IS200TPROH1B General Electric Mark Vie Protective Termination Board
IS200TPROH1B General Electric Mark Vie Protective Termination Board
IS200TPROH1B General Electric Mark Vie Protective Termination Board
General Electric

IS200TPROH1B General Electric Mark Vie Protective Termination Board

SKU: IS200TPROH1B
Categories : All Products
In Stock
  • Dimensions: 33 × 17.7 × 5 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The General Electric IS200TPROH1B is a protective termination card used in Speedtronic Mark VI / Mark VIe turbine protection cabinets. It provides field termination and signal conditioning for protection-related circuits, helping route trip and monitoring signals between plant wiring and the control system interface. The design focuses on maintaining signal integrity and electrical robustness for safety functions, particularly in vibration-prone turbine environments where secure terminations and noise control are essential.

In a typical installation, the board serves as a termination and protection interface layer rather than a logic solver. It is selected to match the system’s protection wiring layout and connector scheme, supporting maintainable wiring practices and consistent cabinet servicing.

Hardware Parameters

Item Specification
Model / Part number IS200TPROH1B
Module category Protective Termination Card
Product family Mark VIe
Primary function Termination and conditioning of turbine protection/trip-related signals
Field wiring Dual terminal blocks with high-density screw terminals (48 points total stated)
Isolation / conditioning On-board transformers for signal isolation (as described)
Surge protection MOV devices for transient suppression (as described)
EMI control Filtering components on connector interfaces to improve noise immunity (design dependent)
System interfaces Multiple board-edge connectors for cabinet harnessing (connector naming varies by build)
Condition Brand New
Lead time In Stock
Weight 0.9 kg
Dimensions (listing) 33 × 17.7 × 5 cm
Country of origin (listing) USA
HS code (listing) 8537101190
System category DCS / turbine protection
  • Commissioning and maintenance notes

    • Verify terminal ID mapping against the site wiring schedule before disconnecting conductors

    • Apply ESD controls during handling and inspect terminals for proper torque and conductor seating

    • Trip/protection circuits are safety-critical; functional checks should follow plant procedures after replacement

Industrial Applications

  • Gas and steam turbine protection cabinets using Speedtronic Mark VIe termination hardware

  • Trip circuit marshalling and protection signal interfacing for shutdown and permissive logic paths

  • Replacement spare for installed-base turbine protection systems requiring original termination layout

  • Power plant maintenance programs focused on reducing nuisance trips through improved termination integrity and surge/noise protection

 

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Nextek Industrial Internet Platform Empowers SME Digital Transformation
Oct 22, 2026
Maxwell
Nextek Industrial Internet Platform Empowers SME Digital Transformation
The Nextek Industrial Internet Platform has emerged as a transformative force in China's manufacturing sector,...
Read More
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
Oct 22, 2026
Maxwell
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
The 26th China International Industry Fair (CIIF), scheduled for September 23-27, 2026, in Shanghai, promises...
Read More
China Industrial Robot Installations Reach Record 354000 Units in 2025
Oct 22, 2026
Maxwell
China Industrial Robot Installations Reach Record 354000 Units in 2025
China's dominance in the global industrial robotics market reached new heights in 2025, with the...
Read More
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More