Bently Nevada 16925-33 Interconnect Cable 3300 Series
Bently Nevada 16925-33 Interconnect Cable 3300 Series
Bently Nevada 16925-33 Interconnect Cable 3300 Series
Bently Nevada

Bently Nevada 16925-33 Interconnect Cable 3300 Series

SKU: 16925-33
Categories : All Products
In Stock
  • Dimensions: 23 x 23 x 3 cm
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for signal transmission in machine protection systems, the Bently Nevada 16925-33 (16925-33 Interconnect Cable) provides direct physical/electrical execution.

Cable Architecture

  • Type: 3-conductor shielded instrumentation cable.
  • Conductor Gauge: 22 AWG (0.5 mm2).
  • Connector Configuration: 3-socket plug at one end, terminal lugs at the opposite end.
  • Length Range: Minimum 2.0 ft (0.6 m) to maximum 99 ft (30 m).

Physical and Electrical Data

Parameter Specification
Model 16925-33
Brand Bently Nevada
Origin USA
Weight 0.25 kg
Shipping Dimensions 23 x 23 x 3 cm
Operating Temp -40 deg C to +105 deg C
Storage Temp -50 deg C to +85 deg C
Voltage Rating 300 V AC/DC
Conductor Count 3 (individually insulated)

Signal Integrity and Rotor Dynamics

The 16925-33 cable facilitates the precise transport of raw signals from eddy-current probes to monitoring instrumentation. Maintaining signal integrity is required for accurate gap voltage validation, typically targeted at -10 VDC for standard probe gaps. The cable's shielding geometry is engineered for cross-talk suppression and the reduction of electromagnetic interference in harsh turbine environments. Proper termination of the shield at the signal ground is required to maintain the stability of the rotor dynamics data stream and prevent ground loop injection into the monitoring circuit.

Package Contents

  • 1 unit 16925-33 Interconnect Cable
  • 1 set Installation technical documentation

Deployment Requirements

  • Ensure the cable routing avoids high-voltage power conduits to minimize inductive noise coupling.
  • Verify the shield is connected at the appropriate grounding terminal per the monitoring system manual.
  • Do not exceed the minimum bend radius during installation to prevent deformation of the internal conductors.
  • Ensure the 3-socket plug is fully seated and locked into the probe housing to prevent intermittent connections.
  • Apply cable ties at regular intervals to secure the run and prevent mechanical fatigue from vibration.

Technical FAQs

  • What is the maximum allowable length for this cable?

    The cable supports a maximum length of 99 ft (30 m). Extending beyond this limit may result in signal attenuation and degradation of the eddy-current probe's frequency response.

  • Is the shield continuous from end to end?

    Yes, the shield is designed to be continuous throughout the cable length to provide uniform protection against EMI and RFI interference.

  • Can this cable be used for high-temperature applications?

    The cable is rated for operation up to +105 deg C. Ensure the application environment does not exceed this rating, as excessive heat will degrade the insulation.

  • How should the terminal lugs be secured?

    The terminal lugs should be fastened to the designated terminals with proper torque to ensure low-resistance electrical contact.

  • Does the cable require specific grounding?

    The shield must be grounded at the monitor end to avoid ground loops. Refer to the specific 3300 series monitor installation guide for system grounding requirements.

  • Can I field-repair the 3-socket plug?

    Field repairs of the connector are not recommended. Damaged connectors should be replaced with factory-certified components to maintain signal integrity.

  • Is the cable resistant to oil or chemical exposure?

    The outer jacket is designed for industrial environments; however, verify the specific jacket material compatibility if exposed to aggressive synthetic lubricants or solvents.

  • Why is the gap voltage reading unstable?

    Instability may indicate a poor connection at the terminal lugs, shield grounding issues, or a damaged cable segment. Inspect the physical integrity of the cable and connectors.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
Sep 06, 2026
MaxWell
Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
In a strategic move to capitalize on South America's premier unconventional energy play, Continental Resources...
Read More
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Sep 06, 2026
MaxWell
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Industrial control panel manufacturing continues to face skilled labor shortages and tight project turnaround timelines,...
Read More
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Sep 06, 2026
MaxWell
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Data analytics firm Enverus has published its US land drilling contractor and operator performance rankings...
Read More
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
Sep 05, 2026
MaxWell
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
 Rapid digitalization across modern manufacturing has created a pronounced talent discrepancy among incoming control system...
Read More
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
Sep 05, 2026
MaxWell
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
The industrial automation sector continues to grapple with a long-standing challenge: bridging theoretical academic research...
Read More
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
Sep 05, 2026
MaxWell
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
The industrial manufacturing landscape is witnessing a growing divide between discrete assembly operations and complex...
Read More
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Sep 04, 2026
MaxWell
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Germany’s manufacturing framework is undergoing a structural pivot, balancing macroeconomic stagnation with targeted, high-capital deployments...
Read More
Emerson Unveils DeltaV v16.LTS DCS Architecture
Sep 04, 2026
MaxWell
Emerson Unveils DeltaV v16.LTS DCS Architecture
Modern industrial operations face mounting pressure to modernize their automation infrastructure while controlling lifecycle expenditures...
Read More
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Sep 04, 2026
MaxWell
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Industrial facilities are rapidly evolving into the primary engines of data generation across global enterprise...
Read More
Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More