UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
ABB

UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate

SKU: UF C911 B104 3BHE037864R0104
Categories : ABB
In Stock
  • Dimensions: 45 x 15.3 x 10.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB UF C911 B104 3BHE037864R0104 serves as the primary UF C911 B104 Circulation Plate utilized to execute high-speed frequency input/output processing and DC power distribution across AC 800PEC platforms.

Variant Mapping & Designation

  • Base Assembly Model: UF C911 B104
  • Part Number: 3BHE037864R0104
  • Module Category: Circulation Plate / Frequency I/O Board
  • System Compatibility: ABB AC 800PEC High-Performance Control System

Physical & Electrical Operating Parameters

Parameter Specification
Model UF C911 B104 3BHE037864R0104
Brand ABB
Origin Sweden
Weight 2.75 kg
Shipping Dimensions 45.0 x 15.3 x 10.5 cm
Operating Temp -20 deg C to +55 deg C (-4 deg F to +131 deg F)
Power Consumption Not specified
AC Input Voltage 100 VAC to 240 VAC +-10 %
DC Output Voltage 24 VDC
Output Current 4 A continuous
Conversion Efficiency > 85 % at full load
Electrical Isolation 1500 VAC
Storage Temp -40 deg C to +85 deg C
Relative Humidity 5 % to 95 % RH non-condensing
Tariff Code 8537101190

Deterministic Bus Interface & Firmware Synchronization

The circulation plate integrates frequency I/O processing loops with the controller mainboard via direct high-speed interconnects. Backplane bus communication velocity guarantees low-latency deterministic signal routing between field frequency inputs and processor memory registers. Built-in system logic ensures firmware flash compatibility across AC 800PEC hardware revisions while maintaining channel scaling integrity.

Package Contents

  • 1 x ABB UF C911 B104 3BHE037864R0104 Circulation Plate
  • Standard anti-static ESD packaging shield

Cabinet Mounting & Field Installation Rules

  • ESD Safety Precautions
    • Ground personnel via wrist straps before contacting exposed board traces or input connector blocks.
  • Structural Alignment
    • Secure the card firmly into the rack guide slots using hand tools to ensure proper bus connector mating without apply uneven torsional stress.
  • Power Wiring Standards
    • Ensure incoming 100-240 VAC main power lines are de-energized prior to connecting field supply leads to the primary terminal block.
  • Cable Shielding
    • Earth all frequency I/O cable shields at single-point busbars to prevent electrical switching noise from degrading frequency signal accuracy.

Engineering & Operations Technical FAQ

  • What is the continuous output current rating of the integrated DC power circuit?

    The internal power circuit delivers a continuous 24 VDC output at up to 4 A.

  • What input AC voltage range does the power conversion section accept?

    The module accepts an AC input range from 100 VAC to 240 VAC +-10 %.

  • What is the electrical isolation rating between field power and internal logic?

    Galvanic isolation between circuit interfaces is rated at 1500 VAC.

  • What thermal thresholds apply to active field operations?

    Operating temperature must remain between -20 deg C and +55 deg C (-4 deg F to +131 deg F).

  • What efficiency level does the power conversion subsystem achieve?

    The power conversion stage achieves greater than 85 % efficiency under full electrical load conditions.

  • Can the board be inserted into the rack while the backplane power is active?

    Hot-swapping must follow strict AC 800PEC system guidelines; isolate primary AC mains before removal or insertion.

  • How should frequency signal lines be routed inside the panel enclosure?

    Route frequency I/O conductors through separate wire ducts away from high-current AC motor leads to prevent crosstalk.

  • What are the physical transport and shipping clearance dimensions?

    The shipping footprint dimensions measure 45.0 cm in length, 15.3 cm in width, and 10.5 cm in height.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Sep 03, 2026
Shopify API
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Few engineering achievements capture the imagination quite like Shell Prelude. Moored approximately 475 kilometers off...
Read More
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
Sep 03, 2026
Shopify API
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
In the high-stakes world of offshore and onshore gas production, few projects carry the geopolitical...
Read More
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
Sep 03, 2026
Shopify API
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
The industrial automation landscape is shifting rapidly as manufacturers demand greater flexibility from their control...
Read More
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Sep 03, 2026
MaxWell
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Critical Manufacturing is preparing to demonstrate how manufacturers can use MES, industrial connectivity, manufacturing analytics and...
Read More
Automation Can Create a Hidden Single-Point-of-Failure Risk
Sep 03, 2026
MaxWell
Automation Can Create a Hidden Single-Point-of-Failure Risk
As factories become more automated, the biggest operational risk may not always be a failed...
Read More
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
Sep 02, 2026
MaxWell
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
The cybersecurity of water and wastewater infrastructure is drawing renewed attention across the industrial automation...
Read More
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Sep 02, 2026
MaxWell
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Manufacturers have spent years treating automation as a straightforward answer to labor shortages, rising costs...
Read More
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Sep 02, 2026
MaxWell
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Renesas Electronics has officially opened its Physical AI & Robotics Lab in Beijing, marking another significant...
Read More
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
Sep 01, 2026
MaxWell
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
OMRON Robotics is showcasing its latest mobile industrial automation advancements at Automate 2026 in Chicago,...
Read More