100R0270
Categories : ABB
In Stock
  • Dimensions: 10.2 x 5.1 x 15.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for central processor mounting and field communication expansion in AC500 V2 platforms, the ABB 1SAP111100R0270 (TB511-ETH Terminal base) provides direct physical/electrical execution.

Architectural Suffix & Hardware Breakdown

  • TB511-ETH: Base module designation for AC500 V2 terminal bases incorporating Ethernet routing and dual serial ports.
  • 1SAP111100R0270: Official commercial part number identifying standard replacement and new assembly stock.
  • AC500 V2 Compatibility: Dedicated physical layout matching second-generation processor units and expansion slots.
  • 1 Communication Slot: Holds one expansion communication module alongside onboard Ethernet and serial interfaces.

Technical Performance Parameters

Parameter Specification
Model TB511-ETH (1SAP111100R0270)
Brand ABB
Origin Sweden
Weight 0.20 kg
Shipping Dimensions 10.2 x 5.1 x 15.2 cm
Product Type Terminal Base
Series AC500 V2
Supply Voltage 24 VDC
Input Voltage Type DC
Interfaces D-SUB, RJ45, Terminal Blocks
Communication Ports 1 Ethernet, 2 Serial (RS232/RS485)
Degree of Protection IP20
Operating Temperature 0 to +60 deg C
Power Consumption Passive bus backplane (approx. 0.1 W)
Tariff Code 8537101190

Deterministic Network & Backplane Velocity

The unit establishes low-latency signal distribution across the internal backplane bus, supporting high backplane bus communication velocity Licences for real-time task control. Full firmware flash compatibility on attached CPU units ensures instant synchronization with Profinet and EtherNet/IP deterministic networks without data packet distortion.

Delivery Package Items

  • 1 x ABB TB511-ETH (1SAP111100R0270) Terminal Base
  • 1 x Protective Static-Shielding Box
  • 1 x Hardware Mounting Information Leaflet

Mechanical Mounting & Field Wiring Rules

DIN-Rail Enclosure Assembly

  • Mount the base unit onto a standard 35 mm DIN rail inside an IP54 industrial control enclosure.
  • Secure side locking clips to maintain bus connector continuity with adjacent I/O terminal units.

Communication & Power Termination

  • Connect a 24 VDC supply to the primary power input terminals to feed the CPU internal rail.
  • Route serial RS232/RS485 wiring via D-SUB/terminals and Ethernet via RJ45 using shielded twisted-pair cables grounded at the enclosure entrance.

Frequently Asked Questions

  • Can CPU modules be unseated from the TB511-ETH base while 24 VDC power is active?

    No, removing or inserting CPU modules on a live terminal base can cause electrical arcing and backplane port corruption.

  • What interface connections are provided on the base unit?

    The hardware features one RJ45 Ethernet port, D-SUB and terminal blocks for two serial interfaces (RS232/RS485).

  • What is the ingress protection rating of the terminal base housing?

    The module housing conforms to IP20 ingress protection standards, requiring installation in a sealed cabinet.

  • What input supply voltage is required for terminal base operation?

    The terminal base requires a nominal power supply voltage of 24 VDC.

  • How many communication expansion slots are present on the unit?

    The TB511-ETH terminal base contains 1 slot for an additional communication module.

  • What ambient temperature range is allowable during continuous execution?

    The terminal base operates continuously in thermal environments ranging from 0 deg C to +60 deg C.

  • How is shielding connected for serial and Ethernet lines?

    Connect cable shields directly to the functional earth DIN rail using conductive clamping blocks near terminal entry points.

  • Does the terminal base draw significant operating power?

    No, the unit functions as a passive backplane routing base with negligible internal power consumption.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More
China Intelligent Technology Empowers Global South
Oct 11, 2026
Maxwell
China Intelligent Technology Empowers Global South Mining Development
China's mining intelligence technologies are gaining international recognition as countries across the Global South seek...
Read More
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
Oct 11, 2026
Maxwell
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
The city of Luliang in Shanxi Province has emerged as a showcase for the transformation...
Read More
2026 Hefei International New Energy Vehicle Exhibi
Oct 11, 2026
Maxwell
2026 Hefei International New Energy Vehicle Exhibition Opens September 30
The 2026 Hefei International New Energy Vehicle Exhibition opened on September 30 at the Hefei...
Read More