Pulse Encoder Interface NTAC-02 ABB 58967441E Drive Accessory
Pulse Encoder Interface NTAC-02 ABB 58967441E Drive Accessory
Pulse Encoder Interface NTAC-02 ABB 58967441E Drive Accessory
ABB

Pulse Encoder Interface NTAC-02 ABB 58967441E Drive Accessory

SKU: NTAC-02
Categories : ABB
In Stock
  • Dimensions: 4.5cm x 10.5cm x 7.5cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The NTAC-02, identified by part number 58967441E, is a specialized pulse encoder interface module primarily utilized within the ABB ACS800 drive family and AC 800M control environments. This interface acts as the vital link between a rotating motor's encoder and the frequency converter, enabling high-precision speed and position feedback. By providing a clean, isolated signal path for incremental encoder data, the NTAC-02 allows the drive to perform advanced motor control functions, such as flux vector control and precise torque regulation. Its design focuses on eliminating signal noise and ensuring that the controller receives accurate real-time data for closed-loop operations.


Physical Architecture and Technical Attributes

  • Model Designation: NTAC-02

  • Engineering Part Number: 58967441E

  • Input Capability: Supports Incremental Pulse Encoders

  • System Compatibility: ACS800 Drives / AC 800M Controllers

  • Power Consumption: Low-power logic consumption directly from the drive/bus

  • Net Weight: 0.22 kg

  • Body Dimensions: 4.5cm x 10.5cm x 7.5cm

  • Operational Temperature Range: -20°C to +60°C

  • Ingress Protection: IP20

  • Country of Manufacture: Sweden

  • HS Code: 8537101190

Industrial Utilization Scenarios

The NTAC-02 interface is a critical component in any automated system where motor feedback is required for safety or process accuracy. Major applications include:

  • Precision Lifting: Integrated into hoist and crane control systems to ensure exact positioning and prevent load drifting through constant speed feedback.

  • Conveyor Synchronization: Used in large-scale logistics and bottling plants to match the speeds of multiple conveyor belts for seamless material transfer.

  • Extrusion Processes: Providing feedback for plastic and metal extruders where consistent motor speed is required to maintain product thickness and quality.

  • Winder/Unwinder Applications: Essential for paper, film, and textile industries to maintain constant web tension by monitoring motor rotations accurately.

  • Testing Rigs: Employed in dynamometers and automotive test benches where high-resolution speed data is necessary for performance analysis.

FAQ

Q: Can the NTAC-02 be used with any brand of pulse encoder?

A: The NTAC-02 is compatible with most standard incremental encoders that match its voltage and signal requirements. However, it is specifically designed to interface directly with ABB ACS800 series drive slots.


Q: What is the primary benefit of adding this interface to an ACS800 drive?

A: It enables "Closed Loop" control. Without this module, the drive operates in open loop (estimating speed); with it, the drive knows the exact motor position, drastically improving torque response and speed accuracy.

Q: Does the NTAC-02 require an external power source?

A: Typically, the module receives its necessary power through the drive's internal bus connection, though the encoder itself may require an external power supply depending on its specific voltage rating (e.g., 15V or 24V).

Q: How do I handle the shield of the encoder cable when connecting to the NTAC-02?

A: To prevent electromagnetic interference, the cable shield should be grounded according to ABB’s EMC guidelines, usually at the drive end using the provided grounding clamps to ensure signal integrity.

Q: Is the NTAC-02 hot-swappable?

A: No, it is highly recommended to power down the drive or controller before installing or removing the NTAC-02 to prevent electrical damage to the interface circuitry or the main control board.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Nextek Industrial Internet Platform Empowers SME Digital Transformation
Oct 22, 2026
Maxwell
Nextek Industrial Internet Platform Empowers SME Digital Transformation
The Nextek Industrial Internet Platform has emerged as a transformative force in China's manufacturing sector,...
Read More
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
Oct 22, 2026
Maxwell
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
The 26th China International Industry Fair (CIIF), scheduled for September 23-27, 2026, in Shanghai, promises...
Read More
China Industrial Robot Installations Reach Record 354000 Units in 2025
Oct 22, 2026
Maxwell
China Industrial Robot Installations Reach Record 354000 Units in 2025
China's dominance in the global industrial robotics market reached new heights in 2025, with the...
Read More
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More