3BHE021887R0101 UBCC717BE101 ABB VVP Board AC 800PEC
3BHE021887R0101 UBCC717BE101 ABB VVP Board AC 800PEC
ABB

3BHE021887R0101 UBCC717BE101 ABB VVP Board AC 800PEC

SKU: 3BHE021887R0101 UBCC717BE101
Categories : ABB
In Stock
  • Dimensions: 35 x 29 x 6 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 3BHE021887R0101 UBCC717BE101, also cataloged as the UBCC717BE101 VVP Board Coated, operates as a dedicated hardware component for pulse processing and interface management within AC 800PEC control systems.

Ordering Code Structure

  • UBCC717BE101: Specific hardware revision designation and PC board module function.
  • 3BHE021887R0101: Primary ABB part number identification code.
  • VVP Board Coated: Hardware configuration featuring conformal coating for environmental protection against atmospheric contaminants and moisture.

Physical & Technical Specifications

Parameter Specification
Model 3BHE021887R0101 UBCC717BE101
Brand ABB
Product Type PC Board (VVP-Board Coated)
System Platform AC 800PEC
Country of Origin Sweden
Tariff Code 8537101190
Weight 2.64 kg
Shipping Dimensions 35 x 29 x 6 cm
Coating Conformal Coated Board
Operating Temperature 0 to +55 deg C
Storage Temperature -40 to +70 deg C

Backplane Communication & Deterministic Processing

The module interfaces directly with the high-speed AC 800PEC backplane bus communication velocity. Internal circuitry handles high-speed pulse feedback processing and signal conditioning required for high-power semiconductor drive systems. Deterministic response times ensure synchronization across the internal bus architecture, while firmware flash compatibility ensures alignment with the host AC 800PEC controller version.

Order Fulfillment Details

  • 1x ABB 3BHE021887R0101 UBCC717BE101 VVP Board Coated
  • 1x Factory ESD protective packaging enclosure

Mechanical Installation & Wiring Protocols

Handling and ESD Safeguards

  • Maintain grounded wrist strap connection during handling to prevent electrostatic damage.
  • Keep the board inside conductive ESD packaging until immediate insertion into the rack frame.

Cabinet Mounting and Clearance

  • Mount horizontally within the designated subrack slot using guide rails.
  • Ensure a minimum vertical clearance of 50 mm above and below the rack for free air convection.
  • Secure retention screws with a torque limit of 0.8 Nm to ensure proper ground contact and mechanical stability.

Signal Shielding and Earth Grounding

  • Connect cable shields directly to the cabinet ground bar using low-impedance grounding clamps.
  • Separate high-voltage power conduits from low-voltage I/O and communication lines by at least 200 mm.

Technical Support FAQs

  • What is the significance of the conformal coating on this module?

    The coating shields electronic components from humidity, dust, and corrosive airborne contaminants present in industrial drive environments.

  • Is the UBCC717BE101 board hot-swappable during operation?

    No. Power to the AC 800PEC subrack must be completely de-energized before removing or installing the board.

  • How is chassis ground continuity established for the circuit board?

    Ground continuity relies on direct contact between the board metal frame, guide rails, and cabinet earth ground bar.

  • What is the proper procedure for storing a spare VVP board?

    Store the module inside its original sealed ESD shielding bag at temperatures between -40 deg C and +70 deg C.

  • Does this unit require a dedicated external power supply connection?

    Operating power is drawn directly through the backplane connection interface of the AC 800PEC subrack assembly.

  • Can the firmware on the board be upgraded independently?

    Firmware flash compatibility is synchronized automatically through the main controller loading routine upon system startup.

  • What cable type is required for external I/O terminals?

    Use twisted-pair shielded cables with a minimum copper cross-section of 0.5 mm2 (AWG 20) for noise suppression.

  • How do I verify physical seating after insertion into the rack?

    Verify that front panel retention screws line up properly and thread smoothly without forcing the connector pins.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Schneider Electric Backs Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric Backs Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore a...
Read More
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore an...
Read More
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Aug 29, 2026
MaxWell
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Schneider Electric is calling on industrial companies to take a more disciplined approach to digital...
Read More
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
Aug 28, 2026
MaxWell
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
System integrator Holland-Controls has initiated a critical automation system modernization project across an active offshore oil and...
Read More
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Aug 28, 2026
MaxWell
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Operational delays in heavy industrial facilities frequently stem from fragmented documentation rather than actual mechanical...
Read More
Baker Hughes Outlines Next-Generation Autonomous Well Construction Framework
Aug 27, 2026
MaxWell
Baker Hughes Outlines Next-Generation Autonomous Well Construction Framework
Energy services provider Baker Hughes is accelerating upstream digitalization by expanding its autonomous drilling architecture. Executive...
Read More
Emerson Enhances Guardian Digital Platform with Advanced Industrial AI Tools
Aug 27, 2026
MaxWell
Emerson Enhances Guardian Digital Platform with Advanced Industrial AI Tools
To streamline process operations, Emerson has integrated advanced enterprise artificial intelligence into its flagship Guardian digital platform....
Read More
Hazardous-Area Computing Systems Secure Offshore Oil and Gas Rigs Against Explosive Environments
Aug 27, 2026
MaxWell
Hazardous-Area Computing Systems Secure Offshore Oil and Gas Rigs Against Explosive Environments
Deepsea drilling and production platforms present one of the most demanding operational landscapes on earth....
Read More
Schneider Electric and Bilfinger Complete Autonomous Offshore Buoy Pilot in North Sea
Aug 26, 2026
MaxWell
Schneider Electric and Bilfinger Complete Autonomous Offshore Buoy Pilot in North Sea
Bilfinger and Schneider Electric have successfully completed a major offshore automation milestone with the deployment...
Read More
Emerson Expands Rosemount Wireless Gas Monitor for Advanced Hazard Detection
Aug 26, 2026
MaxWell
Emerson Expands Rosemount Wireless Gas Monitor for Advanced Hazard Detectio
Emerson has expanded the capabilities of its Rosemount 928 Wireless Gas Monitor, introducing combustible gas detection...
Read More