3500/91-01-01-01 EGD Communication Gateway Module Bently Nevada
3500/91-01-01-01 EGD Communication Gateway Module Bently Nevada
3500/91-01-01-01 EGD Communication Gateway Module Bently Nevada
Bently Nevada

3500/91-01-01-01 EGD Communication Gateway Module Bently Nevada

SKU: 3500/91-01-01-01
Categories : All Products
In Stock
  • Dimensions: 241.3 mm x 24.4 mm x 241.8 mm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Bently Nevada 3500/91-01-01-01 acts as a high-speed bridge between the 3500 Machinery Protection System and external plant networks. This Communication Gateway Module is specifically designed to transmit critical machine health and vibration data using the Ethernet Global Data (EGD) protocol. By providing a secure, real-time data stream, the 3500/91-01-01-01 allows external controllers—such as GE Mark VI/VIe or distributed control systems (DCS)—to access status information, measured values, and alarm data directly from the rack backplane. This integration is vital for synchronized control and condition monitoring, ensuring that high-value rotating assets are managed within a unified plant-wide information architecture.

Hardware Parameters and Interface Specs

  • Primary Protocol Ethernet Global Data (EGD)

  • Ordering Code 3500/91-01-01-01

  • Data Transmission Real-time machinery protection and diagnostic values

  • Rack Integration Occupies one full-height slot (any slot except Power Supply)

  • Thermal Performance -40°C to +65°C (-40°F to +149°F)

  • Dimensions 241.3 mm x 24.4 mm x 241.8 mm (9.50 in x 0.96 in x 9.52 in)

  • Total Shipping Weight 2.0 kg (4.41 lbs)

  • Power Source Internally powered via the 3500 rack backplane

  • Industrial Rating Ruggedized for continuous operation in EMI-heavy environments

  • Origin United States (USA)

Industrial Connectivity Strategies

The 3500/91-01-01-01 is primarily deployed in large-scale power generation and oil and gas facilities where EGD is the preferred communication standard. It is essential for linking the 3500 vibration rack to GE control systems, allowing the turbine controller to "subscribe" to specific data packets produced by the monitor modules. This facilitates advanced coordination, such as automatic load shedding or controlled shutdowns based on precise vibration and position metrics. Beyond simple data transfer, the module enhances plant safety by ensuring that machinery protection data is available for remote viewing and historian logging without compromising the primary protection loop's integrity. Its secure communication architecture prevents unauthorized network traffic from interfering with the critical machinery protection functions of the rack.

FAQ

Q: Is the 3500/91-01-01-01 compatible with standard Modbus networks?

A: No, the 3500/91 is specifically designed for Ethernet Global Data (EGD). If your system requires Modbus TCP or RTU, you should look at the 3500/92 Communications Gateway instead.

Q: Where can I install this module within my 3500 rack?

A: The module can be placed in any of the standard monitor slots (1 through 15). It cannot be placed in the dedicated Power Supply slots or the PIM/TDI slots at the far left or right of the rack.

Q: Does this module require an external power supply?

A: No, the 172109-01 draws all necessary operational power directly from the 3500 rack backplane, simplifying the installation and reducing wiring complexity.

Q: Can this module be used for both machinery protection and condition monitoring?

A: Yes. It transfers both static data (like overall vibration levels and status bits) and can facilitate the movement of data needed for condition monitoring software, though its primary role is high-speed integration with control systems.

Q: What happens to the rack protection if the EGD connection is lost?

A: Machinery protection is maintained locally by the individual monitor modules in the rack. The 3500/91-01-01-01 is a communication gateway; if the network fails, the rack will still perform its autonomous trip functions based on its internal logic.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Sep 03, 2026
Shopify API
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Few engineering achievements capture the imagination quite like Shell Prelude. Moored approximately 475 kilometers off...
Read More
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
Sep 03, 2026
Shopify API
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
In the high-stakes world of offshore and onshore gas production, few projects carry the geopolitical...
Read More
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
Sep 03, 2026
Shopify API
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
The industrial automation landscape is shifting rapidly as manufacturers demand greater flexibility from their control...
Read More
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Sep 03, 2026
MaxWell
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Critical Manufacturing is preparing to demonstrate how manufacturers can use MES, industrial connectivity, manufacturing analytics and...
Read More
Automation Can Create a Hidden Single-Point-of-Failure Risk
Sep 03, 2026
MaxWell
Automation Can Create a Hidden Single-Point-of-Failure Risk
As factories become more automated, the biggest operational risk may not always be a failed...
Read More
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
Sep 02, 2026
MaxWell
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
The cybersecurity of water and wastewater infrastructure is drawing renewed attention across the industrial automation...
Read More
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Sep 02, 2026
MaxWell
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Manufacturers have spent years treating automation as a straightforward answer to labor shortages, rising costs...
Read More
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Sep 02, 2026
MaxWell
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Renesas Electronics has officially opened its Physical AI & Robotics Lab in Beijing, marking another significant...
Read More
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
Sep 01, 2026
MaxWell
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
OMRON Robotics is showcasing its latest mobile industrial automation advancements at Automate 2026 in Chicago,...
Read More