6ES7901-3DB30-0XA0 Siemens USB/PPI Multi-Master Programming Cable
6ES7901-3DB30-0XA0 Siemens USB/PPI Multi-Master Programming Cable
6ES7901-3DB30-0XA0 Siemens USB/PPI Multi-Master Programming Cable
Siemens

6ES7901-3DB30-0XA0 Siemens USB/PPI Multi-Master Programming Cable

SKU: 6ES7901-3DB30-0XA0
Categories : All Products
In Stock
  • Dimensions: 19cm x 14cm x 3cm
  • Country of origin: Germany
  • Payment: T/T, Western Union
  • Shipping port: Xiamen

Request a quote

1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Siemens 6ES7901-3DB30-0XA0 is a specialized USB-to-PPI (Point-to-Point Interface) multi-master cable designed to facilitate high-speed communication between a PC and the SIMATIC S7-200 PLC series. Unlike standard serial cables, this interface supports multi-master communication, allowing the programming device to coexist with other masters (like HMIs) on the same network. It serves as the primary gateway for uploading, downloading, and monitoring PLC logic, ensuring a stable connection for industrial debugging and system maintenance.

Note: The original text contained conflicting information regarding S7-300 memory modules; please be advised that the 6ES7901-3DB30-0XA0 is strictly a communication interface for the S7-200 line.

Hardware Parameters and Physical Specifications

Attribute Technical Detail
Model Number 6ES7901-3DB30-0XA0
Interface Type USB to RS485 (PPI)
Protocol Support PPI Multi-Master, PPI, Freeport
Net Weight 0.22 kg
Physical Dimensions 19cm x 14cm x 3cm
Cable Length Approximately 5 meters
Status Indicators LED for Send, Receive, and Power
Country of Origin Germany

Industrial Deployment Scenarios

This communication adapter is essential for engineers and technicians working within the SIMATIC S7-200 ecosystem. It is primarily utilized for:

  • Logic Programming and Troubleshooting: Connecting a laptop via USB to the PLC's integrated RS485 port for real-time monitoring of ladder logic.

  • HMI Integration: Configuring communication parameters for text displays and touch panels within a multi-master environment.

  • Data Acquisition: Extracting process data from the PLC for analysis in PC-based software applications.

  • Field Service: Reliable firmware updates and program modifications in harsh environments where signal integrity is paramount.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Jun 05, 2026
MaxWell
ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Industrial technology leaderABBRobotics has signed a memorandum of understanding with Mettler Toledo to bridge collaborative...
Read More
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Jun 05, 2026
MaxWell
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Global engineering technology leaderEmersonhas introduced its PACSystems IPC 2010, a compact and rugged industrial computer...
Read More
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Jun 05, 2026
MaxWell
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Industrial robotics manufacturer KUKA has formed a strategic partnership with Micropsi Industries to offer the...
Read More
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Jun 05, 2026
MaxWell
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Industrial automation instrumentation manufacturer Banner Engineering has released its DXM1200-B2 and DXM1200-X2 wireless controller series,...
Read More
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Jun 05, 2026
MaxWell
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Global automation components manufacturer Idec has expanded its SmartAXIS Touch hardware family with the introduction...
Read More
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Jun 05, 2026
MaxWell
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Industrial automation leaderRockwell Automationhas expanded its visualization hardware portfolio with the launch of the ASEM...
Read More
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Jun 04, 2026
MaxWell
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Industrial automation giantFanuchas officially opened a new 650,000-square-foot West Campus facility in Auburn Hills, Michigan,...
Read More
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
Jun 04, 2026
MaxWell
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
To minimize panel footprints and accelerate deployment timelines for machine builders,Rockwell Automationhas expanded its ruggedized...
Read More
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Jun 04, 2026
MaxWell
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Global energy management and automation specialistSchneider Electrichas unveiled an expansive suite of industrial technology designed...
Read More
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Jun 04, 2026
MaxWell
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Schneider Electric presented a comprehensive showcase of its next-generation smart manufacturing portfolio, demonstrating how a...
Read More