TB811 3BSE008568R1 ABB Optical ModuleBus Port AC800M
ABB

TB811 3BSE008568R1 ABB Optical ModuleBus Port AC800M

SKU: TB811 3BSE008568R1
Categories : ABB
In Stock
  • Dimensions: 2 x 5.2 x 4.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for optical signal conversion and communication extension in industrial automation platforms, the ABB TB811 3BSE008568R1 (TB811 Optical ModuleBus Port) provides direct physical/electrical execution.

Model Matrix and Designation Details

  • Base model designation: TB811 indicating the optical ModuleBus adaptor hardware.
  • Part number identifier: 3BSE008568R1 specifying the exact manufacturing version.
  • System integration: Designed for deployment alongside CI810 and CI820 communication interfaces.
  • Compliance standard: G2 compliant construction for harsh industrial environments.

Hardware Specifications

Parameter Specification
Model TB811 3BSE008568R1
Brand ABB
Origin SWEDEN
Weight 0.2 kg
Shipping Dimensions 2 x 5.2 x 4.2 cm
Operating Temp -40 deg C to +70 deg C
Power Consumption <= 2 W
Electrical Interface RS-485 half-duplex
Optical Budget 12 dB
Isolation 2.5 kV AC
Supply Voltage 24 V DC (18 - 30 V)
Current Draw <= 85 mA @ 24 V

Backplane Communication and Network Parameters

  • Manages backplane bus communication velocity and protocol translation between electrical and optical layers.
  • Performs continuous autodiagnostics and supervises Modulebus integrity during system initialization and runtime.
  • Executes electrical ID verification routines at start-up to prevent mismatched module integration.
  • Enforces defined output states in response to communication anomalies, preserving field device safety parameters.

Ordering Information

  • 1 x TB811 Optical ModuleBus Port module
  • 1 x Technical documentation sheet

Field Installation and Wiring Guidelines

  • Mount the module securely onto a standard DIN rail within the designated enclosure.
  • Connect the 24 V DC power supply maintaining input voltage within the 18 V to 30 V range.
  • Ensure optical fiber ends are cleaned and inspected prior to insertion into the optical transceiver ports.
  • Route communication cables away from high-voltage power lines to mitigate electromagnetic interference.

Frequently Asked Questions

  • Q: What is the primary function of the TB811 module in an automation network?

    A: It converts electrical RS-485 signals to optical signals for extended ModuleBus transmission.

  • Q: How does the system handle an incorrect electrical ID at start-up?

    A: The module is prevented from taking into operation to avoid system configuration errors.

  • Q: What is the maximum optical budget supported by the optical interface?

    A: The optical budget is rated at 12 dB.

  • Q: What power supply voltage range is required for operation?

    A: The unit operates on a supply voltage of 24 V DC within an 18 V to 30 V range.

  • Q: How are communication faults managed during runtime?

    A: Continuous autodiagnostics supervise the Modulebus and trigger defined output states if a fault occurs.

  • Q: Is hot-swapping supported for this module?

    A: Power should be removed prior to insertion or extraction to protect backplane circuitry.

  • Q: What is the maximum current draw of the device at nominal voltage?

    A: The current draw is 85 mA or less at 24 V DC.

  • Q: What isolation rating protects the electrical interface?

    A: The unit provides 2.5 kV AC isolation between interface circuits.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

TB811 3BSE008568R1 ABB Optical ModuleBus Port AC800M

You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More