TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit
TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit
TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit
ABB

TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit

SKU: 3KDE175111L9210
Categories : ABB
In Stock
  • Dimensions: 49.8 x 27.3 x 6.8 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for redundant I/O termination and communication routing in the Advant S900 I/O system, the ABB TU921S 3KDE175111L9210 (TU921S Redundant Termination Unit) provides physical termination for up to 16 I/O modules with redundancy and hot configuration functions.

Model Identification

The TU921S is identified by the following ordering references:

  • Base Model: TU921S
  • Full Part Number: 3KDE175111L9210
  • Product Type: Redundant Termination Unit
  • System: ABB Advant S900 I/O
  • Supported I/O Capacity: Up to 16 I/O modules
  • Spare Model: 3KDE175111L9210

Hardware Specifications

Parameter Specification
Model TU921S
Part Number 3KDE175111L9210
Brand ABB
Series Advant S900 I/O
Product Type Redundant Termination Unit
Termination Capacity Up to 16 I/O modules
Redundancy Power and communication redundancy
Configuration Hot configuration in run
Hot Swap Supported
Diagnostics Extended diagnostics and auto-diagnostics
Configuration Interface FDT/DTM support
Coating G3 coating for all components
ATEX Certification Suitable for installation in Zone 1
Origin Sweden
Weight 2.96 kg
Shipping Dimensions 49.8 x 27.3 x 6.8 cm
Operating Temp Not specified in supplied data
Power Consumption Not specified in supplied data
Tariff Code 8537101190
Manufacturer ABB

Industrial Control and I/O Architecture

The TU921S is designed for ABB Advant S900 I/O installations where redundant power and communication paths are required. Its termination architecture supports connection of up to 16 I/O modules and allows configuration changes while the system remains in operation.

  • Redundant power and communication paths support system-level availability requirements.
  • Hot configuration in run permits configuration activities without a complete system shutdown.
  • Hot swap functionality supports module replacement procedures where the overall system architecture permits live maintenance.
  • FDT/DTM integration provides a standardized method for configuration and diagnostic access.
  • Extended diagnostics and auto-diagnostics assist with identification of termination and communication-related conditions.
  • G3 coating is specified for all components.
  • ATEX certification supports installation requirements for Zone 1 environments when the complete installation complies with the applicable certification and system conditions.
  • The termination unit provides the physical interface for up to 16 I/O modules.

Ordering Information

  • 1 x ABB TU921S Redundant Termination Unit
  • Part Number: 3KDE175111L9210
  • Spare Model: 3KDE175111L9210
  • I/O modules are not included unless separately specified.
  • Additional mounting or system accessories are not identified in the supplied product data.

Field Installation Guidelines

Mounting and Mechanical Installation

  • Install the termination unit according to the Advant S900 system installation documentation.
  • Verify mechanical alignment before connecting I/O modules or field wiring.
  • Ensure the mounting structure supports the 2.96 kg unit and connected wiring.
  • Maintain adequate clearance for module removal and hot-swap maintenance procedures.

Wiring and Signal Routing

  • Route power, communication, and field signal wiring according to the system installation requirements.
  • Keep communication wiring separated from high-energy power conductors where practical.
  • Use appropriate cable shielding and connect shields according to the plant grounding concept.
  • Avoid excessive cable bending or mechanical stress at termination points.
  • Confirm all terminal assignments before energizing the system.

Redundant Configuration

  • Verify both redundant power and communication paths before placing the system into service.
  • Check diagnostic indications after installation and following any module replacement.
  • Confirm that redundancy is maintained after wiring modifications or hot-swap procedures.
  • Perform functional checks using the applicable Advant S900 engineering and diagnostic tools.

Frequently Asked Questions

  • Can the TU921S support redundant power?

    Yes. The supplied data specifies power redundancy as a supported function. The complete system configuration must provide the corresponding redundant power architecture.

  • Does the TU921S support redundant communication?

    Yes. Communication redundancy is specified for the TU921S. The actual redundancy behavior depends on the connected S900 I/O system configuration.

  • How many I/O modules can the TU921S terminate?

    The TU921S is specified as a termination unit for up to 16 I/O modules. The supported module combinations must follow the applicable S900 system configuration rules.

  • Can the TU921S be configured while running?

    Yes. The product information specifies hot configuration in run, allowing supported configuration activities without stopping normal system operation.

  • Does the TU921S support hot swapping?

    Yes. Hot swap functionality is specified. Live replacement must follow the applicable S900 installation and maintenance procedures.

  • What diagnostic functions are available?

    The unit provides extended diagnostics and auto-diagnostics. FDT/DTM support is also specified for configuration and diagnostic access.

  • Is the TU921S suitable for Zone 1 installation?

    The supplied data specifies ATEX certification for installation in Zone 1. Certification conditions must be verified against the complete installation before use.

  • What environmental coating is specified?

    G3 coating is specified for all components. This coating designation should be considered together with the actual installation environment and applicable system documentation.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More