0338434M DLM02 ABB Link Module Freelance DCS Connectivity Unit
0338434M DLM02 ABB Link Module Freelance DCS Connectivity Unit
0338434M DLM02 ABB Link Module Freelance DCS Connectivity Unit
ABB

0338434M DLM02 ABB Link Module Freelance DCS Connectivity Unit

SKU: 0338434M
Categories : ABB
In Stock
  • Dimensions: 31.1 x 2.7 x 48.3 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen

Request a quote

1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB DLM02, identified by the order reference 0338434M, is a specialized network link module engineered for the Freelance Distributed Control System (DCS) architecture. This unit acts as a high-capacity bridge within the Freelance 2000 environment, facilitating the high-speed transfer of process data between controllers and remote I/O stations. Designed to provide deterministic communication, the DLM02 ensures that control signals are prioritized across the automation backbone, reducing latency and preventing data collisions. Its robust design is specifically tailored for rack-mounted configurations where consistent uptime and high-throughput connectivity are vital for plant-wide coordination.

Hardware Specifications and Physical Profile

Technical Parameter Detail
Model Designation DLM02
Part Number 0338434M
Product Series Freelance Distributed Control System
Component Mass 3.5 kg
Form Factor Dimensions 31.1 x 2.7 x 48.3 cm
Communication Infrastructure Ethernet Router / System Bus Integration
Manufacturing Origin Sweden
Tariff Classification HS 8537101190
Lifecycle Support Active
  • Construction: High-durability industrial chassis designed for vertical rack mounting.

  • Network Integrity: Features advanced signal conditioning to maintain data packet validity across long-distance bus runs.

  • Scalability: Optimized for easy system expansion, allowing for the integration of additional Freelance controller nodes.

  • Reliability: Built-in hardware watchdog and diagnostic monitoring to ensure the continuous health of the communication link.

Industrial Connectivity Applications

The DLM02 0338434M is an essential interface component for large-scale industrial operations utilizing the Freelance DCS platform. Primary implementation scenarios include:

  • Process Industry Synchronization: Bridging localized control loops into a unified plant management network in chemical and pharmaceutical facilities.

  • Energy Management Systems: Coordinating data flow between remote power monitoring stations and central control hubs in utility plants.

  • Manufacturing Expansion: Providing the necessary link infrastructure for scaling production lines without replacing existing Freelance 2000 hardware.

  • Decentralized Automation: Enabling reliable communication for geographically dispersed I/O clusters in water treatment and distribution utilities.

FAQ

Q: What is the specific purpose of the DLM02 in a Freelance system?

A: The DLM02 serves as a link module that connects different segments of the Freelance system bus, ensuring that process data flows seamlessly between controllers and human-machine interfaces.

Q: Is the 0338434M compatible with legacy Freelance 2000 installations?

A: Yes, the DLM02 is a core component of the Freelance 2000 range and is designed to maintain compatibility with existing racks and bus architectures within that series.

Q: How does the module handle communication errors or signal noise?

A: The module utilizes robust industrial-grade error-checking protocols and internal hardware shielding to mitigate the effects of electromagnetic interference and ensure high-integrity data transmission.

Q: Does this link module require special software configuration?

A: Initial setup is typically managed through the Freelance Engineering software (such as Control Builder F), where the link module is defined within the system topology to enable proper routing.

Q: Can the DLM02 be used in high-vibration environments?

A: With its sturdy Swedish construction and a weight of 3.5 kg, the module is engineered to withstand the mechanical stresses typical of heavy industrial control rooms and cabinet installations.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Jun 05, 2026
MaxWell
ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Industrial technology leaderABBRobotics has signed a memorandum of understanding with Mettler Toledo to bridge collaborative...
Read More
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Jun 05, 2026
MaxWell
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Global engineering technology leaderEmersonhas introduced its PACSystems IPC 2010, a compact and rugged industrial computer...
Read More
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Jun 05, 2026
MaxWell
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Industrial robotics manufacturer KUKA has formed a strategic partnership with Micropsi Industries to offer the...
Read More
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Jun 05, 2026
MaxWell
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Industrial automation instrumentation manufacturer Banner Engineering has released its DXM1200-B2 and DXM1200-X2 wireless controller series,...
Read More
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Jun 05, 2026
MaxWell
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Global automation components manufacturer Idec has expanded its SmartAXIS Touch hardware family with the introduction...
Read More
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Jun 05, 2026
MaxWell
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Industrial automation leaderRockwell Automationhas expanded its visualization hardware portfolio with the launch of the ASEM...
Read More
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Jun 04, 2026
MaxWell
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Industrial automation giantFanuchas officially opened a new 650,000-square-foot West Campus facility in Auburn Hills, Michigan,...
Read More
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
Jun 04, 2026
MaxWell
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
To minimize panel footprints and accelerate deployment timelines for machine builders,Rockwell Automationhas expanded its ruggedized...
Read More
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Jun 04, 2026
MaxWell
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Global energy management and automation specialistSchneider Electrichas unveiled an expansive suite of industrial technology designed...
Read More
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Jun 04, 2026
MaxWell
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Schneider Electric presented a comprehensive showcase of its next-generation smart manufacturing portfolio, demonstrating how a...
Read More