3BHE006422R0001 ABB UNS2861C-P,V1 Circuit Board UNITROL Excitation
3BHE006422R0001 ABB UNS2861C-P,V1 Circuit Board UNITROL Excitation
3BHE006422R0001 ABB UNS2861C-P,V1 Circuit Board UNITROL Excitation
ABB

3BHE006422R0001 ABB UNS2861C-P,V1 Circuit Board UNITROL Excitation

SKU: 3BHE006422R0001
Categories : ABB
In Stock
  • Dimensions: 29cm x 25.2cm x 3.5cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB 3BHE006422R0001, designated as the UNS2861C-P,V1, is a high-precision circuit board engineered for the UNITROL series of excitation and drive control systems. This module serves as an advanced interface and signal processing card, facilitating the critical exchange of data between the main control processor and the power electronic stages. Designed for high-availability environments, the UNS2861C-P,V1 provides the essential synchronization and feedback loops required to maintain generator voltage stability. Its high-integrity Swedish construction ensures that sensitive control logic remains isolated from the high-voltage noise typically found in industrial power conversion cubicles, making it an indispensable component for mission-critical automation infrastructure.

Hardware Parameters and Technical Metrics

  • Module Designation Excitation System Interface Board

  • Model Identifier UNS2861C-P,V1

  • Order Reference 3BHE006422R0001

  • System Compatibility UNITROL 5000 / 6000 Series

  • Ingress Protection IP20 (Dust resistant for cabinet mounting)

  • Diagnostics Integrated real-time monitoring and fault detection

  • Networking Compatible with system-wide Ethernet router architectures

  • Unit Mass 0.52kg

  • Physical Dimensions 29cm x 25.2cm x 3.5cm

  • Manufacturing Origin Sweden

  • Tariff Classification (HS) 8537101190

Industrial Deployment and Site Applications

The UNS2861C-P,V1 is predominantly utilized in the power generation and heavy drive sectors, where it acts as a gate unit interface or a high-speed signal extension card. In large-scale hydroelectric or thermal power facilities, this board monitors the field excitation variables, ensuring that synchronous generators respond instantaneously to grid load changes. Its 0.52kg modular design allows for rapid field replacement, significantly reducing Mean Time to Repair (MTTR) during scheduled maintenance or emergency outages. Built to endure the thermal cycling of continuous industrial operation, the 3BHE006422R0001 provides the reliability needed for energy-efficient motor control and large-scale utility grid stabilization, protecting the long-term health of the plant's primary rotating assets.

FAQ

Q: What is the primary role of the UNS2861C-P,V1 in a UNITROL excitation system?

A: The UNS2861C-P,V1 functions as a specialized communication and interface board, bridging the gap between low-voltage control signals and the high-power thyristor firing circuits within the excitation cabinet.

Q: Is the UNS2861C-P,V1 3BHE006422R0001 compatible with legacy UNITROL models?

A: This specific revision (V1) is engineered for modern UNITROL architectures. You should check your current system's hardware manual to ensure the card's firmware and physical connector layout are compatible with your specific rack version.

Q: How does the IP20 rating impact the installation of this circuit board?

A: The IP20 rating indicates that the board is protected against solid objects up to 12mm (like fingers) but is not waterproof. It must be installed within a NEMA or IP-rated industrial enclosure to protect it from moisture and conductive dust.

Q: Are there any specific cooling requirements for this module?

A: While the board is designed for energy efficiency, it relies on the internal convection or forced-air cooling of the main system cabinet. Maintaining clear airflow across the board surface is essential for long-term component reliability.

Q: Can I use the on-board diagnostic tools to troubleshoot field-side faults?

A: Yes. The UNS2861C-P,V1 provides feedback to the DCS, allowing operators to see if a communication loss or signal deviation originates from the board itself or from external field wiring.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Nextek Industrial Internet Platform Empowers SME Digital Transformation
Oct 22, 2026
Maxwell
Nextek Industrial Internet Platform Empowers SME Digital Transformation
The Nextek Industrial Internet Platform has emerged as a transformative force in China's manufacturing sector,...
Read More
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
Oct 22, 2026
Maxwell
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
The 26th China International Industry Fair (CIIF), scheduled for September 23-27, 2026, in Shanghai, promises...
Read More
China Industrial Robot Installations Reach Record 354000 Units in 2025
Oct 22, 2026
Maxwell
China Industrial Robot Installations Reach Record 354000 Units in 2025
China's dominance in the global industrial robotics market reached new heights in 2025, with the...
Read More
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More