2711P-RDB12C Allen-Bradley PanelView Plus Display Module
2711P-RDB12C Allen-Bradley PanelView Plus Display Module
Allen-Bradley

2711P-RDB12C Allen-Bradley PanelView Plus Display Module

SKU: 2711P-RDB12C
Categories : All Products
In Stock
  • Dimensions: 47 x 5.5 x 33 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-resolution visual interface execution in PanelView Plus 1250 platforms, the Allen-Bradley 2711P-RDB12C (2711PRDB12C Display Module) provides direct physical execution of graphical operator feedback and touch/keypad input processing.

Module Configuration and Display Architecture

The 2711P-RDB12C is a 12.1-inch color active-matrix thin-film transistor (TFT) liquid crystal display (LCD). It supports 800 x 600 pixel resolution with 18-bit color graphics, facilitating clear process status monitoring and operator interaction via the integrated touch and keypad interface.

Technical Hardware Specifications

Parameter Specification
Model 2711P-RDB12C
Brand Allen-Bradley
Origin USA
Weight 3.66 kg
Shipping Dimensions 47 x 5.5 x 33 cm
Operating Temp Industrial Standard Limits
Power Consumption Host Terminal Dependent
Display Size 12.1 inches
Resolution 800 x 600
Luminance 300 cd/m2
Interface Keypad / Touch

Deterministic Network and Firmware Compatibility

The display module is engineered for integration within EtherNet/IP and ControlNet deterministic networks when paired with PanelView Plus 1250 and PanelView Plus 6 1250 terminals. Firmware flash compatibility between the module and the host terminal’s operating system is required to maintain synchronization and I/O data alignment. Users should verify firmware revisions to ensure stable communication link behavior and high-speed graphical refresh rates.

Ordering Information

  • Allen-Bradley 2711P-RDB12C Display Module

  • Panel mounting fasteners and sealing gasket

  • Technical instruction manual

  • Note: This module is intended as a component-level replacement and does not include the terminal communication logic processor.

Field Installation Guidelines

  • De-energization: Ensure the host terminal is isolated from all power sources before proceeding with installation.

  • Enclosure Sealing: Secure the module using the provided fasteners to ensure that the gasket maintains the terminal's specified IP ingress protection rating.

  • Connector Seating: Carefully align the internal interface ribbon cable with the logic board connector to prevent pin damage or improper signal termination.

  • EMI Mitigation: Keep internal signal wiring separated from high-voltage AC paths to prevent electromagnetic interference.

Logistics and Handling

  • Delivery time: 2-7 days when payment finish.

  • Shipment via DHL, FEDEX, or UPS.

  • All units are protected by anti-static industrial packaging to prevent electrostatic discharge damage and ensure mechanical stability during transit.

Frequently Asked Questions

  1. How often should calibration be verified?

    Touchscreen calibration should be performed whenever input registration drifts from the visual coordinate grid, accessed via the terminal configuration menu.

  2. Can the module operate in hazardous environments?

    This HMI display module is rated for standard industrial control panels and is not certified for installation in hazardous (Ex) zones.

  3. What causes unstable display performance?

    Performance degradation is often attributed to firmware mismatches between the display module and the host logic terminal, or inadequate power supply stability.

  4. How is display health tested?

    Display health is monitored via the host terminal's built-in self-diagnostic routines during the system boot sequence.

  5. Is the module hot-swappable?

    No. Installation or replacement requires a full power-down cycle of the host HMI terminal to ensure electrical safety and hardware integrity.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More