ABB NKLM01-5 Loop Interface Cable Infi 90 / Net 90
ABB

ABB NKLM01-5 Loop Interface Cable Infi 90 / Net 90

SKU: NKLM01-5
Categories : ABB
In Stock
  • Dimensions: 48.3 x 27.9 x 25.4 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for point-to-point process communication bus interfacing in Bailey Net 90 and Infi 90 architectures, the ABB NKLM01-5 (NKLM01 Loop Interface Cable) provides direct physical/electrical execution.

Cable Variant and Length Architecture

  • NKLM01-5: Base assembly with 5 ft (1.52 m) total length for intra-cabinet module interconnects.
  • NKLM01-10: Extended assembly variant with 10 ft length for adjacent cabinet routing.
  • NKLM01 Series Standard: Factory-molded termination interface for Bailey loop interface modules.

Physical and Electrical Parameters

Parameter Specification
Model NKLM01-5
Brand ABB
Origin SWEDEN
Weight 1.2 kg
Shipping Dimensions 48.3 x 27.9 x 25.4 cm
Operating Temp -20 to +80 deg C
Storage Temp -40 to +85 deg C
Humidity 5-95% RH (non-condensing)
Power Consumption Passive assembly (N/A)
Cable Length 5 ft (1.52 m)
Conductor Gauge 22-24 AWG
Voltage Rating 300 V AC
Current Rating 2 A per conductor
Characteristic Impedance 100-120 Ohm
Harmonized Tariff Code 8537101190

Backplane Bus Communication Integrity

Within ABB Net 90 and Infi 90 control node assemblies, the NKLM01-5 maintains continuous backplane bus communication velocity and signal fidelity. Matching the 100-120 Ohm characteristic impedance prevents high-frequency data pulse distortion during transfer cycles. Continuous shield coverage insulates internal 22-24 AWG conductors from high-voltage line interference, preventing data corruption across local control loops.

Package Scope of Delivery

  • 1 x ABB NKLM01-5 Cable Assembly (5 ft)
  • 1 x Factory Cable Quality Testing Document

Field Cable Installation and Routing Rules

  • Minimum Bend Radius: Maintain an absolute minimum bend radius of 8 times the total cable diameter during panel installation.
  • Separation Distance: Route the cable in designated low-voltage instrument ducts, maintaining at least 200 mm clearance from high-power AC cabling.
  • Connector Fastening: Tighten male end connector retention screws firmly to prevent unintended disengagement during system vibration.
  • Shield Continuity: Verify ground connection continuity at the main terminal cabinet earth bar before energizing connected communication modules.

Frequently Asked Questions

  • What causes data frame corruption when using the NKLM01-5 on a loop interface?

    Improper grounding or cable routing alongside high-voltage AC cables creates induced noise, exceeding the 100-120 Ohm transmission line tolerance.

  • Can the NKLM01-5 cable be hot-swapped while the loop interface is active?

    Disconnecting the cable during active operations interrupts data transfer instantly, causing connected controller modules to report communication timeouts.

  • What happens if the environmental temperature exceeds 80 deg C?

    Exceeding the +80 deg C limit degrades conductor insulation, shifting the characteristic impedance and increasing signal attenuation over time.

  • Is the 300 V AC voltage rating intended for power distribution applications?

    No, the 300 V AC rating defines dielectric strength limits for signal isolation; current capacity is strictly bounded at 2 A per conductor.

  • What wire size is used inside the NKLM01-5 cable harness assembly?

    The cable assembly utilizes high-purity copper conductors constructed within the 22-24 AWG wire gauge range.

  • Does the cable require external termination resistors at either connector end?

    Termination matching is managed internally by the connected Infi 90 or Net 90 loop interface hardware modules.

  • Can the 5-foot NKLM01-5 cable be field-cut and spliced to increase length?

    Cutting or splicing alters impedance parameters, triggering signal reflections that degrade communication reliability; custom factory cables must be used.

  • How does high ambient humidity impact cable transmission properties?

    The sealed outer jacket protects internal wiring up to 95% non-condensing RH; moisture ingress at connector faces must be prevented.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More