3BHE016011R0002 UNS0118a-Z ABB Control Module AC 800PEC
3BHE016011R0002 UNS0118a-Z ABB Control Module AC 800PEC
3BHE016011R0002 UNS0118a-Z ABB Control Module AC 800PEC
3BHE016011R0002 UNS0118a-Z ABB Control Module AC 800PEC
3BHE016011R0002 UNS0118a-Z ABB Control Module AC 800PEC
ABB

3BHE016011R0002 UNS0118a-Z ABB Control Module AC 800PEC

SKU: 3BHE016011R0002 UNS0118a-Z
Categories : ABB
In Stock
  • Dimensions: 2.5 cm x 24.5 cm x 26.1 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-speed digital task execution and real-time fieldbus processing in AC 800PEC architectures, the ABB 3BHE016011R0002 UNS0118a-Z (UNS0118a-Z Control Module) provides direct physical/electrical execution.

Hardware Variant Identification

  • UNS0118a-Z: Hardware revision reference and specific control card board topology.

  • 3BHE016011R0002: Primary system ordering part number assigned by ABB.

  • AC 800PEC: Targeted high-performance controller platform designed for power electronics application processing.

Technical Performance Parameters

Parameter Specification
Model 3BHE016011R0002 UNS0118a-Z
Brand ABB
Product Type Control Module
Series AC 800PEC
Country of Origin Sweden
Tariff Code 8537101190
Nominal Supply Voltage 24 VDC (+/-20%)
Power Consumption 10 W
Operating Temperature -20 to +60 deg C
Storage Temperature -40 to +85 deg C
Relative Humidity 5% to 95% (non-condensing)
Fieldbus Protocols CAN, Modbus
Weight 0.94 kg
Shipping Dimensions 2.5 x 24.5 x 26.1 cm

Bus Communication and Firmware Synchronization

The unit integrates with deterministically prioritized backplane communication channels to achieve continuous I/O density scaling across system subracks. Internal microprocessor buses enforce firmware flash compatibility protocols during system initialization, maintaining low-latency data exchange across active CAN and Modbus communication loops without introducing process signal jitter.

System Shipment Package

  • 1 x ABB 3BHE016011R0002 UNS0118a-Z Control Module

  • 1 x Anti-static ESD protective shipping box

Cabinet Mounting and Wiring Recommendations

Cabinet Integration

  • Slide the module smoothly along subrack card guides to prevent pin deformation on backplane connectors.

  • Torquing front-panel locking fasteners to 0.6 Nm secures chassis grounding and prevents vibration dislodgements.

Power and Signal Wiring

  • Route the 24 VDC auxiliary power supply leads through dedicated, fused terminal blocks.

  • Separate CAN and Modbus communication cabling from high-voltage AC motor lines by a minimum of 200 mm.

  • Ground all overall cable shields to the local earth busbar via low-impedance grounding clamps.

Technical Support FAQs

  • What is the primary input voltage requirement for this control module?

    The unit operates on a nominal 24 VDC power supply with an acceptable input voltage tolerance of +/-20%.

  • Can this module be hot-swapped while the rack backplane is energized?

    No. Main system power must be disconnected before removing or inserting the unit to prevent electrical transients.

  • What fieldbus protocols are natively supported on the board communication interfaces?

    The hardware features integrated controller support for CAN bus and Modbus fieldbus protocol communications.

  • How is electrical noise immunity maintained on fieldbus signal cables?

    Shielded twisted-pair cables must be utilized, with shields grounded at the entry point of the control panel.

  • What is the typical thermal dissipation of the card during operation?

    The internal power dissipation of the unit remains at approximately 10 W under nominal operational loads.

  • Does the module require external forced-air cooling in standard cabinets?

    Standard passive convection cooling is sufficient if ambient temperatures remain between -20 and +60 deg C.

  • How are firmware mismatches handled upon system startup?

    Firmware flash compatibility checking ensures the module synchronizes with the controller configuration on boot.

  • What is the recommended storage temperature range for spare units?

    Spare modules must be stored within a dry environment maintained between -40 deg C and +85 deg C.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More