1734-4IOL Allen-Bradley Point I/O Point IO-Link Master Module
Allen-Bradley

1734-4IOL Allen-Bradley Point I/O Point IO-Link Master Module

SKU: 1734-4IOL
Categories : All Products
In Stock
  • Dimensions: 8.5 cm x 7 cm x 7 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for distributed sensor communication and data multiplexing within industrial automation networks, the Allen-Bradley 1734-4IOL (1734-4IOL Point IO-Link Master Module) provides direct physical/electrical execution.

Nomenclature & Architectural Breakdown

  • Product Base: 1734
  • Module Family: Point I/O
  • Functional Variant: IO-Link Master
  • Channel Density: 4-Channel Configuration
  • Operational Voltage: 24 V DC

Hardware Specifications

Parameter Specification
Model 1734-4IOL
Brand Allen-Bradley
Origin USA
Weight 0.14 kg
Shipping Dimensions 8.5 cm x 7 cm x 7 cm
Operating Temp Not specified
Power Consumption Not specified
Core Function Distributed I/O IO-Link Master

Deterministic Network & Backplane Integration

Integrated across Profinet and EtherNet/IP deterministic networks, this communication module sustains backplane bus communication velocity and I/O density scaling. The internal processing architecture manages protocol conversion latencies and supports firmware flash compatibility, ensuring synchronized data exchange between smart field devices and the central controller without introducing communication jitter or packet loss across distributed network nodes.

Package Contents & Ordering Details

  • 1 x 1734-4IOL Point IO-Link Master Module unit
  • 1 x Removable terminal block base connector
  • 1 x Technical installation instruction sheet

Physical Installation Guidelines

  • Enclosure Clearance: Maintain adequate vertical and horizontal spacing around the module housing to allow for proper thermal dissipation and ambient airflow.
  • DIN-Rail Mounting: Securely mount the unit onto a standard 35 mm industrial DIN rail, verifying that the locking mechanism engages completely.
  • Wiring Termination: Connect incoming 24 V DC power supplies and IO-Link field device cables to the designated terminal points, ensuring secure mechanical clamping.
  • Grounding Compliance: Fasten the base assembly directly to a grounded metal panel to mitigate electromagnetic interference and ensure noise immunity.

Frequently Asked Questions

  • What are the recommended practices for physical mounting and enclosure clearance?
  • The module must be installed within a protective industrial enclosure mounted securely onto a standard DIN rail, ensuring sufficient top and bottom clearance to maintain adequate convective airflow.
  • How should cable shielding and grounding be executed for IO-Link communication ports?
  • Cable shields must be terminated directly to a low-impedance ground bus bar using proper metal clamping brackets to prevent high-frequency electromagnetic interference from corrupting data packets.
  • What are the strict wiring segregation and routing limitations in the control cabinet?
  • Low-voltage digital and communication cables must be segregated physically from high-voltage power lines and motor drive cables within separate metal conduits or cable trays to minimize electrical noise coupling.
  • What standard industrial practices apply to wire stripping and terminal insertion?
  • Conductors must be stripped to the exact length specified by the manufacturer without exposing bare copper outside the terminal, and stranded wires must be fully inserted to avoid stray strands causing short circuits.
  • Are there specific torque limits when securing terminal block connections?
  • Screws on terminal blocks must be tightened using calibrated tools to avoid under-tightening that causes high contact resistance or over-tightening that shears screw threads.
  • How should power distribution lines be protected against transient voltage surges?
  • Industrial control panels must incorporate appropriate surge suppression devices and fuses on incoming power branches to protect sensitive electronics from grid transients and lightning-induced spikes.
  • What environmental conditions must be avoided during field installation?
  • Installation locations must be free from excessive moisture, corrosive gases, severe continuous vibration, and ambient temperatures exceeding the designated hardware specifications.
  • How is proper continuity verified across the common grounding system?
  • System integrators must verify that all panel backplanes, DIN rails, and shielding bars exhibit low-resistance metallic bonding back to the main earth ground stud of the facility.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
Sep 15, 2026
MaxWell
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
The U.S. Energy Information Administration forecasts that the United States will add a record 86...
Read More
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
Sep 15, 2026
MaxWell
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
WindEurope expects Europe to install 151 gigawatts of new wind power capacity over the 2026-2030...
Read More
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
Sep 15, 2026
Shopify API
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
India has achieved a significant renewable energy milestone, reaching 150 gigawatts of installed solar capacity...
Read More
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Sep 14, 2026
Shopify API
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Masdar and ScottishPower Renewables have announced significant progress on the East Anglia Three offshore wind...
Read More
China Develops World's Largest 50MW Floating Wind Turbine Prototype
Sep 14, 2026
Shopify API
China Develops World's Largest 50MW Floating Wind Turbine Prototype
China is developing what is planned to become the world's largest floating wind turbine with...
Read More
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
Sep 13, 2026
MaxWell
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
The oil and gas industry is accelerating adoption of predictive maintenance strategies, with over 60%...
Read More
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Sep 13, 2026
MaxWell
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Industrial automation companies reported mixed financial results for the second quarter of 2026, reflecting varying...
Read More
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Sep 13, 2026
MaxWell
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Power Construction Corporation of China is advancing a portfolio of wind power projects totaling more...
Read More
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Sep 12, 2026
MaxWell
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Siemens' industrial artificial intelligence strategy has evolved from concept demonstration to production deployment, marking a...
Read More