Yokogawa ANR10D-423 ER Bus Node Unit Duplexed 100-120V AC
Yokogawa ANR10D-423 ER Bus Node Unit Duplexed 100-120V AC
Yokogawa

Yokogawa ANR10D-423 ER Bus Node Unit Duplexed 100-120V AC

SKU: ANR10D-423
Categories : All Products
In Stock
  • Dimensions: 482.6 mm x 132.5 mm x 320 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ANR10D-423 stands as a pivotal communication and power distribution hub within the Yokogawa CENTUM VP and CENTUM CS 3000 architectures. As an ER Bus Node Unit, its primary function is to bridge field-level analog and digital I/O signals with the centralized Field Control Unit (FCU). This module not only facilitates high-integrity data transmission across the ER bus protocol but also serves as the local power source for up to eight I/O modules housed within its chassis. By utilizing the ANR10D-423, industrial operators can effectively extend their system's reach to remote locations while maintaining the rigorous timing and synchronization required for complex process automation.

Critical Hardware Specifications

The ANR10D-423 is a robust, rack-mounted assembly engineered for high-availability performance in demanding environments.

Parameter Technical Data
Model Type Duplexed ER Bus Node Unit
Power Input 100 V to 120 V AC (50/60 Hz)
Power Consumption 200 VA / 120 W
I/O Capacity Supports up to 8 I/O Modules
Mounting Format 19-inch Rack Mount (M5 screws)
Communication Bus ER Bus (Max 4 per FCU)
Full Assembly Weight 10 kg (including 8 typical I/O modules)
External Dimensions 482.6 mm x 132.5 mm x 320 mm (Standard 3U height)
Regulatory Marks CE, CSA, FM Non-Incendive, KC, C-Tick
Interface Requirements Requires EB401 Interface Master Module at the FCU side

System Integration and Industrial Usage

The ANR10D-423 is designed for versatile deployment across distributed plant networks. Its integration capabilities vary depending on the host controller and database configuration:

  • Vnet/IP Modernization: When integrated with AFV10 controllers using LFS1500/LFS1550, it allows for expanded node counts (up to 14 units per FCU), supporting large-scale data acquisition across expansive chemical or power facilities.

  • Compact Field Control: Compatible with AFF50 controllers for localized or smaller-scale process units, maintaining a maximum of 3 node units per controller branch.

  • Remote Instrumentation: Ideal for offshore platforms or remote pumping stations where I/O signals must be consolidated and sent back to a central host over the ER bus.

  • Redundant Operations: The "D" in the model name signifies a duplexed configuration, making it suitable for safety-critical loops where power and communication redundancy are mandatory for operational continuity.

FAQ

Q: What hardware is required to connect the ANR10D-423 to my Field Control Unit?

A: You must install an EB401 ER Bus Interface Master Module into your ESB Bus Node Unit or Field Control Unit. For single configurations, the EB401 must occupy an odd-numbered slot with the adjacent right-side slot left empty.

Q: Is the T-type connector included with this unit?

A: Yes, the T-type connector for the ER Bus (model YCB146) is supplied as a standard accessory with the ANR10 series units to facilitate bus daisy-chaining.

Q: Can I use this unit in a hazardous environment?

A: The ANR10D-423 complies with FM and CSA Non-Incendive standards for specific hazardous locations. For installations following the ATEX Directive, you must verify the presence of the /ATDOC option code.

Q: How many ER Bus Node Units can I connect to a single AFV10 controller?

A: If the controller is running the LFS1500 software with the LFS1550 expansion package, you can connect up to 14 ER Bus Node Units. Without the expansion package, the limit is typically 3 units.

Q: What is the significance of the /NDEL option code mentioned in the documentation?

A: The /NDEL option code is mandatory when connecting the ANR10 node unit to AFF50 or AFV10 controllers to ensure proper firmware and communication protocol compatibility.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More