Allen-Bradley 1734-OB8 POINT I/O Digital DC Sourcing Output Module
Allen-Bradley 1734-OB8 POINT I/O Digital DC Sourcing Output Module
Allen-Bradley 1734-OB8 POINT I/O Digital DC Sourcing Output Module
Allen-Bradley

Allen-Bradley 1734-OB8 POINT I/O Digital DC Sourcing Output Module

SKU: 1734-OB8
Categories : All Products
In Stock
  • Dimensions: 1.1 x 5.6 x 7.6 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for digital DC output signal execution in distributed industrial control networks, the Allen-Bradley 1734-OB8 (1734-OB8 POINT I/O module) provides direct physical/electrical execution.

Nomenclature & Architectural Breakdown

  • Product Base: 1734
  • Catalog Number: OB8
  • Series Platform: POINT I/O
  • Module Variant: Digital DC Sourcing Output
  • Channel Count: 8 Outputs

Hardware Specifications

Parameter Specification
Model 1734-OB8
Brand Allen-Bradley
Origin USA
Weight 0.04 kg
Shipping Dimensions 1.1 cm x 5.6 cm x 7.6 cm
Operating Temp Not specified
Power Consumption 2.0 W (6.8 BTU/hour)
Output Voltage Range 10 V DC to 28.8 V DC

Industrial Network & Backplane Integration

Integrated across Profinet and EtherNet/IP deterministic networks, this digital output module supports backplane bus communication velocity and I/O density scaling. The onboard processing logic manages protocol conversion latencies and ensures firmware flash compatibility, enabling synchronized control execution across distributed network nodes without introducing packet jitter or communication drops.

Package Contents & Ordering Details

  • 1 x 1734-OB8 Digital DC Sourcing Output Module unit
  • 1 x Removable terminal base connector
  • 1 x Technical installation reference document

Physical Installation Guidelines

  • Enclosure Clearance: Maintain adequate vertical and horizontal spacing around the module housing to allow proper convective airflow and thermal dissipation.
  • DIN-Rail Mounting: Secure the unit firmly onto a standard 35 mm industrial DIN rail, verifying that the mechanical locking mechanism engages completely.
  • Wiring Termination: Connect field actuator lines securely into the terminal blocks, ensuring proper conductor strip length to prevent exposed copper.
  • Grounding Compliance: Fasten the base assembly directly to a grounded metal panel or mounting plate to mitigate electromagnetic interference and ensure noise immunity.

Frequently Asked Questions

  • Q: Can this module drive inductive loads directly without external suppression diodes?

    A: Inductive loads connected to sourcing outputs require flyback diodes or surge suppression networks to safely absorb magnetic kickback energy and prevent premature contact wear or internal semiconductor breakdown.

  • Q: How does the POINTBus current draw affect power supply sizing in an expanded chassis?

    A: The module draws 75 mA from the internal POINTBus, which must be factored alongside other connected cards to ensure the adapter power supply does not experience voltage sag or overload.

  • Q: What troubleshooting steps are indicated when the module status indicator flashes red?

    A: A flashing red module status typically signals a recoverable or unrecoverable internal fault, configuration mismatch with the network scanner, or a faulted communication handshake over the backplane.

  • Q: Are output channels isolated from each other or grouped as a single common rail?

    A: The 8 sourcing channels share common power distribution paths inside the block architecture, meaning individual channel-to-channel galvanic isolation is not present across the internal switching transistors.

  • Q: What precautions must be observed during live-insertion and removal operations?

    A: While the POINT I/O backplane design permits removal under power in specific non-hazardous architectures, control outputs must be forced to a safe, de-energized state first to prevent unexpected machine actuation.

  • Q: How do the yellow logic status indicators assist with diagnostic checks during operation?

    A: Each of the 8 yellow LEDs illuminates directly when the internal processor commands the corresponding output switch closed, allowing immediate visual verification of command logic versus field wiring state.

  • Q: What impact does elevated ambient cabinet temperature have on the 3 A per module current rating?

    A: High internal enclosure temperatures reduce the thermal dissipation capacity of compact electronics, potentially requiring a de-rated maximum current load to prevent thermal trip or component degradation.

  • Q: Why is correct key switch positioning critical prior to mounting the module onto its base?

    A: The mechanical key switch prevents accidental insertion of incompatible voltage types or module families into a wired terminal base, protecting internal circuitry from destructive over-voltage cross-wiring.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More