1MRK000173-BC ABB Binary Input Module System
1MRK000173-BC ABB Binary Input Module System
1MRK000173-BC ABB Binary Input Module System
ABB

1MRK000173-BC ABB Binary Input Module System

SKU: 1MRK000173-BC
Categories : ABB
In Stock
  • Dimensions: 23.3 x 16.6 x 2.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 1MRK000173-BC, also cataloged as the 1MRK000173-BC Binary Input Module, operates as a dedicated hardware component for high-speed discrete state sensing within control chassis subracks.

Assembly Structure & Identifier Mapping

  • Full Ordering Model: 1MRK000173-BC
  • Base Module Type: 1MRK000173-BC
  • Tariff Heading: 8537101190
  • Country of Origin: Sweden

Physical & Performance Data

Parameter Specification
Model 1MRK000173-BC
Brand ABB
Origin Sweden
Weight 0.54 kg
Shipping Dimensions 23.3 x 16.6 x 2.5 cm
Operating Temp -40 deg C to +70 deg C
Power Consumption Subrack Backplane Powered
Input Channels 16
Input Voltage Ranges 24 VDC (18-30 VDC)
Input Current 2-10 mA
Isolation Voltage 2.5 kV RMS
Response Time < 3 ms
Overvoltage Protection 300 VDC
Storage Temp -40 deg C to +85 deg C
Relative Humidity 5-95% (non-condensing)

Industrial Control Backplane Execution

The 1MRK000173-BC binary input module integrates into internal rack communications, maintaining high backplane bus communication velocity across high-density I/O arrays. Real-time channel scanning provides input detection with a response time below 3 ms. Integrated firmware flash compatibility ensures synchronized operational timing across system controllers while maintaining 2.5 kV RMS isolation from field logic circuits.

Package Inventory

  • 1 x ABB 1MRK000173-BC Binary Input Module
  • 1 x Electrostatic Discharge Protective Sleeve

Chassis Wiring & Mounting Directives

Module Insertion Procedure

  • De-energize subrack backplane power before inserting the module into the designated guide slot.
  • Secure upper and lower retention screws to establish continuous chassis grounding.

Field Signal Cabling

  • Run 24 VDC input wiring away from high-voltage AC cables to limit noise coupling.
  • Terminate shield ground wires at standard cabinet entry earth bars using brief ground leads.

Technical Questions and Answers

  • Does the 1MRK000173-BC support online hot-swapping under live rack power?

    Power down the rack slot before removing or installing the module to avoid transient backplane disturbances.

  • What is the nominal operating voltage range for field input channels?

    The input channels accept standard 24 VDC potential within an operational range of 18 VDC to 30 VDC.

  • What galvanic isolation rating protects internal controller logic from field surges?

    The channel isolation circuit withstands continuous voltage stress up to 2.5 kV RMS between field inputs and backplane logic.

  • What signal propagation speed is achieved by the input sensing circuit?

    The module processes field status changes with a total hardware response delay of less than 3 ms.

  • How does the module handle voltage spikes on input terminals?

    Internal protection clamp circuits safeguard each input channel against DC transient surges up to 300 VDC.

  • What current level does each channel draw when fully energized?

    Individual field input channels draw between 2 mA and 10 mA under 24 VDC nominal operating conditions.

  • Are external cooling fans mandatory during low-temperature operation?

    The card functions across ambient environments from -40 deg C to +70 deg C using passive convection inside the chassis.

  • How does firmware synchronization impact backplane module replacement?

    Firmware flash compatibility allows automatic version matching when connected to the primary system controller.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More
China Intelligent Technology Empowers Global South
Oct 11, 2026
Maxwell
China Intelligent Technology Empowers Global South Mining Development
China's mining intelligence technologies are gaining international recognition as countries across the Global South seek...
Read More
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
Oct 11, 2026
Maxwell
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
The city of Luliang in Shanxi Province has emerged as a showcase for the transformation...
Read More
2026 Hefei International New Energy Vehicle Exhibi
Oct 11, 2026
Maxwell
2026 Hefei International New Energy Vehicle Exhibition Opens September 30
The 2026 Hefei International New Energy Vehicle Exhibition opened on September 30 at the Hefei...
Read More