1794-AENT Allen-Bradley Flex I/O Communication Adapter
1794-AENT Allen-Bradley Flex I/O Communication Adapter
1794-AENT Allen-Bradley Flex I/O Communication Adapter
Allen-Bradley

1794-AENT Allen-Bradley Flex I/O Communication Adapter

SKU: 1794-AENT
Categories : All Products
In Stock
  • Dimensions: 9.4 x 8.8 x 7 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-speed Ethernet/IP data exchange in distributed control systems, the Allen-Bradley 1794-AENT (1794-AENT Flex I/O communication adapter) provides direct physical/electrical execution.

Device Summary Matrix

  • Base Model: 1794-AENT

  • Function: Ethernet/IP Communication Adapter

  • Network Interface: 10/100 Mbps RJ45

  • I/O Capacity: Up to 8 modules

  • Power Requirement: 24 VDC Nominal

Hardware Specifications

Parameter Specification
Model 1794-AENT
Brand Allen-Bradley
Origin USA
Weight 0.18 kg
Shipping Dimensions 9.4 x 8.8 x 7 cm
Operating Temp Standard Industrial Range
Power Consumption 7.3 W max @ 19.2 VDC
I/O Capacity 8 Modules

Deterministic Network Integration

The 1794-AENT adapter utilizes EtherNet/IP deterministic networks to facilitate real-time data transfer between field I/O and controller platforms. It supports high-speed backplane bus communication, ensuring that I/O density scaling remains predictable across distributed nodes. The hardware supports firmware flash compatibility, allowing for updates that maintain alignment with evolving network protocols and communication logic within the EtherNet/IP architecture.

Ordering Info

  • 1 unit 1794-AENT Communication Adapter

  • 1 technical documentation sheet

Field Installation Guidelines

  • Mounting: Snap the adapter onto a standard 35 mm DIN rail. Ensure the mechanical locking mechanism is fully engaged for vibration resistance.

  • Grounding: Terminate the chassis ground connection to a common potential earth rail to minimize electromagnetic interference.

  • Cabling: Utilize shielded Category 5 Ethernet cabling. Ensure the RJ45 interface is free of debris and physical stress that could cause connection latency.

  • Power: Connect to a regulated 24 VDC power source. Ensure the voltage remains within the 19.2-31.2 VDC operational window to avoid intermittent resets.

Frequently Asked Questions

  • Does the 1794-AENT support hot-swapping of I/O modules?

    Yes, the adapter supports the hot-swapping of Flex I/O modules while the adapter is powered, provided the backplane power is managed correctly.

  • What is the maximum number of modules supported?

    The 1794-AENT adapter supports a maximum of 8 Flex I/O modules on a single rack.

  • Is the Ethernet port auto-negotiating?

    Yes, the RJ45 port supports auto-negotiation for 10/100 Mbps communication speeds.

  • What happens if the input voltage drops below 19.2 VDC?

    The module may experience power cycles or loss of communication with the controller if the input voltage falls below the specified threshold.

  • Can this adapter be used in a redundant network configuration?

    The 1794-AENT is designed for standard EtherNet/IP topologies. For redundant networks, specialized hardware or managed switch configurations are required.

  • How is the module address assigned?

    Network addressing is typically configured via the Logix 5000 software or via a hardware rotary switch interface depending on the specific revision.

  • Does the module require an external fuse?

    While the adapter has internal protection, adhering to local electrical codes regarding auxiliary fusing for the 24 VDC supply is recommended.

  • Is the adapter isolated from the backplane?

    The adapter provides basic insulation with a 50 V continuous isolation voltage rating between the field bus and internal circuitry.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
Sep 01, 2026
MaxWell
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
OMRON Robotics is showcasing its latest mobile industrial automation advancements at Automate 2026 in Chicago,...
Read More
Frontieras Taps Yokogawa for $850M West Virginia Processing Plant Automation
Sep 01, 2026
MaxWell
Frontieras Taps Yokogawa for $850M West Virginia Processing Plant Automation
Frontieras North America has selected Yokogawa Corporation of America as the Main Automation Contractor (MAC)...
Read More
Yokogawa Secures MAC Contract for $13B Commonwealth LNG Facility
Sep 01, 2026
MaxWell
Yokogawa Secures MAC Contract for $13B Commonwealth LNG Facility
Yokogawa Corporation of America has been selected as the Main Automation Contractor (MAC) for the...
Read More
Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Aug 31, 2026
MaxWell
Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Energy technology provider Baker Hughes posted second-quarter revenues of $6.74 billion, navigating strategic divestitures while...
Read More
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Aug 31, 2026
MaxWell
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Mitsubishi Electric US, Inc. (MEUS) has initiated a structural consolidation of its United States enterprise...
Read More
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Development
Aug 31, 2026
MaxWell
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Develop...
Troilus Mining has secured non-binding support for up to $132 million in export credit support from Finland's...
Read More
First Mining Reaches Development Deal With Ontario First Nations
Aug 30, 2026
MaxWell
First Mining Reaches Development Deal With Ontario First Nations
Cat Lake First Nation (CLFN), Lac Seul First Nation (LSFN) and First Mining Gold have...
Read More
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Aug 30, 2026
MaxWell
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Cabral Gold has identified a promising new mineralized strike at its Cuiú Cuiú project in northern Brazil, expanding...
Read More
Boliden Expands in Latin America With $1.3B Nexa Deal
Aug 30, 2026
MaxWell
Boliden Expands in Latin America With $1.3B Nexa Deal
Swedish mining group Boliden has agreed to acquire Votorantim’s 65% controlling stake in Nexa Resources...
Read More
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
Aug 29, 2026
Maxwell PLC Ltd
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
At the ACG Caving Conference 2026 in Ulaanbaatar, mining technology developer Sandvik formally introduced xCell...
Read More