ABB 1TGE102009R4800 MLink Control Unit Baslc-Modbus TCP RS 485
ABB 1TGE102009R4800 MLink Control Unit Baslc-Modbus TCP RS 485
ABB 1TGE102009R4800 MLink Control Unit Baslc-Modbus TCP RS 485
ABB

ABB 1TGE102009R4800 MLink Control Unit Baslc-Modbus TCP RS 485

SKU: 1TGE102009R4800
Categories : ABB
In Stock
  • Dimensions: 23.5 x 16.5 x 10.1 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen

Request a quote

1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB 1TGE102009R4800 functions as a sophisticated MLink communication gateway designed to bridge the gap between disparate industrial networks. It resolves the common challenge of interoperability in complex automation environments by facilitating high speed data translation between Modbus TCP and serial RS 485 protocols. This MLink Control Unit acts as a critical node in Distributed Control Systems, allowing modern Ethernet based controllers to exchange real time information with legacy field devices. By providing a secure and deterministic communication path, it ensures that data from sensors and actuators remains accessible across the entire enterprise architecture, supporting the requirements of high availability industrial operations.

Essential Hardware Parameters

Feature Specification Details
Brand ABB
Model Number 1TGE102009R4800
Component Type MLink Control Unit
Network Protocols Modbus TCP and Modbus RTU RS 485
Input Voltage Range 85 to 264 V AC
Nominal Current Capacity 10 Amps
Efficiency Rating Greater than or equal to 90 percent
Thermal Operating Range -25 to +70 degrees Celsius
Net Weight 1.7 kg
Physical Dimensions 23.5 x 16.5 x 10.1 cm
Certifications CE and UL
Manufacturing Origin Sweden

Model Code Decomposition

The designation 1TGE102009R4800 Baslc-Modbus TPC serial RS 485 identifies the specific functional profile of the gateway:

  • 1TGE: Identifies the module within the ABB specialized electronics and interface hardware family.

  • 102009: The core hardware platform code, signifying its specific circuit architecture and internal processor capacity.

  • R4800: Refers to the internal software and firmware revision. The 4800 series is optimized for high volume data handling in multi protocol environments.

  • Baslc: Indicates the Basic license or baseline configuration for MLink functionality.

  • Modbus TPC serial RS 485: Explicitly defines the dual communication interface capability, supporting both Ethernet based TCP and traditional two wire RS 485 serial links.

Installation Strategy and Wiring

To ensure network stability and hardware protection, follow these professional installation protocols:

  • Mechanical Mounting: Install the unit on a standard 35mm DIN rail. Ensure the module is mounted vertically to utilize the passive convection cooling gaps. Maintain at least 50mm of clearance from adjacent high power modules to prevent thermal interference.

  • Power Input Wiring: Connect the 85-264V AC supply to the designated terminals. Use 1.5 to 2.5 mm2 stranded wire and ensure the protective earth terminal is securely bonded to the system ground.

  • Serial RS 485 Link: Use high quality shielded twisted pair cables for RS 485 connections. To prevent signal reflections on long cable runs, ensure a 120 ohm termination resistor is applied at both physical ends of the network segment.

  • Ethernet Configuration: Use Cat5e or higher shielded Ethernet cables for the Modbus TCP port. To minimize electromagnetic interference, keep data cables at least 10cm away from high voltage power lines within the cabinet.

FAQ Frequently Asked Questions

Does the 1TGE102009R4800 support simultaneous protocol conversion?Yes. The unit is designed to handle Modbus TCP and Modbus RTU serial communications concurrently, allowing it to act as a master gateway for multiple downstream serial devices while reporting back to an Ethernet based DCS.

What is the significance of the 10A current rating?This rating refers to the internal power distribution and switching capacity of the MLink unit, allowing it to maintain stable operation and manage high load communication cycles without overheating or voltage drops.

Can this unit be used in outdoor cabinets?The module is rated for operation down to -25 degrees Celsius, making it suitable for unheated outdoor cabinets in most climates, provided the enclosure is rated for the appropriate environmental ingress protection.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ISA Transactions Hits New Milestone with Top CiteScore in Industrial Automation
Jun 29, 2026
MaxWell
ISA Transactions Hits New Milestone with Top CiteScore in Industrial Automation
The ISA Transactions journal has reached a new benchmark of influence, securing the top CiteScore in its category with...
Read More
OMRON Unveils Next-Gen LD Series Autonomous Mobile Robots for High-Throughput Logistics
Jun 29, 2026
MaxWell
OMRON Unveils Next-Gen LD Series Autonomous Mobile Robots for High-Throughput Logistics
OMRON Robotics is set to debut the next generation of its flagship LD Series autonomous mobile...
Read More
ABB and Samsung Integrate Building Intelligence with Enterprise IoT Ecosystem
Jun 29, 2026
MaxWell
ABB and Samsung Integrate Building Intelligence with Enterprise IoT Ecosystem
ABB and Samsung Electronics have deepened their strategic partnership by integrating ABB Ability BuildingPro with the Samsung SmartThings...
Read More
The Evolving Mandate: Why Automation Professionals Are Now Architects of Operational Trust
Jun 29, 2026
MaxWell
The Evolving Mandate: Why Automation Professionals Are Now Architects of Operational Trust
The role of the automation professional has shifted from a technical support function to a strategic pillar...
Read More
Industrial AI, Humanoid Robotics, Digital Transformation, Apparel Manufacturing
Jun 29, 2026
MaxWell
Jack Technology Partners with Siemens to Pioneer AI-Driven Apparel Manufacturing
Jack Technology is embarking on a comprehensive digital transformation by integrating Siemens’ Intelligence Center X and Designcenter software to...
Read More
Rethinking Quality: How Operational Alignment Drives Manufacturing Performance
Jun 29, 2026
MaxWell
Rethinking Quality: How Operational Alignment Drives Manufacturing Performance
Modern manufacturing thrives when quality management transcends the role of a reactive "gatekeeper" and evolves into the...
Read More
Perseus Named First Accredited Certification Body for ISASecure ACSSA Program
Jun 28, 2026
MaxWell
Perseus Named First Accredited Certification Body for ISASecure ACSSA Program
Perseus Information Security Consulting has achieved a major milestone, securing full A2LA accreditation to become...
Read More
Rockwell Automation Bolsters SecureOT Portfolio with Advanced Cyber Managed Services
Jun 28, 2026
MaxWell
Rockwell Automation Bolsters SecureOT Portfolio with Advanced Cyber Managed Services
Rockwell Automation has significantly expanded its SecureOT solution suite by introducing new cybersecurity assessment tools and managed services. These enhancements...
Read More
Emerson Enhances Rosemount 928 Wireless Monitor with Combustible Gas Detection
Jun 28, 2026
MaxWell
Emerson Enhances Rosemount 928 Wireless Monitor with Combustible Gas Detection
Emerson has significantly upgraded its Rosemount 928 Wireless Gas Monitor to include combustible gas detection capabilities, providing real-time %LEL monitoring across...
Read More
ABB Scales Non-Invasive Sensing Portfolio to Streamline Industrial Thermal Monitoring
Jun 28, 2026
MaxWell
ABB Scales Non-Invasive Sensing Portfolio to Streamline Industrial Thermal Monitoring
ABB is transforming how plant operators approach thermal data with the expansion of its NINVA non-invasive...
Read More