3BSE071500R1 ABB CEX-bus Interconnection Unit BC820K02 Kit AC 800M
ABB

3BSE071500R1 ABB CEX-bus Interconnection Unit BC820K02 Kit AC 800M

SKU: 3BSE071500R1
Categories : ABB
In Stock
  • Dimensions: 185 mm x 59 mm x 127.5 mm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The BC820K02 is a specialized CEX-Bus Interconnection Kit manufactured by ABB, designed to facilitate the expansion and segmentation of communication ports within the AC 800M controller architecture. This unit serves as a high-availability bridge, allowing the CEX-Bus to be partitioned into two distinct segments separated by distances of up to 200 meters. By enabling the use of redundant communication interfaces and supporting the extension of RCU-Link signals, the BC820 ensures that critical automation networks remain robust and fault-tolerant. The module is engineered to support professional-grade uptime requirements, featuring native support for hot-swapping and online CPU replacement without interrupting system processes.

Core Hardware Parameters and Environmental Data

Technical Specification Detail Value
Model Designation BC820K02 (Interconnection Kit)
Order Number 3BSE071500R1
Nominal Supply Voltage 24 V DC (Range: 19.2 to 30 V DC)
Power Consumption 120 mA typical / 200 mA maximum
Heat Dissipation 2.9 W
Redundancy Support Yes (RCU-Link and Power)
Dimensions (Unit) 185 mm (H) x 59 mm (W) x 127.5 mm (D)
Total Kit Weight 1.4 kg (3.1 lbs)
Protection Standard IP20 (EN 60529)
Operating Limits +5 to +55 °C
  • Processor Compatibility: Fully compatible with PM858, PM862, PM866, and PM866A controller units.

  • Interface Capacity: Manages up to 6 CEX-Bus interfaces per interconnection unit.

  • Expansion Limits: Extends physical bus and RCU-Link cable reach to a maximum of 200 meters via optical and copper links.

  • Hot Swap Capability: Designed for maintenance and module replacement while the system remains energized.

  • Kit Contents: Includes 2x BC820 units, 2x TP850 baseplates, 2x TK857 RCU-link cables, and 2x TB850 terminators.

Industrial Deployment Contexts

This interconnection unit is primarily utilized in large-scale Distributed Control Systems (DCS) where geographical separation of hardware or high levels of fault tolerance are mandatory. In sectors such as oil and gas or power generation, the BC820K02 allows engineers to place redundant communication modules in different physical cabinets to prevent a localized failure from compromising the entire network. Its Swiss-engineered reliability makes it a staple for maritime applications, as evidenced by its ABS and DNV-GL certifications. Furthermore, the 200-meter extension capability is vital for sprawling manufacturing facilities that require synchronized control over extended distances without degrading signal integrity or increasing latency.

FAQ

Q: Does the BC820K02 kit include the 200-meter long-distance fiber optic cables?

A: No, the long-distance RCU Control Link (RJ45 crossover) and RCU Data Link (OM3 fiber) cables are not included in the kit and must be sourced separately to meet the specific length requirements of your installation.

Q: Can the BC820 operate without an external power supply?

A: While the BC820 can draw power directly from the processor via the CEX-Bus, utilizing the external power connector is highly recommended to provide redundant power and ensure the highest level of system availability.

Q: Which fiber optic connector type is required for the RCU Data Link?

A: The unit is compatible with LC Duplex optical connectors conforming to ANSI TIA/EIA60-10 standards, specifically optimized for 50/125μm OM3 multimode fiber.

Q: Is this module suitable for use in explosive atmospheres?

A: Yes, the BC820K02 carries cULus Class 1, Zone 2, and ExnA IIC T4 Gc X certifications, making it suitable for hazardous locations where specific safety protocols are required.

Q: What is the maximum number of CEX-Bus interfaces supported by a single unit?

A: Each BC820 interconnection unit is limited to supporting a maximum of 6 CEX-Bus interfaces to maintain optimal signal performance and processing speed.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Turck Enhances Plant Layout Flexibility with Ultra-Compact IMX18 Safety Barriers and LRS510 IO-Link Radar Sensors
Jul 20, 2026
MaxWell
Turck Enhances Plant Layout Flexibility with Ultra-Compact IMX18 Safety Barriers and LRS510 IO-Li...
Industrial manufacturing facilities are continuously pressured to decrease their physical footprints while simultaneously scaling up...
Read More
Schneider Expands U.S. Manufacturing Infrastructure as ForwardX and Lynx Drive European AMR Growth
Jul 20, 2026
MaxWell
Schneider Expands U.S. Manufacturing Infrastructure as ForwardX and Lynx Drive European AMR Growth
The industrial automation and power distribution sectors are undergoing rapid transformations driven by the exponential...
Read More
Weintek Redefines Floor Mobility with New cMT3106XM Handheld HMI
Jul 20, 2026
MaxWell
Weintek Redefines Floor Mobility with New cMT3106XM Handheld HMI
As manufacturing facilities grow in size and operational complexity, fixed control panel layouts can introduce...
Read More
Wenglor Launches AI Lab to Streamline Industrial Image Processing Workflows
Jul 19, 2026
MaxWell
Wenglor Launches AI Lab to Streamline Industrial Image Processing Workflows
Wenglor Sensoric Group has unveiled its new AI Lab, a cloud-based platform engineered to accelerate the...
Read More
AutoStore Unveils Fall 2025 Portfolio to Enhance Warehouse Throughput and Operational Efficiency
Jul 19, 2026
MaxWell
AutoStore Unveils Fall 2025 Portfolio to Enhance Warehouse Throughput and Operational Efficiency
AutoStore has officially launched its Fall 2025 product portfolio, introducing a suite of seven modular...
Read More
Ati Motors Introduces Sherpa Mecha for Adaptive Industrial Automation
Jul 19, 2026
MaxWell
Ati Motors Introduces Sherpa Mecha for Adaptive Industrial Automation
Ati Motors has expanded the boundaries of robotic material handling with the launch of Sherpa...
Read More
Cincoze Expands Industrial Edge Capabilities with MD-3000 DIN-Rail Computer Series
Jul 18, 2026
MaxWell
Cincoze Expands Industrial Edge Capabilities with MD-3000 DIN-Rail Computer Series
Cincoze has bolstered its MAGNET industrial computing portfolio with the launch of the MD-3000 series,...
Read More
Banner Engineering Enhances Predictive Maintenance with IO-Link Enabled QM30VT3 Sensors
Jul 18, 2026
MaxWell
Banner Engineering Enhances Predictive Maintenance with IO-Link Enabled QM30VT3 Sensors
Banner Engineering has updated its QM30VT3 three-axis vibration and temperature sensor, integrating IO-Link connectivity to bridge the...
Read More
Yokogawa Launches OpreX A8 Edge Controller to Streamline Data-Centric Automation
Jul 18, 2026
MaxWell
Yokogawa Launches OpreX A8 Edge Controller to Streamline Data-Centric Automation
Yokogawa has officially unveiled its new OpreX Intelligent Edge Controller A8, a Linux-based platform engineered to...
Read More
ABB Launches Baldor-Reliance SP4 Shaft-Ground Motors for Longer VSD Service Life
Jul 17, 2026
MaxWell
ABB Launches Baldor-Reliance SP4 Shaft-Ground Motors for Longer VSD Service Life
ABB has introduced a new addition to its Baldor-Reliance SP4 motor portfolio, bringing integrated shaft-grounding...
Read More