KFD2-STC4-Ex2 Pepperl+Fuchs Smart Transmitter Power Supply K-System
KFD2-STC4-Ex2 Pepperl+Fuchs Smart Transmitter Power Supply K-System
KFD2-STC4-Ex2 Pepperl+Fuchs Smart Transmitter Power Supply K-System
Pepperl+Fuchs

KFD2-STC4-Ex2 Pepperl+Fuchs Smart Transmitter Power Supply K-System

SKU: KFD2..STC4..EX2
Categories : All Products
In Stock
  • Dimensions: 20 mm x 119 mm x 115 mm
  • Country of origin: Germany
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Pepperl+Fuchs KFD2-STC4-Ex2, also cataloged as the KFD2-STC4-Ex2 Smart Transmitter Power Supply, operates as a dedicated hardware component for galvanic isolation and intrinsically safe power supply to 2-wire SMART transmitters within hazardous area field networks.

Technical Performance Matrix

Parameter Specification
Model KFD2-STC4-Ex2
Brand Pepperl+Fuchs
Origin Germany
Weight Approx. 150 g
Shipping Dimensions 20 mm x 119 mm x 115 mm
Operating Temp -20 deg C to +60 deg C (-4 deg F to +140 deg F)
Power Consumption Max. 1.8 W
Supply Voltage 19 VDC to 30 VDC via Power Rail or terminals 14+, 15-
Number of Channels 2 channels (isolated)
Field Signal Input 2-wire SMART transmitters (4-20 mA)
Control Side Output 4-20 mA (active or passive output depending on terminal configuration)
Galvanic Isolation Safe isolation according to EN 60079-11, voltage peak 375 V

Intrinsic Safety and Isolation Parameters

The module incorporates certified intrinsically safe (Ex i) barriers designed to limit electrical energy delivered to hazardous location field devices. Galvanic isolation prevents ground loops and voltage spikes between the hazardous field circuits, power supply rail, and non-hazardous control system I/O. The internal current-limiting components maintain safety limits under fault conditions up to Ex ia IIC standards, preventing spark ignition in flammable gas or dust atmospheres.

Delivery Specifications

  • Delivery time: 3-5 days when payment finish
  • Fast dispatch via DHL, FEDEX, or UPS international freight
  • Dispatched in heavy-duty anti-static industrial packaging with impact-resistant padding

Site Mounting and Electrical Wiring

DIN-Rail Assembly

  • Mount vertically onto standard 35 mm DIN mounting rail (EN 60079-15) or integrate via Power Rail system.
  • Maintain a minimum clear spacing of 50 mm above and below the module for natural thermal convection.

Field Wiring & Earthing

  • Separate hazardous (Ex i) blue terminals from non-hazardous control terminals by at least 50 mm space distance or via partition plates.
  • Connect field transmitter wiring using twisted-shielded cable pairs. Terminate cable shields to dedicated grounding points at the control cabinet entry ground bar.

Ordering Information

  • Primary Order Reference: KFD2-STC4-Ex2
  • Package Contents: 1x KFD2-STC4-Ex2 isolated transmitter power supply module, 1x terminal plug set, 1x quick setup instruction sheet.
  • Optional Accessories: Power Rail UPR-03, Power Feed Module KFD2-EB2.

Technical Query Resolution

Q: Does the KFD2-STC4-Ex2 support bi-directional HART signal communication?

A: Yes, the unit transmits HART communication signals bidirectionally between the 4-20 mA SMART field transmitters and the control system terminals.

Q: What is the maximum voltage peak rating for the galvanic isolation barrier?

A: The safe galvanic isolation between field circuits and control/power circuits is rated for a peak voltage test value of 375 V according to EN 60079-11.

Q: Can the unit be powered directly from the standard terminal blocks instead of the Power Rail?

A: Yes, power can be supplied either via the Power Rail bus system or directly using screw/spring terminals 14+ and 15-.

Q: How does the channel density affect power distribution across adjacent modules?

A: The module dissipates a maximum of 1.8 W. When installing multiple units adjacently without spacing, verify total power dissipation within the enclosure to remain under the max operating limit of +60 deg C.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Nov 17, 2026
Maxwell
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Siemens is deepening its roots in one of China's most important manufacturing hubs. On November...
Read More
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Nov 16, 2026
Maxwell
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Apple has entered the humanoid robotics race, albeit in characteristically understated fashion. On November 4,...
Read More