DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
ABB

DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series

SKU: DLM02
Categories : ABB
In Stock
  • Dimensions: 4.1 x 20.5 x 31 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB DLM 02 P37421-4-0338434, also cataloged as the DLM02 Link Module, operates as a dedicated hardware component for system communication and module interconnection within ABB H&B Freelance 2000 platforms.

Model Identification Matrix

Parameter Specification
Model DLM02
Full Ordering Code P37421-4-0338434
Spare Model DLM 02 P37421-4-0338434
Product Type Link Module
Series ABB H&B Freelance 2000
Manufacturer ABB
Country of Origin Germany

Hardware Specifications

Parameter Specification
Model DLM02
Brand ABB
Origin Germany
Weight 1.68 kg
Shipping Dimensions 4.1 x 20.5 x 31 cm
Operating Temp Not specified
Power Consumption Not specified
Module Function Communication link interface
System Platform ABB H&B Freelance 2000
Module Type DLM-02 Link Module

Industrial Communication Interface Characteristics

The ABB DLM02 is a communication interface module designed for the H&B Freelance 2000 automation system. The module provides internal data exchange capability between system components through the defined Freelance 2000 communication architecture.

As part of ABB modular control platforms, the DLM02 requires correct hardware identification and system configuration matching during replacement. Communication performance depends on the installed controller architecture, connected modules, and configured system parameters.

ABB control systems use structured backplane and communication interfaces to maintain deterministic data exchange between automation components. Proper module addressing, connection verification, and firmware compatibility checks should be completed before commissioning.

Ordering Information

  • 1 x ABB DLM02 P37421-4-0338434 Link Module
  • Supplied as an individual H&B Freelance 2000 communication module
  • No external communication cables, mounting accessories, or additional interface components are included

Installation Guidelines

  • Disconnect system power before installing or removing the DLM02 module.
  • Confirm the correct Freelance 2000 rack position before installation.
  • Inspect module connectors and mating interfaces before insertion.
  • Ensure communication wiring follows the original system configuration.
  • Keep communication cables separated from high-voltage power wiring.
  • Maintain proper grounding and shielding practices for industrial communication lines.
  • Verify module recognition and communication status after installation.

Frequently Asked Questions

  • What is the main function of ABB DLM02?

The DLM02 is a Link Module designed for communication and interconnection functions within ABB H&B Freelance 2000 systems.

  • What is the complete part number of DLM02?

The full identification is P37421-4-0338434, also listed as DLM 02 P37421-4-0338434.

  • Is DLM02 an input or output module?

No. DLM02 is a communication link module and does not function as a standard field I/O module.

  • Which system uses the DLM02 module?

The DLM02 belongs to the ABB H&B Freelance 2000 automation platform.

  • Can DLM02 be installed while the system is powered?

No. Power isolation is recommended before removing or installing communication modules.

  • Does DLM02 require firmware compatibility checking?

Yes. System firmware and hardware configuration should be verified before replacement.

  • What should be checked after DLM02 installation?

Verify module recognition, communication status, and system diagnostics after installation.

  • What precautions are required when handling DLM02?

Use ESD protection, avoid connector damage, and maintain original wiring and grounding arrangements.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series

You may also like

From our blog

Latest News and Insights

Epiroc Expands Autonomous Haulage with 3D Fleet Management Platform
Aug 24, 2026
MaxWell
Epiroc Expands Autonomous Haulage with 3D Fleet Management Platform
Navigating narrow underground drifts and multi-level incline ramps has long represented a bottleneck for autonomous...
Read More
Schneider Electric Releases Landmark Study on 800 VDC Arc Flash Safety in AI Data Centers
Aug 24, 2026
MaxWell
Schneider Electric Releases Landmark Study on 800 VDC Arc Flash Safety in AI Data Centers
As artificial intelligence workloads push server rack densities past 400 kW, hyperscale operators are aggressively...
Read More
Emerson Secures Major Automation Contract for BP Shah Deniz Compression Facility
Aug 24, 2026
MaxWell
Emerson Secures Major Automation Contract for BP Shah Deniz Compression Facility
Energy giant BP has awarded global technology and engineering leaderEmersona multi-million-dollar contract to deliver advanced...
Read More
Epiroc Secures $41M Order for Autonomous Electric Mining Rigs in Africa
Aug 23, 2026
MaxWell
Epiroc Secures $41M Order for Autonomous Electric Mining Rigs in Africa
Mining operators worldwide are accelerating the transition toward zero-emission extraction and remote field operations to...
Read More
Geothermal Energy Emerges as Essential Domestic Resource for Grid Security and Data Centers
Aug 23, 2026
MaxWell
Geothermal Energy Emerges as Essential Domestic Resource for Grid Security and Data Centers
Geopolitical instability, volatile trade routes, and concentrated supply chains for critical minerals are forcing energy...
Read More
SoftBank and Yaskawa Demonstrate Deformable Object Manipulation via Physical AI Development Cloud
Aug 23, 2026
MaxWell
SoftBank and Yaskawa Advance Physical AI Robotics on Cloud Infrastructure
Industrial robotics is achieving a major capability breakthrough as cloud-based artificial intelligence connects directly with...
Read More
Siemens Accelerates Enterprise Automation with Industrial AI Ecosystem at CES 2026
Aug 22, 2026
MaxWell
Siemens Accelerates Enterprise Automation with Industrial AI Ecosystem at CES 2026
Manufacturing operations are entering an aggressive digital transformation phase as cognitive computing blends with shop-floor...
Read More
Fanuc Partners with Google to Expand Physical AI Capabilities Across Next-Gen Industrial Robotics
Aug 22, 2026
MaxWell
Fanuc Partners with Google to Expand Physical AI Capabilities Across Next-Gen Industrial Robotics
Robotic automation is reaching a transformative turning point as cognitive intelligence merges directly with physical...
Read More
Next-Gen Industrial Automation: ABB Collaborative Robots Redefine Enterprise Productivity Beyond Factory Floors
Aug 22, 2026
MaxWell
Next-Gen Industrial Automation: ABB Collaborative Robots Redefine Enterprise Productivity Beyond ...
Industrial automation is undergoing a massive structural shift as collaborative robotics transitions from lightweight, niche...
Read More
Caterpillar Deploys Advanced Machine Intelligence across Construction Fleets
Aug 21, 2026
MaxWell
Caterpillar Deploys Advanced Machine Intelligence across Construction Fleets
Building on three decades of autonomous development in large-scale mining, Caterpillar Inc. has officially announced...
Read More