Yokogawa ALF111-S50 FOUNDATION Fieldbus Communication Module 4-Port
Yokogawa ALF111-S50 FOUNDATION Fieldbus Communication Module 4-Port
Yokogawa ALF111-S50 FOUNDATION Fieldbus Communication Module 4-Port
Yokogawa

Yokogawa ALF111-S50 FOUNDATION Fieldbus Communication Module 4-Port

SKU: ALF111-S50
Categories : All Products
In Stock
  • Dimensions: 130 mm x 45 mm x 130 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Yokogawa ALF111-S50 is a high-performance communication interface designed for the CENTUM VP and CS 3000 integrated control systems. This 4-port module serves as a bridge between the digital control architecture and field-level instrumentation. It facilitates seamless data exchange using the FOUNDATION Fieldbus H1 protocol, supporting low-speed voltage mode transmission. Engineered for stability in demanding process environments, the ALF111-S50 enables the integration of smart field devices into a unified automation network, ensuring high-speed data updates and precise process monitoring.

Vital Hardware Parameters

The following specifications define the electrical and physical footprint of the ALF111-S50 communication unit.

  • Communication Standard: FOUNDATION Fieldbus H1

  • Data Transfer Rate: 31.25 kbps

  • Port Configuration: 4 independent segments

  • Maximum Devices per Segment: 32 units

  • I/O Capacity per Segment: 48 points total

  • High-Speed Response Points: 6 points per segment

  • Current Intake: 0.5 A or less

  • Dielectric Strength: 1500 V AC for 60 seconds

  • Bus Support Functions: Link Active Scheduler (LAS) and Clock Master

  • Redundancy: Supports paired dual-redundant configuration

  • Compatible Nodes: ANB10, ANB11, AFV30, AFV40, A2FV50, A2FV70

  • Dimensions: Approximately 130 mm x 45 mm x 130 mm (Standard Yokogawa I/O format)

  • Weight: 0.40 kg

Strategic Industrial Deployment

The ALF111-S50 is a critical component in complex automation infrastructures where data integrity and device management are paramount.

  • Petrochemical and Refining: Utilized to manage extensive networks of pressure transmitters and control valves across large-scale distillation and cracking units.

  • Redundant Control Architectures: Deployed in safety-critical loops where the module's dual-redundancy capability prevents system downtime during a hardware failure.

  • Asset Management Integration: Provides the necessary bandwidth for PRM (Plant Resource Manager) software to perform remote diagnostics and predictive maintenance on field assets.

  • Power Generation: Facilitates the coordination of sensors and actuators in steam and gas turbine control systems to maintain operational efficiency.

FAQ

Q: How does the ALF111-S50 handle network management duties?

A: The module functions as a Link Active Scheduler (LAS). This means it controls the timing of all communications on the Fieldbus segment, ensuring that scheduled data is transmitted at the correct intervals and managing unscheduled traffic for device configuration.

Q: Is it possible to replace a faulty ALF111-S50 without shutting down the process?

A: If the system is configured for dual-redundancy, you can replace the standby module while the active module continues to manage the fieldbus traffic. The new module will automatically synchronize with the active unit once installed.

Q: What type of wiring connection is required for the Fieldbus segments?

A: The module utilizes pressure clamp terminals on a removable terminal block. This design simplifies the wiring process and allows for the pre-wiring of the cabinet before the actual module is slotted into the node unit.

Q: Does this module provide power to the field devices?

A: No, the ALF111-S50 does not provide bus power directly. A separate Fieldbus Power Supply and Power Conditioner are required to energize the segment and the connected field instruments.

Q: Can this module be installed in explosive atmospheres?

A: No, the S50 suffix denotes the standard type without explosion protection. For hazardous area requirements, a different sub-model with appropriate intrinsic safety or flameproof certifications must be selected.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More