IEPRD01 ABB Infi 90 Series DC Power Supply Module
ABB

IEPRD01 ABB Infi 90 Series DC Power Supply Module

SKU: IEPRD01
Categories : ABB
In Stock
  • Dimensions: 7.6 x 20.3 x 17.8 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB IEPRD01 serves as the primary IEPRD01 DC Power Supply Module utilized to execute regulated voltage distribution across Infi 90 platforms. Configured to convert incoming AC line voltages into a stable direct current output, this hardware unit energizes sub-rack circuit boards, local processors, and peripheral transceivers connected to the shared assembly backplane.

Hardware Parametrics

Parameter Specification
Model IEPRD01
Brand ABB
Origin Sweden
Weight 1.0 kg
Shipping Dimensions 7.6 cm x 20.3 cm x 17.8 cm
Operating Temp 0 deg C to +55 deg C
Power Consumption 90 W nominal output capacity
AC Input Rating 115/230 VAC ±10 % manual/auto-select configuration
DC Output Rating +24 VDC at 3.75 A
In-rush Current 25 A maximum at 230 VAC (Cold start conditions)
Ripple and Noise Less than 100 mV peak-to-peak
System Efficiency Greater than or equal to 85% at 230 VAC load
Relative Humidity 5% to 95% RH, non-condensing

Power Supply Performance and Backplane Compatibility

The internal hardware topology of the IEPRD01 supply is synchronized to balance systemic electrical loads, keeping background ripple and noise below the 100 mV threshold. This suppression capability stops power-rail high-frequency switching transients from altering the backplane bus communication velocity metrics or generating bit errors in adjacent logic gates. Onboard component thermal profiles are tuned for adjacent module density scaling constraints, ensuring that the continuous 3.75 A current output does not induce over-temperature diagnostic trips within surrounding processor chassis configurations.

Technical Circuit Queries

Q: What are the consequences of exceeding the 25 A in-rush current threshold during a cold start?

A: In-rush currents peaking above 25 A at 230 VAC can overstress the input thermistor network or prematurely trip upstream distribution breakers. Ensure that external upstream line protection matches standard inductive curve responses to prevent nuisance trips during initial sub-rack charging cycles.

Q: Can this power supply module function in a parallel or redundant configuration without external auctioneering diodes?

A: No, standard IEPRD01 circuit paths do not contain internal active current-sharing networks. Paralleling outputs directly without an external diodic auctioneering block can result in load imbalance, unequal thermal distribution, and damage to the lower-potential module.

Q: How does input voltage deviation affect the module's rated 85% efficiency performance?

A: Drops in the input line below the standard VAC ±10 % tolerance force the internal switching transistors to work under increased duty cycles. This alteration boosts internal thermal dissipation, which degrades overall system efficiency below the 85% benchmark and accelerates component aging.

Mechanical Installation and Power Configuration Protocol

Verify that the local sub-rack guide rails are free from debris prior to inserting the 1.0 kg power supply module. Ensure the source line select parameters match the local grid supply (115 VAC or 230 VAC) before sliding the assembly home. Secure all rear terminal retention screws to establish complete physical contact, which prevents terminal heating from high-impedance joints. Maintain a minimum clear boundary space above and below the rack assembly to allow ambient air movement to keep operational temperatures within the 0 deg C to +55 deg C envelope.

Ordering Info

  • 1 x ABB IEPRD01 90 Watt Power Supply Module

  • 2 x Rear Connector Retention Bracket Clips

  • 1 x Component Calibration Data Slip

Shipping and Transit Specifications

Delivery time: 3-5 days when payment finish. Dispatched via global priority courier services including DHL/FEDEX/UPS. Each item is enclosed within specialized anti-static industrial packaging boundaries and surrounded by customized shock-absorbent composite inserts to prevent component displacement or chassis misalignment during international transit.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More
China Intelligent Technology Empowers Global South
Oct 11, 2026
Maxwell
China Intelligent Technology Empowers Global South Mining Development
China's mining intelligence technologies are gaining international recognition as countries across the Global South seek...
Read More
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
Oct 11, 2026
Maxwell
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
The city of Luliang in Shanxi Province has emerged as a showcase for the transformation...
Read More