GC C960 C103 3BHE033067R0103 ABB Phase Interface Board AC 800PEC Series
GC C960 C103 3BHE033067R0103 ABB Phase Interface Board AC 800PEC Series
GC C960 C103 3BHE033067R0103 ABB Phase Interface Board AC 800PEC Series
ABB

GC C960 C103 3BHE033067R0103 ABB Phase Interface Board AC 800PEC Series

SKU: 3BHE033067R0103
Categories : ABB
In Stock
  • Dimensions: 44.8 x 17.3 x 4.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB GC C960 C103 3BHE033067R0103, also cataloged as the GC C960 C103 Phase Interface Board, operates as a dedicated hardware component for phase signal processing and converter firing control within AC 800PEC platforms.

Hardware Identification & Subsystem Architecture

The hardware part number structure identifies functional features within the controller chassis:

  • GC C960 C103: Circuit board variant designating the high-speed phase interface hardware topology.

  • 3BHE033067R0103: Unique manufacturing part number assigned to the printed circuit assembly.

  • AC 800PEC: Control system platform utilizing dedicated processing boards for converter control loops.

Technical & Environmental Specifications

Parameter Specification
Model GC C960 C103 (3BHE033067R0103)
Brand ABB
Origin Sweden
Weight 2.82 kg
Shipping Dimensions 44.8 cm x 17.3 cm x 4.2 cm
Operating Temp -20 to +70 deg C
Power Consumption 5 to 10 W
Supply Voltage 24 VDC (+/- 10%)
System Memory Integrated 512 MB to 1 GB RAM
Storage Temp -40 to +85 deg C
Relative Humidity 5 to 95% non-condensing
Harmonized Tariff Code 8537101190

Deterministic High-Speed Bus Communication

The phase interface module interfaces directly with high-speed rack buses to achieve predictable execution timing for fast switching cycles. High backplane bus communication velocity ensures real-time exchange of converter state variables, while firmware flash compatibility permits seamless integration across AC 800PEC control hardware updates without disturbing onboard RAM memory maps.

Standard Delivery Hardware

  • 1 x ABB GC C960 C103 3BHE033067R0103 Phase Interface Board

Mounting & Mechanical Handling Rules

  • ESD Protection Protocols: Standard static precautions apply. Ground wrist straps to cabinet metal framework before touching board edge connectors.

  • Subrack Power Isolation: Disconnect the 24 VDC main supply from the rack chassis before inserting or extracting the board assembly.

  • Connector Insertion: Slide board smoothly along chassis card guides until rear interface multi-pin headers seat completely. Tighten front panel retaining screws.

  • Field Wiring Routing: Keep high-frequency optical or copper phase feedback lines isolated from heavy DC power feed lines within the panel wire ducts.

Frequently Asked Questions

  • What supply voltage tolerance is permitted on the power input lines?

    The board requires a nominal 24 VDC power source with an allowable operational tolerance window of +/- 10%.

  • What is the typical operational power consumption of the phase interface board?

    During active signal conversion, the internal circuit architecture typically consumes between 5 W and 10 W.

  • Does the board support live hot-swapping during converter operation?

    No, removing or inserting the board while the subrack backplane is energized can damage sensitive digital bus circuits.

  • How much volatile RAM memory is integrated on the board circuit?

    The onboard memory architecture includes typically 512 MB to 1 GB of RAM for fast execution buffering.

  • What range of operating temperatures can the board withstand in enclosure installations?

    The unit is rated for operation across ambient temperatures ranging from -20 deg C up to +70 deg C.

  • How are phase switching signals isolated from central controller logic?

    The board utilizes dedicated optical and galvanic isolation barriers to prevent field noise from affecting core control loops.

  • What procedure prevents backplane pin damage during card installation?

    Ensure the module aligns perfectly with top and bottom subrack card guides before applying firm pressure on the faceplate.

  • Is manual calibration required upon replacing a damaged interface board?

    No hardware calibration is required; the central controller downloads necessary execution configuration parameters on startup.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
Sep 06, 2026
MaxWell
Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
In a strategic move to capitalize on South America's premier unconventional energy play, Continental Resources...
Read More
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Sep 06, 2026
MaxWell
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Industrial control panel manufacturing continues to face skilled labor shortages and tight project turnaround timelines,...
Read More
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Sep 06, 2026
MaxWell
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Data analytics firm Enverus has published its US land drilling contractor and operator performance rankings...
Read More
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
Sep 05, 2026
MaxWell
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
 Rapid digitalization across modern manufacturing has created a pronounced talent discrepancy among incoming control system...
Read More
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
Sep 05, 2026
MaxWell
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
The industrial automation sector continues to grapple with a long-standing challenge: bridging theoretical academic research...
Read More
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
Sep 05, 2026
MaxWell
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
The industrial manufacturing landscape is witnessing a growing divide between discrete assembly operations and complex...
Read More
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Sep 04, 2026
MaxWell
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Germany’s manufacturing framework is undergoing a structural pivot, balancing macroeconomic stagnation with targeted, high-capital deployments...
Read More
Emerson Unveils DeltaV v16.LTS DCS Architecture
Sep 04, 2026
MaxWell
Emerson Unveils DeltaV v16.LTS DCS Architecture
Modern industrial operations face mounting pressure to modernize their automation infrastructure while controlling lifecycle expenditures...
Read More
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Sep 04, 2026
MaxWell
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Industrial facilities are rapidly evolving into the primary engines of data generation across global enterprise...
Read More
Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More