NKCL01-10 ABB Bailey Infi 90 Coaxial Cable
NKCL01-10 ABB Bailey Infi 90 Coaxial Cable
ABB

NKCL01-10 ABB Bailey Infi 90 Coaxial Cable

SKU: NKCL01-10
Categories : ABB
In Stock
  • Dimensions: 2.5 x 2.5 x 2.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB NKCL01-10, also cataloged as the NKCL01 Coaxial Cable, operates as a dedicated hardware component for high-speed plant signal transmission and node interconnectivity within Bailey Infi 90 RIO/Infi-Net communications. This 10 ft coaxial cable maintains steady 75 ohm line impedance across remote I/O links, preventing waveform reflection and high-frequency data corruption during continuous node-to-node telemetry exchanges.

Cable Assembly Variants & Dimensional Breakdown

  • NKCL01: Base factory designator for Infi 90 network coaxial communication cables.
  • -10: Physical length specifier designating a 10 foot (3.05 m) pre-terminated cable assembly.
  • Inner Conductor: 20 AWG solid core conductor providing low-resistance RF signal propagation.

Technical & Environmental Specifications

Parameter Specification
Model NKCL01-10
Brand ABB
Origin SWEDEN
Weight 0.7 kg
Shipping Dimensions 2.5 x 2.5 x 2.5 cm
Operating Temp -20 deg C to +80 deg C
Power Consumption Passive cable (0 W)
Conductor Gauge 20 AWG
Characteristic Impedance 75 ohm
Voltage Rating 500 V AC
Velocity of Propagation 80%
Storage Temperature -40 deg C to +85 deg C
Relative Humidity 5-95% RH (non-condensing)
Tariff Code 8537101190

Deterministic Network Telemetry & Flash Integrity

The NKCL01-10 cable assembly stabilizes backplane bus communication velocity and high-speed RIO network throughput by maintaining an 80% velocity of propagation. The 75 ohm matched impedance structure suppresses standing waves across Infi-Net communication loops, ensuring zero-loss packet transfer between distributed processing units. This physical layer stability prevents communication timeout resets, protecting firmware flash compatibility across active node interface cards during online system operations.

Standard Shipping Package & Contents

  • 1 x ABB NKCL01-10 Coaxial Cable Assembly (10 ft length)
  • Protective connector end caps and sealed polybag packaging

Cable Installation & Route Management Rules

  • Static Bend Radius: Maintain a minimum bend radius of 65 mm along the entire cable run to avoid pinching the dielectric core and altering line impedance.
  • Isolation Distance: Lay coaxial runs at least 300 mm away from 480 VAC power cables, motor leads, and variable frequency drive outputs to eliminate induced EMI noise.
  • Connector Engagement: Hand-tighten coaxial BNC/F-type locking collars completely to ensure low-resistance shield contact and prevent signal intermissions.
  • Physical Pulling Tension: Do not exceed a maximum pulling tension of 18 kg (40 lbs) during conduit pulls to preserve inner 20 AWG conductor integrity.

Engineering FAQ & Physical Limits

  • What is the nominal characteristic impedance of the NKCL01-10 cable assembly?

    The cable maintains a 75 ohm nominal impedance to match standard Bailey Infi-Net line termination specs.

  • Can the 10 ft cable length be cut and re-terminated in the field?

    Field cutting is not recommended; altering length disrupts factory velocity factor tuning and attenuation calibration.

  • What voltage isolation rating does the outer jacket insulation provide?

    The dielectric and jacket construction is rated for continuous dielectric withstand up to 500 V AC.

  • How does the 80% velocity of propagation affect data timing?

    It allows signals to travel at 80% of light speed, minimizing delay across RIO node communication loops.

  • Does disconnecting this cable interrupt node bus communication?

    Yes, removing an active cable breaks the physical loop, causing communication timeouts on connected nodes.

  • What wire gauge size is used for the center signal conductor?

    The central signal path utilizes a solid 20 AWG conductor for optimal high-frequency conductivity.

  • How should spare cable slack be coiled inside marshalling cabinets?

    Loop extra cable in loose circles no smaller than 150 mm in diameter; avoid sharp right-angle bends.

  • Can this coaxial cable be submerged or exposed to standing water?

    No, the cable is designed for dry industrial environments within 5-95% RH non-condensing limits.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
Sep 13, 2026
MaxWell
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
The oil and gas industry is accelerating adoption of predictive maintenance strategies, with over 60%...
Read More
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Sep 13, 2026
MaxWell
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Industrial automation companies reported mixed financial results for the second quarter of 2026, reflecting varying...
Read More
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Sep 13, 2026
MaxWell
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Power Construction Corporation of China is advancing a portfolio of wind power projects totaling more...
Read More
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Sep 12, 2026
MaxWell
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Siemens' industrial artificial intelligence strategy has evolved from concept demonstration to production deployment, marking a...
Read More
ABB Rotork Acquisition Analysis: Strategic Expansion in Flow Control
Sep 12, 2026
MaxWell
ABB Rotork Acquisition Analysis: Strategic Expansion in Flow Control
ABB's landmark $5.5 billion acquisition of Rotork represents a decisive move to strengthen its position...
Read More
Global Renewable Energy Trends 2026: IRENA Statistical Insights
Sep 11, 2026
MaxWell
Global Renewable Energy Trends 2026: IRENA Statistical Insights
The International Renewable Energy Agency's 2026 statistical report reveals accelerating momentum in global renewable energy...
Read More
ABB IP66/Type 4X Drives: Rugged Motor Control Solutions for Harsh Industrial Environments
Sep 11, 2026
MaxWell
ABB IP66/Type 4X Drives: Rugged Motor Control Solutions for Harsh Industrial Environments
ABB has expanded its motor control portfolio with the introduction of ACS580, ACH580, and ACQ580...
Read More
DCS Selection Guide: Matching Control Architecture to Process Requirements
Sep 11, 2026
Shopify API
DCS Selection Guide: Matching Control Architecture to Process Requirements
Selecting the appropriate distributed control system requires careful analysis of process characteristics, operational requirements, and...
Read More
Rockwell Automation TechConnectIQ: AI-Powered Support Reshapes Industrial Service Delivery
Sep 11, 2026
MaxWell
Rockwell Automation TechConnectIQ: AI-Powered Support Reshapes Industrial Service Delivery
Rockwell Automation has introduced a comprehensive suite of technology initiatives aimed at transforming how manufacturers...
Read More
Wind Farm SCADA Optimization: Maximizing Energy Yield Through Data Analytics
Sep 10, 2026
MaxWell
Wind Farm SCADA Optimization: Maximizing Energy Yield Through Data Analytics
Wind farm SCADA systems have evolved from simple monitoring tools into sophisticated data analytics platforms...
Read More