2711-B6C10 Allen-Bradley Operator Interface PanelView 600 HMI
2711-B6C10 Allen-Bradley Operator Interface PanelView 600 HMI
2711-B6C10 Allen-Bradley Operator Interface PanelView 600 HMI
Allen-Bradley

2711-B6C10 Allen-Bradley Operator Interface PanelView 600 HMI

SKU: 2711-B6C10
Categories : All Products
In Stock
  • Dimensions: 27.9 x 20.3 x 12.7 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 2711-B6C10, also cataloged as the 2711B6C10 Operator Interface, operates as a dedicated hardware component for localized process visualization and command execution within Allen-Bradley controller networks. The terminal provides a 5-inch color display integrated with both touchscreen regions and physical function keys, facilitating data exchange via DeviceNet and RS-232 serial ports.

Hardware Configuration Matrix

The 2711-B6C10 designation signifies the following configuration:

  • Display: 5-inch color active-matrix/passive LCD.

  • Input: Combined touchscreen and physical keypad.

  • Communications: DeviceNet network interface and RS-232 printer port.

  • Power: AC input configuration.

Hardware Specifications

Parameter Specification
Model 2711-B6C10
Brand Allen-Bradley
Origin USA
Weight 2.3 kg
Shipping Dimensions 27.9 cm x 20.3 cm x 12.7 cm
Operating Temp 0 deg C to 55 deg C
Power Consumption 100-240 VAC, 50/60 Hz

Deterministic Network Compatibility

This interface terminal utilizes DeviceNet protocols to maintain communication determinism within PLC-based control architectures. Firmware flash compatibility is restricted to specific PanelBuilder32 software versions; users must verify version alignment before attempting project file uploads. Effective I/O density scaling relies on correct configuration of the DeviceNet node address and baud rate settings to ensure synchronization with the master scanner. Improper termination or shielded cabling practices on the DeviceNet trunk can induce signal reflection, significantly impacting the packet delivery latency required for time-sensitive visualization updates.

Ordering Info

  • 2711-B6C10 Operator Interface unit

  • Installation mounting clips

  • IP65/NEMA 4X rated panel gasket

  • AC power connector

Installation Guidelines

  • Panel Cutout: Prepare the cabinet panel based on precise dimensions to ensure the integrity of the gasket seal for NEMA 4X compliance.

  • Chassis Grounding: Connect the unit chassis to the cabinet equipment ground using a low-impedance copper strap to mitigate high-frequency electrical noise.

  • Clearance: Ensure a minimum of 50 mm clearance around the display and rear components to facilitate ambient air circulation and prevent thermal overheating.

  • Cabling: Segregate DeviceNet and serial cabling from high-voltage AC lines to maintain signal path isolation and reduce induced noise.

Shipping Information

  • Delivery time: 3-5 days when payment finish.

  • Dispatched via DHL/FEDEX/UPS.

  • Components are sealed in anti-static industrial packaging, utilizing reinforced boxing to prevent electrostatic discharge and mechanical impact during global transit.

Frequently Asked Questions

  • What display technology is implemented? The terminal features a 5-inch color LCD display. It is designed to provide high-contrast color visualization of process tags, alarm states, and operational data within standard industrial control cabinet environments.

  • Can project files be converted from newer platforms? Projects developed in legacy PanelBuilder32 software cannot be directly migrated to FactoryTalk View environments. Manual reconstruction of graphic objects and tag databases is necessary when upgrading terminal generations.

  • What is the DeviceNet node limitation? The terminal occupies a single node address on the DeviceNet network. Address conflicts or incorrect baud rate matching will prevent the device from establishing a connection with the network scanner.

  • How is the screen calibration managed? The system includes a built-in touch calibration utility accessible via the configuration mode. This should be utilized if the touch registration becomes offset from the visual graphic icons due to mechanical vibration or material aging.

  • What is the function of the RS-232 port? The RS-232 port is configured primarily for printer output or for downloading project files from a workstation using a standard serial interface cable.

  • Does the device support firmware upgrades? Firmware upgrades are only possible through specific software utilities provided for the 2711 series. Users must ensure that the hardware version supports the intended firmware release to avoid terminal bricking.

  • How is the internal real-time clock maintained? The internal clock and non-volatile configuration memory are maintained by an internal lithium battery. This battery must be replaced periodically to prevent the loss of time-stamping data and configuration parameters during power cycles.

  • Can the keypad be disabled? The interface utilizes both keypad and touchscreen inputs. Disabling specific input methods is performed through software configuration within the project file, which determines whether the logic accepts or ignores inputs from the physical keys.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Nov 20, 2026
Maxwell
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Torus Energy Storage has been named Battery Manufacturer of the Year at the 2026 Battery...
Read More
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More