ABB PHAMSCTER20000 Termination Accessory Infi 90
ABB

ABB PHAMSCTER20000 Termination Accessory Infi 90

SKU: PHAMSCTER20000
Categories : ABB
In Stock
  • Dimensions: 2.5 x 3.8 x 5.1 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB PHAMSCTER20000, serves as the primary PHAMSCTER20000 Termination Accessory utilized to execute HNET bus optical termination and signal stabilization across Infi 90 platforms.

Variant Model Identification

The PHAMSCTER20000 functions as an active fiber-optic bus terminator within the HNET system network. The base prefix PHAMS identifies the high-speed network interface accessory group, while the CTER20000 designation specifies an active 1300 nm optical termination unit rated for 62.5/125 um multimode fiber cabling across distances up to 2 km.

System Specifications

Parameter Specification
Model PHAMSCTER20000
Brand ABB
Origin Sweden
Weight 0.3 kg
Shipping Dimensions 2.5 x 3.8 x 5.1 cm
Operating Temp 0 to +70 deg C
Storage Temp -40 to +85 deg C
Power Consumption Typically 1.5 W
Input Power 5 V DC
Fiber Type Multimode, 62.5/125 um
Wavelength 1300 nm
Transmission Distance Up to 2 km
Humidity 5 to 95% RH (non-condensing)
Altitude Up to 2000 m without derating

Network Bus Performance and Protocol Integration

The optical terminator maintains deterministic network communication by suppressing signal reflections along the optical HNET bus backbone. This active termination supports maximum backplane bus communication velocity across node controllers, optimizes overall system I/O density scaling, and preserves complete hardware firmware flash compatibility without adding network latency.

Package Configuration

  • 1 x ABB PHAMSCTER20000 Termination Accessory

Fiber Link Installation and Mounting Rules

  • Clean optical connector ferrule tips with lint-free alcohol wipes prior to mating with the terminator interface port.
  • Maintain a minimum fiber cable bend radius of 30 mm along trunk cabling runs to avoid optical signal attenuation.
  • Connect the 5 V DC auxiliary power leads directly to the designated power rail terminal block.
  • Secure the terminator housing to prevent mechanical strain on connected fiber links.

Technical FAQ

  • What is the primary functional role of the PHAMSCTER20000 unit?

    The unit acts as an active optical terminator for the HNET fiber bus to eliminate signal reflections.

  • What fiber optic cable specification is required for this terminator?

    It requires standard 62.5/125 um multimode fiber optic cable infrastructure.

  • What operating optical wavelength does the internal transmitter use?

    The optical interface operates at a nominal center wavelength of 1300 nm.

  • What is the maximum optical link distance supported by the unit?

    The terminator supports optical HNET network segment lengths reaching up to 2 km.

  • What input supply voltage is required to power the active circuitry?

    The internal transceiver circuitry requires a regulated 5 V DC power input rail.

  • What typical power dissipation does the terminator draw during operation?

    The unit draws a typical operational power consumption of 1.5 W from the 5 V DC supply.

  • What is the maximum operating altitude without thermal derating?

    The accessory is rated for continuous operation up to 2000 m altitude without derating.

  • What operating temperature range is supported by the unit?

    The module operates within an ambient temperature environment from 0 to +70 deg C.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
Sep 15, 2026
MaxWell
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
The U.S. Energy Information Administration forecasts that the United States will add a record 86...
Read More
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
Sep 15, 2026
MaxWell
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
WindEurope expects Europe to install 151 gigawatts of new wind power capacity over the 2026-2030...
Read More
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
Sep 15, 2026
Shopify API
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
India has achieved a significant renewable energy milestone, reaching 150 gigawatts of installed solar capacity...
Read More
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Sep 14, 2026
Shopify API
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Masdar and ScottishPower Renewables have announced significant progress on the East Anglia Three offshore wind...
Read More
China Develops World's Largest 50MW Floating Wind Turbine Prototype
Sep 14, 2026
Shopify API
China Develops World's Largest 50MW Floating Wind Turbine Prototype
China is developing what is planned to become the world's largest floating wind turbine with...
Read More
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
Sep 13, 2026
MaxWell
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
The oil and gas industry is accelerating adoption of predictive maintenance strategies, with over 60%...
Read More
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Sep 13, 2026
MaxWell
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Industrial automation companies reported mixed financial results for the second quarter of 2026, reflecting varying...
Read More
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Sep 13, 2026
MaxWell
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Power Construction Corporation of China is advancing a portfolio of wind power projects totaling more...
Read More
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Sep 12, 2026
MaxWell
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Siemens' industrial artificial intelligence strategy has evolved from concept demonstration to production deployment, marking a...
Read More