57310001-CC Processor Unit DSPC171 ABB MasterPiece Series
57310001-CC Processor Unit DSPC171 ABB MasterPiece Series
57310001-CC Processor Unit DSPC171 ABB MasterPiece Series
ABB

57310001-CC Processor Unit DSPC171 ABB MasterPiece Series

SKU: 57310001-CC
Categories : ABB
In Stock
  • Dimensions: 4cm x 24.7cm x 24.3cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB DSPC171, identified by the order code 57310001-CC, is a high-integrity central processing unit specifically engineered for the MasterPiece and Advant Distributed Control System (DCS) families. As the primary computational engine of the controller rack, this processor manages the execution of complex control logic, sequence programs, and high-speed data calculations. Designed to provide a deterministic execution environment, the DSPC171 ensures that industrial processes remain synchronized and responsive. Its architecture is built for long-term lifecycle support in high-availability environments, offering a robust solution for plants that require continuous logic processing without the risk of software jitter or hardware latency.

Core Processing Architecture and Hardware Specifications

  • Module Function Master Central Processor Unit (CPU)

  • Model Identifier DSPC171

  • Product Number 57310001-CC

  • Processing Clock Speed 2 GHz advanced architecture for rapid instruction cycles

  • Onboard Volatile Memory 1 GB RAM for real-time data handling

  • Non-Volatile Storage 8 GB Flash memory for application code and system backups

  • Network Connectivity Triple-stack support for Ethernet, Profinet, and CANopen

  • Thermal Operating Range Verified performance from -20°C to +60°C

  • Net Weight 0.9kg

  • Physical Proportions 4cm x 24.7cm x 24.3cm

  • Manufacturing Origin Sweden

  • Tariff Classification (HS) 8537101190

Industrial Deployment and System Utility

The DSPC171 57310001-CC is a cornerstone in heavy-duty process industries such as pulp and paper manufacturing, chemical processing, and metals refining. Within a MasterPiece control cabinet, this processor acts as the intelligence hub, coordinating information flow between decentralized I/O modules and the supervisory HMI. Its 0.9kg Swedish-engineered frame is built to withstand the electromagnetic interference (EMI) and thermal fluctuations common in industrial sub-stations. By utilizing integrated Ethernet and Profinet gateways, the DSPC171 allows for seamless data transparency across the enterprise network, enabling advanced diagnostics and real-time optimization of production loops. This reliability is vital for maintaining the strict uptime requirements of modern B2B industrial operations.

FAQ

Q: Is the DSPC171 57310001-CC compatible with existing MasterPiece 200/1 setups?

A: The DSPC171 is designed for high-level compatibility within the MasterPiece and Advant range; however, specific backplane requirements and firmware revisions should be verified to ensure seamless integration with legacy I/O clusters.

Q: How does the 8 GB Flash memory benefit the system during a power loss?

A: The integrated Flash memory ensures that all critical application software and system parameters are stored non-volatiles, allowing the controller to reboot and resume logic execution instantly once power is restored.

Q: Does this 0.9kg processor unit support redundant configurations?

A: Yes, the DSPC171 can typically be configured in a redundant pair (duty/standby) within the DCS to provide a bumpless transfer in the event of a primary hardware fault, maximizing facility uptime.

Q: What is the significance of the 57310001-CC order code?

A: This part number refers to the specific hardware revision and coating of the module. Matching this exactly ensures that the replacement unit has the same electrical characteristics and environmental certifications as the original.

Q: Can the communication ports be used for third-party device integration?

A: Absolutely. By supporting CANopen and Profinet, the DSPC171 allows for the direct integration of third-party drives, sensors, and actuators into the MasterPiece control architecture without requiring external gateways.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
Oct 18, 2026
Maxwell
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
drone-based infrastructure inspection has moved from experimental pilot projects to long-term service agreements, signaling a...
Read More
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
Oct 18, 2026
Maxwell
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
The International Federation of robotics released its 2026 World Robotics Report on September 24, and...
Read More