CI810V2 ABB 3BSE013224R1 AF100 Fieldbus Communication Interface
CI810V2 ABB 3BSE013224R1 AF100 Fieldbus Communication Interface
CI810V2 ABB 3BSE013224R1 AF100 Fieldbus Communication Interface
ABB

CI810V2 ABB 3BSE013224R1 AF100 Fieldbus Communication Interface

SKU: 3BSE013224R1
Categories : ABB
In Stock
  • Dimensions: 18.6cm x 6.5cm x 13cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB CI810V2 (3BSE013224R1) is a high-availability communication interface module designed to integrate S800 I/O stations with the Advant Fieldbus 100 (AF100) network. This "V2" revised model serves as the critical bridge for real-time data exchange, allowing distributed I/O clusters to communicate with AC 800M or Advant controllers. By supporting redundant configurations, the CI810V2 ensures that a single point of failure in the communication path does not disrupt process control. It manages the local ModuleBus, providing power and clock synchronization to all connected I/O modules while maintaining a deterministic link to the supervisory control level.

System Architecture & Communication Specs

  • Interface Designation: CI810V2

  • Part Identification: 3BSE013224R1

  • Network Protocol: Advant Fieldbus 100 (AF100)

  • Redundancy Support: Full media redundancy for mission-critical uptime

  • I/O Capacity: Supports up to 12 S800 I/O modules per station

  • Diagnostic Logic: Integrated LED status indicators and remote fault reporting via ModuleBus

  • Power Management: Distributed 24V DC station power for I/O modules

  • Physical Profile: 18.6cm x 6.5cm x 13cm

  • Module Mass: 0.44kg

  • Housing Material: High-impact polycarbonate with DIN rail latching

  • Regulatory Compliance: CE, UL, and CSA certified for hazardous industrial environments

Strategic Industrial Deployment

The CI810V2 3BSE013224R1 is a primary choice for distributed automation architectures where communication failure is not an option. Key use cases include:

  • Distributed Process Control: Connecting remote I/O islands in oil and gas refineries back to central AC 800M controllers over long distances.

  • Redundant Utility Monitoring: Supervising electrical substation parameters where dual AF100 bus paths are required for grid reliability.

  • Large-Scale HVAC Systems: Coordinating complex air handling and cooling units across multi-building industrial complexes.

  • Continuous Manufacturing: Facilitating data flow for chemical batching and pharmaceutical production lines that require 24/7 synchronization.

  • Marine Power Systems: Managing propulsion and auxiliary power logic on vessels where high-integrity communication is mandatory for safety.

 

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More