DS200SLCCG4A General Electric DS200SLCCG4AFG Mark V Communication Board
DS200SLCCG4A General Electric DS200SLCCG4AFG Mark V Communication Board
DS200SLCCG4A General Electric DS200SLCCG4AFG Mark V Communication Board
General Electric

DS200SLCCG4A General Electric DS200SLCCG4AFG Mark V Communication Board

SKU: DS200SLCCG4AFG
Categories : All Products
In Stock
  • Dimensions: 18 x 18 x 2 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The DS200SLCCG4AFG is an interface communication card used in GE Mark V turbine control platforms. Installed as part of the control rack electronics, it supports internal data exchange and interface signaling between Mark V control assemblies that must operate with stable timing and high reliability. The card is applied in turbine and generator control environments where consistent backplane integration and dependable board-level communications are required for system operation and diagnostics.

This module is intended for Mark V hardware architectures and is commonly used as a replacement or spare communication/interface PCB to restore original rack functionality when a legacy card fails or shows intermittent communication issues.

Key Technical Characteristics

Parameter Typical Value
Product family Mark V
Module type Interface communication card
Board power Backplane supplied +5 VDC
Power consumption < 5 W (typical)
Operating temperature -40°C to +70°C
Storage temperature -40°C to +85°C (typical for industrial PCBs)
Relative humidity 5–95% non-condensing
Form factor Rack/backplane plug-in printed circuit board
Approx. weight ~0.24 kg

Additional notes for integration

  • Designed for backplane-based installation within Mark V control racks

  • Supports multi-signal I/O interface and internal communications used by the control system

  • Suitable for service replacement when maintaining legacy turbine control systems where like-for-like board compatibility is required

Operational Use Cases

  • Mark V turbine control rack maintenance and lifecycle support

  • Replacement of failed or unstable interface/communication boards to recover normal control rack operation

  • Spares management for sites operating legacy GE turbine control systems

  • Troubleshooting scenarios involving intermittent rack communication, interface faults, or board-level power/logic issues (subject to standard site diagnostic procedures)

 

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Nextek Industrial Internet Platform Empowers SME Digital Transformation
Oct 22, 2026
Maxwell
Nextek Industrial Internet Platform Empowers SME Digital Transformation
The Nextek Industrial Internet Platform has emerged as a transformative force in China's manufacturing sector,...
Read More
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
Oct 22, 2026
Maxwell
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
The 26th China International Industry Fair (CIIF), scheduled for September 23-27, 2026, in Shanghai, promises...
Read More
China Industrial Robot Installations Reach Record 354000 Units in 2025
Oct 22, 2026
Maxwell
China Industrial Robot Installations Reach Record 354000 Units in 2025
China's dominance in the global industrial robotics market reached new heights in 2025, with the...
Read More
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More