3BHE021887R0101 UBCC717BE101 ABB VVP Board AC 800PEC
3BHE021887R0101 UBCC717BE101 ABB VVP Board AC 800PEC
ABB

3BHE021887R0101 UBCC717BE101 ABB VVP Board AC 800PEC

SKU: 3BHE021887R0101 UBCC717BE101
Categories : ABB
In Stock
  • Dimensions: 35 x 29 x 6 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 3BHE021887R0101 UBCC717BE101, also cataloged as the UBCC717BE101 VVP Board Coated, operates as a dedicated hardware component for pulse processing and interface management within AC 800PEC control systems.

Ordering Code Structure

  • UBCC717BE101: Specific hardware revision designation and PC board module function.
  • 3BHE021887R0101: Primary ABB part number identification code.
  • VVP Board Coated: Hardware configuration featuring conformal coating for environmental protection against atmospheric contaminants and moisture.

Physical & Technical Specifications

Parameter Specification
Model 3BHE021887R0101 UBCC717BE101
Brand ABB
Product Type PC Board (VVP-Board Coated)
System Platform AC 800PEC
Country of Origin Sweden
Tariff Code 8537101190
Weight 2.64 kg
Shipping Dimensions 35 x 29 x 6 cm
Coating Conformal Coated Board
Operating Temperature 0 to +55 deg C
Storage Temperature -40 to +70 deg C

Backplane Communication & Deterministic Processing

The module interfaces directly with the high-speed AC 800PEC backplane bus communication velocity. Internal circuitry handles high-speed pulse feedback processing and signal conditioning required for high-power semiconductor drive systems. Deterministic response times ensure synchronization across the internal bus architecture, while firmware flash compatibility ensures alignment with the host AC 800PEC controller version.

Order Fulfillment Details

  • 1x ABB 3BHE021887R0101 UBCC717BE101 VVP Board Coated
  • 1x Factory ESD protective packaging enclosure

Mechanical Installation & Wiring Protocols

Handling and ESD Safeguards

  • Maintain grounded wrist strap connection during handling to prevent electrostatic damage.
  • Keep the board inside conductive ESD packaging until immediate insertion into the rack frame.

Cabinet Mounting and Clearance

  • Mount horizontally within the designated subrack slot using guide rails.
  • Ensure a minimum vertical clearance of 50 mm above and below the rack for free air convection.
  • Secure retention screws with a torque limit of 0.8 Nm to ensure proper ground contact and mechanical stability.

Signal Shielding and Earth Grounding

  • Connect cable shields directly to the cabinet ground bar using low-impedance grounding clamps.
  • Separate high-voltage power conduits from low-voltage I/O and communication lines by at least 200 mm.

Technical Support FAQs

  • What is the significance of the conformal coating on this module?

    The coating shields electronic components from humidity, dust, and corrosive airborne contaminants present in industrial drive environments.

  • Is the UBCC717BE101 board hot-swappable during operation?

    No. Power to the AC 800PEC subrack must be completely de-energized before removing or installing the board.

  • How is chassis ground continuity established for the circuit board?

    Ground continuity relies on direct contact between the board metal frame, guide rails, and cabinet earth ground bar.

  • What is the proper procedure for storing a spare VVP board?

    Store the module inside its original sealed ESD shielding bag at temperatures between -40 deg C and +70 deg C.

  • Does this unit require a dedicated external power supply connection?

    Operating power is drawn directly through the backplane connection interface of the AC 800PEC subrack assembly.

  • Can the firmware on the board be upgraded independently?

    Firmware flash compatibility is synchronized automatically through the main controller loading routine upon system startup.

  • What cable type is required for external I/O terminals?

    Use twisted-pair shielded cables with a minimum copper cross-section of 0.5 mm2 (AWG 20) for noise suppression.

  • How do I verify physical seating after insertion into the rack?

    Verify that front panel retention screws line up properly and thread smoothly without forcing the connector pins.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More