TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit
TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit
TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit
ABB

TU921S 3KDE175111L9210 ABB Advant S900 I/O Series Redundant Termination Unit

SKU: 3KDE175111L9210
Categories : ABB
In Stock
  • Dimensions: 49.8 x 27.3 x 6.8 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for redundant I/O termination and communication routing in the Advant S900 I/O system, the ABB TU921S 3KDE175111L9210 (TU921S Redundant Termination Unit) provides physical termination for up to 16 I/O modules with redundancy and hot configuration functions.

Model Identification

The TU921S is identified by the following ordering references:

  • Base Model: TU921S
  • Full Part Number: 3KDE175111L9210
  • Product Type: Redundant Termination Unit
  • System: ABB Advant S900 I/O
  • Supported I/O Capacity: Up to 16 I/O modules
  • Spare Model: 3KDE175111L9210

Hardware Specifications

Parameter Specification
Model TU921S
Part Number 3KDE175111L9210
Brand ABB
Series Advant S900 I/O
Product Type Redundant Termination Unit
Termination Capacity Up to 16 I/O modules
Redundancy Power and communication redundancy
Configuration Hot configuration in run
Hot Swap Supported
Diagnostics Extended diagnostics and auto-diagnostics
Configuration Interface FDT/DTM support
Coating G3 coating for all components
ATEX Certification Suitable for installation in Zone 1
Origin Sweden
Weight 2.96 kg
Shipping Dimensions 49.8 x 27.3 x 6.8 cm
Operating Temp Not specified in supplied data
Power Consumption Not specified in supplied data
Tariff Code 8537101190
Manufacturer ABB

Industrial Control and I/O Architecture

The TU921S is designed for ABB Advant S900 I/O installations where redundant power and communication paths are required. Its termination architecture supports connection of up to 16 I/O modules and allows configuration changes while the system remains in operation.

  • Redundant power and communication paths support system-level availability requirements.
  • Hot configuration in run permits configuration activities without a complete system shutdown.
  • Hot swap functionality supports module replacement procedures where the overall system architecture permits live maintenance.
  • FDT/DTM integration provides a standardized method for configuration and diagnostic access.
  • Extended diagnostics and auto-diagnostics assist with identification of termination and communication-related conditions.
  • G3 coating is specified for all components.
  • ATEX certification supports installation requirements for Zone 1 environments when the complete installation complies with the applicable certification and system conditions.
  • The termination unit provides the physical interface for up to 16 I/O modules.

Ordering Information

  • 1 x ABB TU921S Redundant Termination Unit
  • Part Number: 3KDE175111L9210
  • Spare Model: 3KDE175111L9210
  • I/O modules are not included unless separately specified.
  • Additional mounting or system accessories are not identified in the supplied product data.

Field Installation Guidelines

Mounting and Mechanical Installation

  • Install the termination unit according to the Advant S900 system installation documentation.
  • Verify mechanical alignment before connecting I/O modules or field wiring.
  • Ensure the mounting structure supports the 2.96 kg unit and connected wiring.
  • Maintain adequate clearance for module removal and hot-swap maintenance procedures.

Wiring and Signal Routing

  • Route power, communication, and field signal wiring according to the system installation requirements.
  • Keep communication wiring separated from high-energy power conductors where practical.
  • Use appropriate cable shielding and connect shields according to the plant grounding concept.
  • Avoid excessive cable bending or mechanical stress at termination points.
  • Confirm all terminal assignments before energizing the system.

Redundant Configuration

  • Verify both redundant power and communication paths before placing the system into service.
  • Check diagnostic indications after installation and following any module replacement.
  • Confirm that redundancy is maintained after wiring modifications or hot-swap procedures.
  • Perform functional checks using the applicable Advant S900 engineering and diagnostic tools.

Frequently Asked Questions

  • Can the TU921S support redundant power?

    Yes. The supplied data specifies power redundancy as a supported function. The complete system configuration must provide the corresponding redundant power architecture.

  • Does the TU921S support redundant communication?

    Yes. Communication redundancy is specified for the TU921S. The actual redundancy behavior depends on the connected S900 I/O system configuration.

  • How many I/O modules can the TU921S terminate?

    The TU921S is specified as a termination unit for up to 16 I/O modules. The supported module combinations must follow the applicable S900 system configuration rules.

  • Can the TU921S be configured while running?

    Yes. The product information specifies hot configuration in run, allowing supported configuration activities without stopping normal system operation.

  • Does the TU921S support hot swapping?

    Yes. Hot swap functionality is specified. Live replacement must follow the applicable S900 installation and maintenance procedures.

  • What diagnostic functions are available?

    The unit provides extended diagnostics and auto-diagnostics. FDT/DTM support is also specified for configuration and diagnostic access.

  • Is the TU921S suitable for Zone 1 installation?

    The supplied data specifies ATEX certification for installation in Zone 1. Certification conditions must be verified against the complete installation before use.

  • What environmental coating is specified?

    G3 coating is specified for all components. This coating designation should be considered together with the actual installation environment and applicable system documentation.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Sep 14, 2026
Shopify API
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Masdar and ScottishPower Renewables have announced significant progress on the East Anglia Three offshore wind...
Read More
China Develops World's Largest 50MW Floating Wind Turbine Prototype
Sep 14, 2026
Shopify API
China Develops World's Largest 50MW Floating Wind Turbine Prototype
China is developing what is planned to become the world's largest floating wind turbine with...
Read More
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
Sep 13, 2026
MaxWell
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
The oil and gas industry is accelerating adoption of predictive maintenance strategies, with over 60%...
Read More
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Sep 13, 2026
MaxWell
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Industrial automation companies reported mixed financial results for the second quarter of 2026, reflecting varying...
Read More
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Sep 13, 2026
MaxWell
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Power Construction Corporation of China is advancing a portfolio of wind power projects totaling more...
Read More
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Sep 12, 2026
MaxWell
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Siemens' industrial artificial intelligence strategy has evolved from concept demonstration to production deployment, marking a...
Read More
ABB Rotork Acquisition Analysis: Strategic Expansion in Flow Control
Sep 12, 2026
MaxWell
ABB Rotork Acquisition Analysis: Strategic Expansion in Flow Control
ABB's landmark $5.5 billion acquisition of Rotork represents a decisive move to strengthen its position...
Read More
Global Renewable Energy Trends 2026: IRENA Statistical Insights
Sep 11, 2026
MaxWell
Global Renewable Energy Trends 2026: IRENA Statistical Insights
The International Renewable Energy Agency's 2026 statistical report reveals accelerating momentum in global renewable energy...
Read More
ABB IP66/Type 4X Drives: Rugged Motor Control Solutions for Harsh Industrial Environments
Sep 11, 2026
MaxWell
ABB IP66/Type 4X Drives: Rugged Motor Control Solutions for Harsh Industrial Environments
ABB has expanded its motor control portfolio with the introduction of ACS580, ACH580, and ACQ580...
Read More