Yokogawa SEC402-51 ESB Bus Coupler Module S1 Interface
Yokogawa SEC402-51 ESB Bus Coupler Module S1 Interface
Yokogawa SEC402-51 ESB Bus Coupler Module S1 Interface
Yokogawa SEC402-51 ESB Bus Coupler Module S1 Interface
Yokogawa SEC402-51 ESB Bus Coupler Module S1 Interface
Yokogawa

Yokogawa SEC402-51 ESB Bus Coupler Module S1 Interface

SKU: SEC402-51
Categories : All Products
In Stock
  • Dimensions: 130 mm x 130 mm x 30 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Yokogawa SEC402-51 serves as a high-speed communication backbone for the CENTUM VP distributed control system. This ESB Bus Coupler Module acts as the master interface between the Field Control Unit (FCU) and various localized Node Units. Its primary function is to manage the flow of I/O data across the ESB bus, providing a 2-port connection that allows for systematic expansion of the control architecture. By facilitating real-time synchronization between the main controller and the I/O modules, the SEC402-51 ensures that process variables are updated with the high-speed precision required for complex automation sequences.

Architecture Performance and Hardware Details

This module is designed for dense cabinet installations where high throughput and low latency are critical for system performance.

  • Interface Category: ESB Bus Master Function (2-Port)

  • Data Throughput: 128 Mbps for I/O module transmission

  • Node Expansion Capacity: Supports up to 9 units on the upper branch and 9 units on the lower branch

  • Connectivity Reach: 10 meters maximum for each port (Upper/Lower cables)

  • Power Demand: 0.5 A current consumption

  • Chassis Net Weight: 0.24 kg (Approx. 240g)

  • Physical Dimensions: 130 mm x 130 mm x 30 mm

  • Environmental Protection: Available with ISA Standard G3 conformal coating for corrosive environments

  • Redundancy Capability: Supports dual-redundant configurations for high-availability systems

Strategic Industrial Deployment

The SEC402-51 is a foundational component for centralized control rooms and satellite instrument houses.

  • Petrochemical and Refining: Coordinating massive amounts of I/O data from distillation and cracking units back to the main FCU.

  • Redundant Control Backbones: Utilizing dual-module setups to eliminate single points of failure in safety-critical process loops.

  • Localized Node Integration: Connecting multiple I/O nests within a single cabinet or across adjacent cabinets within the 10-meter cable limit.

  • Harsh Industrial Conditions: Operating reliably in environments with atmospheric contaminants when specified with the G3 option.

FAQ

Q: What is the primary function of the SEC402-51 within the CENTUM VP system?

A: It acts as the master interface module, physically and logically connecting the Field Control Unit to the ESB bus nodes to allow for the expansion of I/O module capacity.

Q: Can I exceed the 10-meter transmission distance?

A: The electrical ESB bus is limited to 10 meters per port. If your nodes are located further away, an optical ESB bus repeater system (such as the ANT401/ANT502) must be used instead.

Q: What does the suffix -G3 signify for this coupler?

A: The -G3 suffix indicates that the module has been treated with a conformal coating to meet ISA Standard G3, protecting the electronic components from corrosive gases like Hydrogen Sulfide.

Q: Is the SEC402-51 compatible with redundant power supplies?

A: Yes, as a standard component of the Yokogawa FCU, it operates within the duplexed environment of the control station, drawing power from the redundant system bus.

Q: How many total node units can a single SEC402-51 manage?

A: It can manage a maximum of 18 units in total, split evenly with up to 9 units on the upper ESB bus port and up to 9 units on the lower ESB bus port.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More