3HAC5393-2 ABB DSQC508 Battery Unit Robotics S4C+
3HAC5393-2 ABB DSQC508 Battery Unit Robotics S4C+
3HAC5393-2 ABB DSQC508 Battery Unit Robotics S4C+
ABB

3HAC5393-2 ABB DSQC508 Battery Unit Robotics S4C+

SKU: 3HAC5393-2
Categories : ABB
In Stock
  • Dimensions: 24 x 19 x 5.3cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for volatile memory protection in S4C+ robotic control architectures, the ABB DSQC508 3HAC5393-2 (DSQC508 3HAC5393-2 Battery Unit) provides direct electrical backup to maintain program integrity and coordinate data during loss of primary power. This hardware component interfaces with the controller's internal power bus to ensure persistent data retention for system parameters and position registers.

Model Identification

The DSQC508 3HAC5393-2 part number indicates the specific battery carrier assembly utilized within the S4C+ control cabinet. This unit is designed to hold the 3HAC5105-1 battery cells (revision 10 or higher), providing the necessary voltage levels for memory bias current maintenance.

Hardware Specifications

Parameter Specification
Model DSQC508 3HAC5393-2
Brand ABB
Origin Sweden
Weight 1.22 kg
Shipping Dimensions 24.0 x 19.0 x 5.3 cm
Operating Temp -25 deg C to +55 deg C
Power Consumption Passive Backup Source
Compatibility S4C+ System

ABB Industrial Control & Drive Communication

The DSQC508 integration supports the broader S4C+ backplane bus requirements for low-power volatile data storage. While the unit functions as a passive electrochemical source, it must maintain compatibility with the controller's monitoring thresholds to prevent false low-battery interrupts. The integration allows for effective I/O density scaling regarding memory-mapped data points, ensuring that critical configuration registers remain within active firmware flash compatibility limits during total power loss.

## Ordering info

  • DSQC508 3HAC5393-2 battery unit assembly.

  • Compatible with ABB 3HAC5105-1 battery cells (required, verify revision 10 or higher).

  • Anti-static protective packaging included.

Field Installation Guidelines

Installation

  • Ensure the robot controller is in a safe, powered-down state before replacing the battery unit to avoid accidental data corruption.

  • Slide the battery unit into the designated controller slot until the mechanical retention clips engage.

Connection

  • Connect the battery cable to the system board header, verifying that the connector is fully seated to prevent intermittent contact.

  • Update the system date and verify the battery status indicator in the controller's service diagnostics menu upon re-energizing.

Frequently Asked Questions

  • Q: Is the DSQC508 capable of hot-swapping?

    A: No, battery unit replacement should be performed while the controller is powered down to ensure consistent initialization of the memory backup circuit.

  • Q: How does the controller monitor the health of the battery?

    A: The controller measures the terminal voltage of the battery pack; if it falls below the minimum bias threshold, a system alarm is generated.

  • Q: What is the impact of using an incorrect battery revision?

    A: Using a battery below revision 10 may result in improper voltage regulation, potentially leading to memory corruption or reduced service life.

  • Q: Is firmware synchronization required after battery replacement?

    A: No, as this is a passive backup source, the controller firmware does not require synchronization; however, clearing status alarms is recommended.

  • Q: Does the battery unit protect program data during cold starts?

    A: Yes, it ensures that non-volatile memory parameters remain intact during system resets or external power-off cycles.

  • Q: How is the battery unit shielded from electrical noise?

    A: The unit chassis provides physical shielding, and the cabling must be routed through protected channels to minimize electromagnetic interference.

  • Q: What is the typical shelf life of these battery units?

    A: Shelf life varies based on environmental storage conditions; units should be installed within the manufacturer's specified period to guarantee capacity.

  • Q: Can I use this unit for S4 or S4C controllers?

    A: This unit is specifically engineered for S4C+ controllers; verify system compatibility with technical manuals before installation.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

RWE and KKR Finalize $16 Billion Investment in UK Offshore Wind Projects
Nov 21, 2026
Maxwell
RWE and KKR Finalize $16 Billion Investment in UK Offshore Wind Projects
The United Kingdom's offshore wind sector received a monumental boost on November 11, 2026, as...
Read More
Logistics and Automation Madrid 2026 Opens with 420 Exhibitors and 12,200 Visitors
Nov 21, 2026
Maxwell
Logistics and Automation Madrid 2026 Opens with 420 Exhibitors and 12,200 Visitors
The Logistics & Automation Madrid 2026 exhibition opened on November 11 at IFEMA Madrid, bringing...
Read More
SpaceX Starship Booster 22 Moved to Launch Pad for 15th Test Flight with Full Rocket Recovery Attempt
Nov 21, 2026
Maxwell
SpaceX Starship Booster 22 Moved to Launch Pad for 15th Test Flight with Full Rocket Recovery Att...
SpaceX has moved Super Heavy Booster 22 to the launch pad at Starbase, Texas, in...
Read More
North American Robot Orders Surge 24.8 Percent in Q3 2026 Led by Automotive and Semiconductor
Nov 20, 2026
Maxwell
North American Robot Orders Surge 24.8 Percent in Q3 2026 Led by Automotive and Semiconductor
North American robot orders increased 24.8 percent in the third quarter of 2026 compared to...
Read More
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Nov 20, 2026
Maxwell
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Torus Energy Storage has been named Battery Manufacturer of the Year at the 2026 Battery...
Read More
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More