ABB 086444-001 MPRC Scanning Board
ABB 086444-001 MPRC Scanning Board
ABB 086444-001 MPRC Scanning Board
ABB

ABB 086444-001 MPRC Scanning Board

SKU: 086444-001
Categories : ABB
In Stock
  • Dimensions: 24 x 19 x 5.3 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB 086444-001 functions as a high performance MPRC scanning board designed to manage high speed data acquisition and sensor communication within industrial control networks. It resolves the challenge of maintaining low latency data throughput between the physical scanning sensors and the central processing unit in complex Distributed Control Systems. By integrating dual Ethernet ports and specialized HDLC ports, this board provides the necessary bandwidth and redundancy for real time process monitoring. It is particularly effective in high demand environments where the synchronization of sensor data across multiple network channels is critical for system stability and accurate diagnostic visibility.

Essential Hardware Parameters

Feature Specification Details
Brand ABB
Model Number 086444-001
Series Identifier MPRC Scanning System
Component Type Ethernet Scanning Board
Communication Ports Dual Ethernet and Multiple HDLC Ports
Network Interface J2 Connector and ASPC Host Interface
Indicators ERROR RUN and TX LED Status Lights
Net Weight 1.22 kg
Physical Dimensions 24 x 19 x 5.3 cm
Regulatory Compliance CE Mark Standard with Fiberoptic Support
Manufacturing Origin Sweden
System Category DCS Automation Infrastructure

Model Code Decomposition

The technical numbering system for the 086444-001 MPRC provides specific information regarding the hardware revision and functional load:

  • 086444: This base numerical sequence identifies the unique circuit architecture for the Multi Protocol Remote Controller scanning family.

  • 001: Denotes the primary hardware revision level. This version is optimized for Ethernet based Smart Platform configurations, ensuring full compatibility with J6 host connectors on the ASPC backplane.

  • MPRC: Standing for Multi Protocol Remote Controller, this indicates the board's capability to translate various industrial communication protocols, including HDLC and TCP IP, into a unified data stream for the host controller.

Installation Strategy and Wiring

To maintain network integrity and comply with electromagnetic compatibility standards, the following installation protocols are required:

  • Host Integration: The board must be seated into the ASPC backplane using the J2 and J6 connectors. Ensure the board is fully inserted and the locking screws are secured to maintain a stable ground connection.

  • Redundant Networking: Utilize the specialized Ethernet Y cable to establish a redundant link between the board and the host. The secondary port should be routed through a shielded grounding block on the cabinet door to minimize interference.

  • Fiberoptic Connection: For sites requiring CE Mark compliance, use high quality fiberoptic cables equipped with ST connectors. This is essential for maintaining isolated sensor communication over long distances or in high noise areas.

  • Diagnostic Monitoring: Upon power up, verify that the RUN LED remains illuminated and the TX LEDs flash during data exchange. An active ERROR LED indicates a protocol mismatch or a backplane connection fault.

FAQ Frequently Asked Questions

What is the purpose of the unused HDLC ports 2 and 3?

In standard Smart Platform configurations, ports 2 and 3 are reserved for future expansion or custom sensor arrays. For most applications, primary sensor communication is handled through port 1 and the Ethernet backbone.

Can this board be used without the fiberoptic ST cable?

While the board will function with standard copper connections for internal testing, fiberoptic cabling with ST connectors is required for full industrial compliance and to meet European CE standards in production environments.

How does the board handle a failure on one Ethernet channel?

The 086444-001 is designed for redundancy. If data transmission is interrupted on the primary channel, the board automatically routes traffic through the secondary Ethernet interface to ensure continuous process monitoring without system downtime.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Sep 03, 2026
Shopify API
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Few engineering achievements capture the imagination quite like Shell Prelude. Moored approximately 475 kilometers off...
Read More
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
Sep 03, 2026
Shopify API
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
In the high-stakes world of offshore and onshore gas production, few projects carry the geopolitical...
Read More
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
Sep 03, 2026
Shopify API
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
The industrial automation landscape is shifting rapidly as manufacturers demand greater flexibility from their control...
Read More
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Sep 03, 2026
MaxWell
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Critical Manufacturing is preparing to demonstrate how manufacturers can use MES, industrial connectivity, manufacturing analytics and...
Read More
Automation Can Create a Hidden Single-Point-of-Failure Risk
Sep 03, 2026
MaxWell
Automation Can Create a Hidden Single-Point-of-Failure Risk
As factories become more automated, the biggest operational risk may not always be a failed...
Read More
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
Sep 02, 2026
MaxWell
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
The cybersecurity of water and wastewater infrastructure is drawing renewed attention across the industrial automation...
Read More
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Sep 02, 2026
MaxWell
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Manufacturers have spent years treating automation as a straightforward answer to labor shortages, rising costs...
Read More
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Sep 02, 2026
MaxWell
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Renesas Electronics has officially opened its Physical AI & Robotics Lab in Beijing, marking another significant...
Read More
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
Sep 01, 2026
MaxWell
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
OMRON Robotics is showcasing its latest mobile industrial automation advancements at Automate 2026 in Chicago,...
Read More