ABB 086349-002 MPRC PCB Board
ABB 086349-002 MPRC PCB Board
ABB 086349-002 MPRC PCB Board
ABB

ABB 086349-002 MPRC PCB Board

SKU: 086349-002
Categories : ABB
In Stock
  • Dimensions: 24 x 19 x 5.3 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB 086349-002 is a high performance Multi Protocol Remote Controller circuit board designed to resolve complex signal processing and communication challenges in Distributed Control Systems. It functions as an intelligent node that manages data flow between central processors and field peripherals. This board addresses the need for real time diagnostics and high availability by incorporating a sophisticated LED monitoring system and self checking startup routines. It is engineered to identify internal memory faults or communication interruptions instantly, ensuring that industrial automation systems maintain peak operational integrity and reducing the time required for system troubleshooting in mission critical environments.

Essential Hardware Parameters

Feature Specification Details
Brand ABB
Model Number 086349-002
Component Category MPRC PCB Board
Processor Monitoring Variable Intensity RUN LED
Status Interface Multi LED Diagnostic Indicators
Internal Interface HDLC Serial and CPU Memory Bus
Communication Support Ethernet and Host Terminal Connectivity
Net Weight 1.22 kg
Physical Dimensions 24 x 19 x 5.3 cm
Manufacturing Origin Sweden
System Application ABB Industrial DCS and Power Management

Model Code Decomposition

The designation MPRC 086349-002 follows the ABB technical identification standard for industrial control electronics:

  • MPRC: Stands for Multi Protocol Remote Controller, identifying the board as a versatile communication and logic interface capable of handling multiple data standards.

  • 086349: The primary part number representing the specific PCB layout and hardware architecture used for high speed signal processing.

  • 002: Denotes the second hardware revision level. This version includes updated memory modules and refined diagnostic firmware compared to the 001 release, offering improved stability during high demand processor cycles.

Installation Strategy and Wiring

To ensure correct initialization and prevent hardware damage, the following installation protocols must be followed:

  • Hardware Seating: Insert the PCB board into the designated slot within the control rack. Ensure the edge connectors are aligned and the board is pushed firmly into the backplane. Secure the mounting screws to provide a consistent ground reference.

  • Startup Verification: Upon applying power, observe the RUN LED. Normal operation is confirmed when the RUN LED flashes (brightness varies with processor load) and the Status LED remains off. If the Status LED is continuously lit, the board must be replaced immediately.

  • Serial Connectivity: Connect the HDLC serial interface and Ethernet router links according to the system topology map. Use shielded cables for all external connections to minimize electromagnetic interference.

  • Command Initialization: Use the system console to verify that the startup messages appear. Successful initialization is confirmed when the console displays the CPU memory and RAM disk check results. If no messages appear, verify the jumper and switch settings on the board.

FAQ Frequently Asked Questions

What does it mean if the Status LED is flashing?

A flashing Status LED indicates that the board is operational but requires attention via the system console. This typically occurs during a firmware update or when a non-critical error has been logged in the RAM disk.

Can this board be hot-swapped while the DCS is running?

Hot swapping is generally not recommended for the MPRC series unless your specific rack configuration and controller software are explicitly rated for live insertion. Power down the rack segment before replacement to avoid electrical arcing on the bus pins.

Is the 086349-002 compatible with older MPRC 086349-001 systems?

Yes, the 002 revision is designed to be backwards compatible. However, it is advisable to verify that your current system firmware supports the updated diagnostic features found in the 002 revision for optimal performance.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More