3300/12-01-20-00 Bently Nevada Power Supply Module 3300 Series
3300/12-01-20-00 Bently Nevada Power Supply Module 3300 Series
3300/12-01-20-00 Bently Nevada Power Supply Module 3300 Series
3300/12-01-20-00 Bently Nevada Power Supply Module 3300 Series
Bently Nevada

3300/12-01-20-00 Bently Nevada Power Supply Module 3300 Series

SKU: 3300/12
Categories : All Products
In Stock
  • Dimensions: 5 x 30.2 x 20.3 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Bently Nevada 3300/12-01-20-00, also cataloged as the 3300/12 power supply module, operates as a regulated DC conversion unit providing backplane excitation and control voltage distribution within the Bently Nevada 3300 monitoring rack architecture. The module converts 95/125 VAC input into a regulated 28 VDC output with a 5 A current capacity, supplying downstream monitoring and protection modules through rack-level distribution rails. Output regulation behavior is governed by internal switching and protection circuitry designed to maintain stable backplane voltage under variable load conditions.

Hardware Specifications

Parameter Specification
Model 3300/12-01-20-00
Brand Bently Nevada
Origin USA
Weight 1.28 kg
Shipping Dimensions 5 x 30.2 x 20.3 cm
Operating Temp Not explicitly defined in provided data
Power Consumption Depends on rack load (5 A output capacity)
Input Voltage 95 / 125 VAC
Input Frequency 50 / 60 Hz
Output Voltage 28 VDC
Output Current 5 A
Product Status Discontinued by manufacturer

Rack Power Distribution and Voltage Regulation Behavior

The module performs AC-to-DC conversion using internal switching regulation with output stabilization targeted at 28 VDC bus voltage. Backplane distribution is designed to maintain consistent supply rails across 3300 series monitoring modules. Load variation compensation is implemented through internal current regulation limiting, ensuring controlled response under transient rack insertion or module hot-swap conditions. Voltage stability is maintained within defined tolerance bands to support continuous signal conditioning operations.

Ordering info

  • 1 x 3300/12-01-20-00 power supply module

  • 1 x integrated rack power interface connector assembly

  • 1 x mounting and locking hardware set for 3300 series rack

  • 1 x terminal identification label set

Field Installation Guidelines

Power Input Connection

  • Connect only to 95–125 VAC rated supply source

  • Verify correct frequency selection (50 / 60 Hz)

Rack Integration

  • Install only into compatible Bently Nevada 3300 rack chassis

  • Ensure full backplane engagement before energizing system

Grounding Requirements

  • Maintain dedicated rack earth grounding path

  • Avoid shared ground loops with high noise equipment

Operational Checks

  • Verify 28 VDC output stability after startup

  • Confirm no overcurrent condition on 5 A rail

Frequently Structured Technical Queries

  • Is the module hot-swappable?
    Replacement should be performed with rack power isolated; backplane energization during insertion is not recommended.

  • What is the output voltage level?
    The module provides a regulated 28 VDC output to the rack backplane distribution system.

  • What input range is supported?
    It supports 95 to 125 VAC input at 50 / 60 Hz frequency.

  • What happens under overload conditions?
    Internal current limiting restricts output to 5 A maximum to protect downstream modules.

  • Can it operate in redundant configuration?
    Redundant rack setups require matched power supply modules and synchronized load sharing design.

  • Does it require external cooling?
    Cooling is achieved via rack airflow; no external cooling module is specified.

  • What is the role in the 3300 system?
    It provides centralized DC power conversion for all monitoring and protection modules in the rack.

  • Why is it discontinued?
    Product lifecycle status is manufacturer-defined; functional replacement depends on system revision compatibility.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
Aug 29, 2026
Maxwell PLC Ltd
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
At the ACG Caving Conference 2026 in Ulaanbaatar, mining technology developer Sandvik formally introduced xCell...
Read More
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Aug 29, 2026
Maxwell PLC Ltd
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Mining giant Vale has formalized a long-term strategic alliance with industrial engineering group ABB to...
Read More
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Aug 29, 2026
Maxwell PLC Ltd
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Tanzania officially brought East Africa's largest hydroelectric facility online following the inauguration of the 2,115...
Read More
Schneider Electric Backs Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric Backs Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore a...
Read More
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore an...
Read More
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Aug 29, 2026
MaxWell
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Schneider Electric is calling on industrial companies to take a more disciplined approach to digital...
Read More
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
Aug 28, 2026
MaxWell
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
System integrator Holland-Controls has initiated a critical automation system modernization project across an active offshore oil and...
Read More
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Aug 28, 2026
MaxWell
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Operational delays in heavy industrial facilities frequently stem from fragmented documentation rather than actual mechanical...
Read More
Baker Hughes Outlines Next-Generation Autonomous Well Construction Framework
Aug 27, 2026
MaxWell
Baker Hughes Outlines Next-Generation Autonomous Well Construction Framework
Energy services provider Baker Hughes is accelerating upstream digitalization by expanding its autonomous drilling architecture. Executive...
Read More
Emerson Enhances Guardian Digital Platform with Advanced Industrial AI Tools
Aug 27, 2026
MaxWell
Emerson Enhances Guardian Digital Platform with Advanced Industrial AI Tools
To streamline process operations, Emerson has integrated advanced enterprise artificial intelligence into its flagship Guardian digital platform....
Read More