1KHW001381R0001 ABB Servo Controller UNIT E5TX Series
ABB

1KHW001381R0001 ABB Servo Controller UNIT E5TX Series

SKU: 1KHW001381R0001 E5TX
Categories : ABB
In Stock
  • Dimensions: 2 x 15.5 x 26.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 1KHW001381R0001, also cataloged as the E5TX Servo Controller UNIT, operates as a dedicated hardware component for closed-loop motion vector processing and encoder feedback execution within industrial motion control systems.

Hardware Identification and Architecture

  • Full Part Number: 1KHW001381R0001
  • Base Model Designation: E5TX
  • HS Code / Tariff Identifier: 8537101190
  • Manufacturing Location: Sweden

Electrical and Physical Ratings

Parameter Specification
Model 1KHW001381R0001
Brand ABB
Origin Sweden
Weight 1.2 kg
Shipping Dimensions 2 x 15.5 x 26.2 cm
Operating Temp 0 deg C to +55 deg C
Power Consumption 0.5-5 kW rating dependent
Input Voltage 3-phase 200-480 VAC
Line Frequency 50/60 Hz (+/-5%)
Continuous Current 5 A RMS
Peak Output Current 15 A
Analog Signal Interface +/-10 V
Differential Encoder Rate 1 MHz
Velocity Loop Bandwidth 1.2 kHz
Positioning Accuracy +/-1 encoder count
Storage Temp -40 deg C to +85 deg C
Operating Humidity 5-95% RH (non-condensing)

Deterministic Motion Networking and Bus Execution

The 1KHW001381R0001 unit interfaces via high-speed deterministic network protocols to process velocity loop commands with a 1.2 kHz response bandwidth. High-density I/O handling combined with differential encoder input hardware enables real-time physical positioning accurate to within a single encoder count. Firmware flash compatibility maintains sync with main PLC backplane processors across distributed motion axes.

Unit Supply Configuration

  • 1 x ABB 1KHW001381R0001 E5TX Servo Controller Unit
  • 1 x Factory Sealed Anti-Static Shield Enclosure

Hardware Installation Guidelines

Power Wiring Precautions

  • Verify complete power lock-out on 3-phase 200-480 VAC lines prior to terminal block engagement.
  • Maintain strict grounding of the drive frame chassis using dedicated low-impedance copper conductors.

Signal Cable Routing

  • Route differential encoder wiring inside grounded steel conduits separated from high-voltage AC lines.
  • Keep analog +/-10 V control signal runs below standard maximum lengths to reduce electromagnetic interference.

Technical Questions and Answers

  • What is the continuous current rating for the 1KHW001381R0001 drive unit?

    The continuous output current capacity is specified at 5 A RMS under nominal 3-phase AC operating conditions.

  • What signal standard does the encoder feedback interface utilize?

    The feedback interface accepts differential encoder signals supporting maximum input frequencies up to 1 MHz.

  • Can the unit handle transient overload conditions during axis acceleration?

    The drive supports peak output currents reaching up to 15 A for brief dynamics during high-torque acceleration phases.

  • Is the main power input compatible with 50 Hz and 60 Hz grid frequencies?

    Yes, the AC supply circuit accepts line frequencies of 50/60 Hz within an allowed tolerance of +/-5%.

  • What positioning resolution can be maintained by the control loop?

    Under calibrated encoder feedback conditions, the closed-loop accuracy reaches +/-1 physical encoder count.

  • Does the device support analog voltage command reference signals?

    Yes, an analog differential input interface rated at +/-10 V is provided for direct speed or torque control.

  • What thermal operating limits must be maintained in the control enclosure?

    Ambient cabinet temperatures must remain between 0 deg C and +55 deg C with non-condensing relative humidity.

  • How does backplane communication latency impact real-time motion control execution?

    The architecture relies on high-velocity bus execution to deliver microsecond-level velocity loop updates.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Aug 30, 2026
MaxWell
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Cabral Gold has identified a promising new mineralized strike at its Cuiú Cuiú project in northern Brazil, expanding...
Read More
Boliden Expands in Latin America With $1.3B Nexa Deal
Aug 30, 2026
MaxWell
Boliden Expands in Latin America With $1.3B Nexa Deal
Swedish mining group Boliden has agreed to acquire Votorantim’s 65% controlling stake in Nexa Resources...
Read More
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
Aug 29, 2026
Maxwell PLC Ltd
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
At the ACG Caving Conference 2026 in Ulaanbaatar, mining technology developer Sandvik formally introduced xCell...
Read More
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Aug 29, 2026
Maxwell PLC Ltd
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Mining giant Vale has formalized a long-term strategic alliance with industrial engineering group ABB to...
Read More
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Aug 29, 2026
Maxwell PLC Ltd
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Tanzania officially brought East Africa's largest hydroelectric facility online following the inauguration of the 2,115...
Read More
Schneider Electric Backs Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric Backs Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore a...
Read More
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore an...
Read More
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Aug 29, 2026
MaxWell
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Schneider Electric is calling on industrial companies to take a more disciplined approach to digital...
Read More
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
Aug 28, 2026
MaxWell
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
System integrator Holland-Controls has initiated a critical automation system modernization project across an active offshore oil and...
Read More
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Aug 28, 2026
MaxWell
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Operational delays in heavy industrial facilities frequently stem from fragmented documentation rather than actual mechanical...
Read More