DSPU131 3BSE000355R1 ABB Advant Master Series MA200 Interface Board
ABB

DSPU131 3BSE000355R1 ABB Advant Master Series MA200 Interface Board

SKU: DSPU131
Categories : ABB
In Stock
  • Dimensions: 2 x 35 x 12.8 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for MA200 bus bridging between an Advant Master engineering station PC and the controller rack, the ABB DSPU131 3BSE000355R1 (DSPU131 MA200 Interface Board) provides direct AT-bus physical-layer translation and DSP-assisted packet routing.

Part Number and Variant Notes

DSPU131 is the base board type, 3BSE000355R1 the ABB order/serial prefix. Market labels also read "DSPU 131 MA200 Interface Board". This is not a DSSR/DSSA power or I/O card; it seats in the engineering-station ISA/AT slot or the dedicated MasterAid 200 interface bay, not in a standard S100 I/O rack. No "-EL/-NK" country suffix is printed on the board itself; Sweden is the declared origin per ABB tariff data. Do not confuse with DSPC131 (communication processor) or DSSR131 (relay supply).

Hardware Specifications

Parameter Specification
Model DSPU131 3BSE000355R1
Brand ABB
Origin Sweden
Weight 0.36 kg
Shipping Dimensions 20 mm x 350 mm x 128 mm
Operating Temp 0 deg C to +50 deg C (cabinet enclosed)
Storage Temp -40 deg C to +85 deg C
Bus Host AT-bus / ISA 16-bit (engineering station side)
Plant Bus MA200 (Advant Master backplane link)
Processor 32-bit DSP, 200 MHz
Onboard Memory 256 KB RAM, 512 KB Flash
Backplane Power +5 VDC 1.6 A, +12 VDC 25 mA, -12 VDC 25 mA
Power Consumption 8.5 W max (from host AT-bus +5 V rail)
Link Indicators PWR, ACT, ERR LEDs
Isolation Opto-decoupled MA200 side, 1000 VDC
Mounting Engineering-station ISA slot or MA200 interface bay
Compliance CE, RoHS exempt 2011/65/EU Art 2(4), WEEE Cat 5
Tariff Code 8517620050

AT-bus to MA200 Bridge and Backplane Bus Behavior

DSPU131 carries a 32-bit DSP that terminates the engineering-station AT-bus (ISA 16-bit electrical, 8 MHz host clock) on one edge and the MA200 differential link on the other. The DSP firmware (resident in 512 KB Flash, booted into 256 KB RAM) performs MA200 frame assembly, node addressing, and CRC validation; it does not execute IEC 61131 logic and does not drive S100 I/O cards directly. Backplane bus communication velocity on MA200 is fixed by the Advant Master SW cycle (typically 10-50 ms token window); the DSP adds no negotiable latency beyond its 200 MHz instruction pipeline. Firmware flash compatibility is bound to MasterAid 200 / PG200 toolchain — a DSPU131 burned with AC450-only image will not enumerate on a MasterPiece 200 engineering station and vice versa. Hot-swap is not supported on the AT-bus side (ISA spec forbids live extraction); on the MA200 side the link recovers in roughly 2-3 s after reconnect but the engineering session must re-bind.

Ordering Info

  • 1 x DSPU131 3BSE000355R1 PCB with AT-edge connector and MA200 front D-sub
  • 1 x printed Sweden-origin label with 3BSE000355R1 barcode
  • 1 x RoHS exemption sticker (Art 2(4))
  • 2 x mounting bracket screws pre-fitted
  • No ribbon cable, no MA200 terminator, no PG200 software media included

Installation and Bus Bonding

  • Seat in a free 16-bit ISA slot of the Advant engineering station; 8-bit slot yields AT-bus decode fault and ACT LED never blinks.
  • Terminate MA200 link with 120 ohm at the furthest node; DSPU131 itself is mid-bus, not terminator.
  • Bond AT-bus chassis ground to controller rack 24 VDC field ground at single point in cabinet; do not loop shield through DSPU131 metal bracket.
  • Keep MA200 coax/paired run away from 24 VDC power trays by 50 mm minimum to suppress ARCnet-era reflection noise.
  • Never extract under AT-bus power; ISA gold fingers arc and can latch the host PC southbridge.

Frequently Asked Questions

Does DSPU131 execute control logic for AC450?

No. It only bridges MA200 frames between engineering station and controller rack. All IEC 61131 code runs on PM630/AC450 CPU; DSPU131 DSP handles protocol packing, not process scanning.

What power does the board draw from the PC?

+5 VDC 1.6 A dominant, plus +12 VDC 25 mA and -12 VDC 25 mA for MA200 transceiver bias. Total 8.5 W from AT-bus edge. A weak PC power supply under 200 W will brown out the board.

Can firmware be reflashed with modern Composer?

No. 3BSE000355R1 Flash image is bound to MasterAid 200 / PG200 DOS-Windows 2000 era toolchain. Composer 5.x does not push DSPU131 images; use the legacy ABB PGM132 burn utility on a segregated engineering laptop.

Is MA200 link galvanically isolated from AT-bus?

Yes. Opto-decouplers on the MA200 transceiver side provide 1000 VDC isolation. A ground fault on plant bus does not back-feed the engineering station motherboard, but the AT-edge ground still shares PC chassis.

Why does ACT LED stay dark after boot?

Either ISA slot is 8-bit only, or MA200 cable is unterminated/open. Check 120 ohm terminator at far node, verify +5 VDC on AT-bus pin 29-30, and confirm DSPU131 enumerates in PG200 hardware scan.

Can two DSPU131 share one engineering station?

Yes, on separate ISA slots with distinct MA200 node IDs, but MasterAid 200 license historically binds one active MA200 session per board. Second board acts as passive sniffer unless re-addressed in registry.

What replaces DSPU131 in modern AC 800M retrofits?

Nothing pin-compatible. Migration uses OPC DA server on a PC plus CEX bus, dropping MA200 entirely. DSPU131 stays mandatory only for legacy Advant Master / MasterPiece 200 online maintenance.

What is the mechanical envelope for rack clearance?

Board is 334.6 mm x 121.9 mm x 21 mm typical (shipping box 20 x 350 x 128 mm). Needs 1 full ISA slot height plus 10 mm rear clearance for MA200 D-sub; does not fit low-profile SFF PCs.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More