1MRB178009R0002 500PBIO01-TTL ABB Control Board RTU500
ABB

1MRB178009R0002 500PBIO01-TTL ABB Control Board RTU500

SKU: 1MRB178009R0002
Categories : ABB
In Stock
  • Dimensions: 27.1 x 12 x 2.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 1MRB178009R0002, also cataloged as the 500PBIO01-TTL Control board, operates as a dedicated hardware component for peripheral I/O bus management within RTU500 Series platforms. The module provides direct electrical interface execution, coordinating data transfer across high-density transistor-transistor logic (TTL) expansion blocks and mapping local signals to the centralized processor module.

Technical Parameters

Parameter Specification
Model 1MRB178009R0002 500PBIO01-TTL
Brand ABB
Origin Sweden
Weight 0.32 kg
Shipping Dimensions 27.1 x 12 x 2.2 cm
Operating Temp -25 to +60 deg C
Humidity Less than or equal to 95% non-condensing
Power Supply 24 VDC
Power Consumption Less than 3 W
Module Capacity Supports up to 64 modules
Tariff Code 8537101190

Deterministic Subsystem Configuration

Designed for integration into synchronized electrical substation environments, this assembly addresses up to 64 sub-modules on a single logic cluster. The unit requires strict adherence to firmware flash compatibility profiles to maintain proper registration across the remote terminal architecture. Data transitions are clocked through backplane bus communication velocity channels, guaranteeing stable scan intervals across all connected nodes. This high-capacity architecture provides flexible I/O density scaling options, isolating internal processing registers from propagation delays caused by expanded peripheral network topologies.

Logistics Packaging Checklist

  • 1 x ABB 1MRB178009R0002 500PBIO01-TTL Control Board

  • 1 x Factory ESD Test Verification Certificate

On-Site Deployment Protocol

  • Static Discharge Containment: Field engineers must maintain connection to a verified earth grounding point using a standard ESD wrist strap before handling the circuit board assembly. Do not touch bare trace corridors or IC pins.

  • Slot Configuration Limits: Verify that the subrack alignment pins match the receiving backplane slot before applying physical pressure. Ensure the lock levers engage fully to establish clean low-resistance contact with the 24 VDC power bus rails.

  • TTL Conductor Routings: All low-voltage TTL connection lines must be kept short and segregated from high-power alternating current paths to avoid inductive noise injection into the peripheral bus.

Dispatch and Shipping Criteria

  • Fulfillment Turnaround: Shipments are processed and scheduled for dispatch within 3-5 days when payment finish protocols conclude.

  • Transit Vehicle: Consignments are forwarded worldwide via express freight providers (DHL, FEDEX, or UPS).

  • Defensive Cushioning: Every card is enclosed in heavy-duty anti-static industrial packaging and padded with dense, non-conductive shock isolation foam to resist mechanical impacts during long-distance handling.

Technical Engineering FAQ

Q: Is this control board engineered to support hot-swapping routines under live bus loads?

A: No. The board features standard non-staggered edge pin connections. Removing or inserting the module while the 24 VDC backplane bus is energized will generate voltage transients that can corrupt logic registers on the host processor and disrupt communication to adjacent expansion modules.

Q: What are the functional outcomes of a firmware flash compatibility variance on this unit?

A: A firmware version mismatch prevents the controller from scanning the peripheral rack. The module status indicator will switch to a permanent error code, and the device will fail to discover or map any of the maximum 64 supported expansion blocks.

Q: How is the low power consumption profile maintained under full expansion loads?

A: The board utilizes localized low-power logic gates that require less than 3 W for independent operations. Power distribution to downstream TTL components is handled through dedicated expansion rails, keeping the thermal profile of the primary control board stable across the entire -25 to +60 deg C operational window.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More