07KR51 1SBP260010R1001 ABB Advant Controller 31 Basic Unit
07KR51 1SBP260010R1001 ABB Advant Controller 31 Basic Unit
07KR51 1SBP260010R1001 ABB Advant Controller 31 Basic Unit
ABB

07KR51 1SBP260010R1001 ABB Advant Controller 31 Basic Unit

SKU: 1SBP260010R1001
Categories : ABB
In Stock
  • Dimensions: 15.2 x 12.7 x 15.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 07KR51 1SBP260010R1001 serves as the primary 07KR51 Basic Unit utilized to execute logic processing and signal routing across Advant Controller 31 platforms.

Model Identification & Code Designation

  • 07KR51: Base central processing and integrated I/O hardware unit variant within the Advant Controller 31 architecture.
  • 1SBP260010R1001: Unique commercial order code for exact manufacturing identification, hardware revision control, and replacement tracking.

System Specifications

Parameter Specification
Model 07KR51 1SBP260010R1001
Brand ABB
Origin Sweden
Weight 0.5 kg
Shipping Dimensions 15.2 x 12.7 x 15.2 cm
Operating Temp 0 to +55 deg C
Power Consumption 5 W
Supply Voltage 24 VDC
Relay Outputs 6 relay outputs (24 VDC, 2 A per channel)
Digital Expansion Limit 1000 max I/O points
Analog Expansion Limit 258 AI / 224 AO max
High-Speed Counter Input 7 kHz max frequency
User Program Memory 34 kB (Flash EPROM)
User Data Memory 4.4 kB
Operating Altitude Limit 2000 m

System Bus Protocols & Firmware Execution

The central processing unit utilizes deterministic system bus architectures to maintain constant scan execution times across local and remote I/O points. Flash EPROM non-volatile memory secures application logic against power loss, eliminating the risk of firmware corruption. High firmware flash compatibility ensures synchronized cyclic task execution, while high-density I/O expansion buses handle signal processing without latency bottlenecks.

Ordering Information

  • 1 x ABB 07KR51 1SBP260010R1001 Advant Controller 31 Basic Unit
  • 1 x Removable Screw Terminal Block Set

Field Wiring & Mounting Procedures

  • Enclosure Installation: Secure the controller unit inside an IP54-rated metal enclosure to protect internal electronics against airborne contaminants and direct moisture contact.
  • Power Wire Routing: Connect the 24 VDC power source using short, heavy-gauge copper wires to minimize voltage drops during relay switching surges.
  • Cable Shield Termination: Connect field signal shields to an external ground rail located near the entry panel to direct transient noise away from digital logic circuits.

Frequently Asked Questions

  • How is application logic retained during complete system power loss?

    User programs are stored in internal non-volatile Flash EPROM memory, retaining logic indefinitely without reliance on battery backup power.

  • Can the integrated high-speed counter handle quadrature encoder inputs up to 7 kHz?

    Yes, the onboard hardware counter input processes pulse signals up to a maximum frequency of 7 kHz for high-speed tracking tasks.

  • What are the switching voltage and current limits for the 6 relay outputs?

    The relay outputs are rated for 24 VDC supply level switching with a maximum load current capacity of 2 A per channel.

  • How many total I/O points can be addressed by this single central unit?

    The unit supports expansion up to a maximum of 1000 digital I/O points, 258 analog inputs, and 224 analog outputs over system buses.

  • Is live insertion or removal of the unit permitted while powered?

    No, power to the main supply line must be disconnected prior to mounting or removing the controller base unit to avoid hardware damage.

  • What is the maximum operating altitude for full electrical isolation?

    The internal electrical components and insulation distances are rated for normal operating altitudes up to 2000 m above sea level.

  • What type of physical signal connectors does the unit utilize?

    Field connections are established via heavy-duty screw-type terminal blocks mounted directly to the front face of the controller housing.

  • How is the core logic firmware execution verified after power-up?

    Internal system diagnostic routines execute automatically on bootup, illuminating green LED indicators when backplane bus communication initializes.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

07KR51 1SBP260010R1001 ABB Advant Controller 31 Basic Unit

You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More