ALF111-S51 Yokogawa FOUNDATION Fieldbus Communication Module /F9S00
Yokogawa

ALF111-S51 Yokogawa FOUNDATION Fieldbus Communication Module /F9S00

SKU: ALF111-S51
Categories : All Products
In Stock
  • Dimensions: 130 mm x 130 mm x 42 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Yokogawa ALF111-S51 acts as a high-performance digital gateway, enabling the CENTUM VP and ProSafe-RS control systems to interface directly with FOUNDATION Fieldbus (FF) H1 segments. This module serves as a Link Active Scheduler (LAS), managing the precise cyclic and acyclic data exchange required for multi-variable field instruments. By utilizing the ALF111-S51, industrial facilities can transition from traditional analog loops to a fully digital architecture, gaining access to extensive device diagnostics, reduced wiring complexity, and enhanced signal integrity. This specific S51 configuration includes the ISA Standard G3 conformal coating, providing essential defense against atmospheric corrosion in challenging chemical or coastal environments.

Technical Infrastructure and Hardware Profile

The ALF111-S51 is designed for high-density integration within Yokogawa node units, offering reliable digital bus management.

  • Communication Standard: FOUNDATION Fieldbus H1 (31.25 kbps)

  • Number of Ports: 4 segments per module

  • Maximum Devices: Up to 32 devices per module (8 per segment)

  • Digital Interface functionality: Link Active Scheduler (LAS) and Basic Device roles

  • Corrosion Resistance: ISA Standard G3 compliant coating

  • Terminal Interface: Includes ATF9S-00 pressure clamp terminal block

  • Current Consumption: 0.5 A at 5 V DC

  • Module Weight: 0.4 kg (400g)

  • Full Shipping Weight: 2.0 kg

  • Unit Dimensions: 130 mm x 130 mm x 42 mm

  • Environmental Tolerance: 0 to 60 degrees Celsius operating range

Strategic Industrial Applications

The ALF111-S51 is a foundational component for plants seeking data-rich instrumentation and decentralized control.

  • Advanced Process Monitoring: Connecting smart transmitters (pressure, temperature, flow) to the DCS while capturing secondary variables and device health status simultaneously.

  • Corrosive Gas Protection: Operating in refineries or wastewater treatment plants where the G3 coating prevents circuit failure caused by hydrogen sulfide or other industrial pollutants.

  • Redundant Digital Backbones: Implementing dual-module configurations to ensure that communication with field segments remains active even during a module maintenance event.

  • Interoperability Management: Bridging diverse third-party field instruments into a unified Yokogawa control environment through the vendor-neutral FOUNDATION Fieldbus protocol.

FAQ

Q: What is the significance of the /F9S00 suffix on this module?

A: The /F9S00 suffix indicates that the module is supplied with the ATF9S-00 pressure clamp terminal block. This ensures secure and efficient wiring for the four Fieldbus H1 segments directly at the module interface.

Q: How many Fieldbus devices can I connect to a single ALF111-S51?

A: While the technical maximum is 32 devices per module (8 per segment), actual counts may vary based on power supply capacity and the communication traffic requirements of your specific control loops.

Q: Does this module support Link Active Scheduler (LAS) functions?

A: Yes, the ALF111-S51 can function as the LAS for each of its four segments, managing the bus communication schedule and ensuring deterministic data updates.

Q: Is it necessary to use a Fieldbus Power Supply with this module?

A: Yes, the ALF111-S51 provides the communication interface, but an external Fieldbus Power Supply and Power Conditioner are required to provide the necessary DC voltage to the field instruments.

Q: Can the ALF111-S51 be hot-swapped in a running system?

A: In a dual-redundant configuration, the module can be replaced while the system is under power without losing communication with the field instruments, provided the redundant partner module is healthy.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More