SD802F 3BDH000012R1 ABB Power Supply Module AC800F Series
ABB

SD802F 3BDH000012R1 ABB Power Supply Module AC800F Series

SKU: 3BDH000012R1
Categories : ABB
In Stock
  • Dimensions: 6.6 x 12.5 x 15.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB SD802F 3BDH000012R1 serves as the primary SD802F Power Supply Module utilized to execute direct physical/electrical execution for redundant 24 VDC voltage generation across AC800F platforms. The hardware module converts incoming wide-range alternating current down to a regulated direct current output, providing decoupled infrastructure power to field controllers, communication blocks, and adjacent system accessories.

Functional Allocation Summary

The catalog designations distinguish specific physical properties and electronic layouts for the SD8000 Series power group:

  • SD802F: Base technical hardware model reference for the 120 W power processing block.

  • 3BDH000012R1: Complete operational spare reference matching factory internal component matrices.

Electrical and Physical Parameters

Parameter Specification
Model SD802F 3BDH000012R1
Brand ABB
Origin Sweden
Weight 0.44 kg
Shipping Dimensions 6.6 cm x 12.5 cm x 15.5 cm
Operating Temp -25 deg C to +70 deg C
Power Consumption Internally dissipated loss values under full 120 W output conditions
Input Voltage Range 90-264 V AC nominal
Output Configuration 24 V DC nominal baseline voltage rating
Output Current 5 A continuous current load capacity
Tariff Code 8537101190

Backplane Bus Communication and Firmware Flash Compatibility

The power module structures its output rails to maintain execution continuity while verifying internal load health profiles. When paired in parallel configurations, integrated diode auctioneering circuits handle independent voltage isolation to protect active loads from unexpected grid shifts or singular module failure loops. This isolation maintains local backplane bus communication velocity metrics under peak power drawing phases, while specific internal configurations enforce strict firmware flash compatibility alignments when reading supply diagnostic registers through field controller software.

Hardware Infrastructure Inquiry Desk

Q: Does this power module allow online hot-swap replacement within a dual assembly?

A: Yes, when deployed in a standard parallel configuration with active decoupling diodes, a faulty module can be removed and replaced without interrupting power to the functional processing rack.

Q: How does the unit protect downstream circuits from an output overvoltage fault?

A: The hardware contains an independent internal overvoltage protection circuit that clamps the output rail and triggers a safe shutdown state if the voltage crosses factory thresholds.

Q: What physical indications verify that the output loop is operating correctly?

A: The front panel features a status LED display that monitors incoming AC line presence and correct DC output regulation levels.

Mechanical Rigging and Grounding Directives

  • Secure the module chassis vertically onto standard symmetrical 35 mm DIN rails inside a metal enclosure.

  • Maintain at least 80 mm of vertical spacing above and below the cooling apertures to prevent stagnant thermal layering.

  • Connect the primary protective earth wire directly to the copper ground rail before energizing the main power inputs.

  • Route the secondary low-voltage DC lines along separate wiring pathways away from high-voltage AC cabling runs.

Procurement Package Content

  • ABB AC800F SD802F Redundant Power Supply Card

  • Detachable Screw-Terminal Block Connector Assembly Set

  • Printed Technical Validation and Testing Data Sheet

Freight and Consignment Standards

Delivery time: 2-7 days when payment finish through premium international freight networks including DHL, FEDEX, and UPS. All equipment is placed in sealed, anti-static industrial packaging complete with dense structural foam linings to protect the internal electrical components from transit shock loads.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More
China Intelligent Technology Empowers Global South
Oct 11, 2026
Maxwell
China Intelligent Technology Empowers Global South Mining Development
China's mining intelligence technologies are gaining international recognition as countries across the Global South seek...
Read More
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
Oct 11, 2026
Maxwell
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
The city of Luliang in Shanxi Province has emerged as a showcase for the transformation...
Read More
2026 Hefei International New Energy Vehicle Exhibi
Oct 11, 2026
Maxwell
2026 Hefei International New Energy Vehicle Exhibition Opens September 30
The 2026 Hefei International New Energy Vehicle Exhibition opened on September 30 at the Hefei...
Read More