Allen-Bradley PLC-5 1775-L4 Main Processor Module
Allen-Bradley

Allen-Bradley PLC-5 1775-L4 Main Processor Module

SKU: 1775-L4
Categories : All Products
In Stock
  • Dimensions: 6.5 x 33.5 x 49 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 1775-L4, also cataloged as the 1775-L main processor module, operates as a dedicated hardware component for executing ladder scan and I/O supervision across the PLC-3/10 peripheral bus within 1775-A3 chassis systems.

Catalog Number Decoding

  • 1775-: PLC-3/10 chassis and processor family
  • L4: Level-4 main CPU for PLC-3/10, 16-bit custom ASIC, 2K-word data table baseline

Hardware Specifications

Parameter Specification
Model 1775-L4
Brand Allen-Bradley
Origin USA
Weight 2.74 kg
Shipping Dimensions 6.5 x 33.5 x 49 cm
Operating Temp 0 to 60 deg C
Storage Temp -40 to 85 deg C
Humidity 5-95 % RH non-condensing
Vibration 1 G at 5-150 Hz
Processor Type 16-bit custom ASIC
Scan Time 10 ms per 1K instructions (boolean)
Data Table Memory 2K words (expandable via 1775-MS4/MS8/MSA)
Discrete I/O Capacity 8192 points max
Data Highway 57.6 kbps peer-poll, twinax, 32 nodes max
Remote I/O 1.544 Mbps scanner mode
Programming Port RS-232 (DF1, 1770-T4 / 6200 software)
Power Source 5 VDC backplane from 1775-P2/P3 supply

PLC-3 Peripheral Bus Coupling and Firmware Lock

The 1775-L4 seats in the dedicated CPU bay of a 1775-A3 chassis and draws 5 VDC from the 1775-P3 power supply; it is not 1785-Lxx pin-compatible and will not seat in a 1771 PLC-5 rack. Execution closes over the PLC-3 peripheral bus at 10 ms/K instruction scan, with I/O mapped through a 1775-SR5 or 1775-S4 scanner module—not directly on the backplane. Firmware is mask-ROM fixed; no flash update path exists. Memory expansion uses 1775-MS4 (32K) / MSA (64K) daughter cards stacked on the CPU header. EtherNet/IP, ControlNet and Profinet licences are absent—networking is limited to DH 57.6 kbps twinax and 1.544 Mbps RIO. Backplane bus velocity licence does not apply; this is a 1980s 16-bit peripheral-bus CPU, not a ControlLogix rack module.

Ordering Info

  • 1 x 1775-L4 main processor module (discontinued 2014-04-29, surplus sealed unit)
  • 1 x 1775-MS4 32K memory daughter card (optional, not fitted)
  • 1 x 1775-CAK front-panel interconnect cable (field-supplied)

Chassis Mounting and Bus Rules

  • Seat CPU in the leftmost designated processor bay of 1775-A3 chassis; do not occupy I/O scanner slot with the L4.
  • Feed 1775-P3 power supply from isolated 115/230 VAC, 5 VDC backplane rail must settle at 5.0 VDC +/-0.25 V before CPU insert.
  • Terminate DH twinax (Belden 8723) with 75 ohm resistors at both trunk ends; max 32 nodes, max 7000 ft trunk.
  • RS-232 programming port uses 25-pin D-sub to 1770-T4 terminal or PC null-modem; DF1 protocol at 9600/19200 bps.
  • Bond 1775-A3 chassis ground to cabinet ground bus with 4 mm² green/yellow, single point only.

Frequently Asked Questions

Q: Can the 1775-L4 be inserted into a PLC-5 1785 rack?

A: No. Edge connector keying and backplane signaling differ. 1775-L4 runs only in 1775-A3 (PLC-3/10) chassis. Forcing into 1771-A3B bends the 5 VDC tabs and leaves the 1785 bus undriven.

Q: Is the module hot-swappable on a live 1775 backplane?

A: No. 5 VDC backplane insertion arcs the ASIC power pins and corrupts the peripheral bus arbiter. PLC-3/10 requires 1775-P3 power off before CPU extraction or insertion.

Q: How is user memory expanded beyond 2K words?

A: Stack 1775-MS4 (32K), 1775-MS8 (32K) or 1775-MSA (64K) CMOS RAM daughter cards on the CPU header. Data table then spans base 2K plus daughter card space; no firmware change needed.

Q: What scan time applies to 4K boolean instructions?

A: 10 ms per 1K instructions nominal, so 4K executes in 40 ms per full scan. Timer/counter and PID blocks add overhead; actual wall-clock scan is 10-15% longer than pure boolean math.

Q: Does 1775-L4 support DH+ (Data Highway Plus)?

A: No. It speaks original DH at 57.6 kbps half-duplex peer-poll over twinax. DH+ (1784-KT/XT) is a PLC-5 era protocol; bridging requires a 1775-KA to DH then a 1784-KF2 gateway.

Q: Can RS-232 port run while DH trunk is active?

A: Yes. RS-232 is independent DF1 point-to-point for programming/HMI; DH trunk runs peer-poll concurrently. Both share the 16-bit ASIC but separate UART blocks; no arbitration conflict.

Q: What replaces 1775-L4 in a migration?

A: No drop-in. PLC-3/10 migrates to ControlLogix 1756-L7x with 1783-ETAP DH+ tap and 1756-DH/DHRIO bridge modules. Ladder translates via RSLogix 5->5000 conversion, not binary lift.

Q: Battery backup on 1775-L4?

A: No on-board battery. CMOS RAM (1775-MS4/MSA) holds data only while 1775-P3 5 VDC rail is alive; on total power loss data table clears. Program resides in mask-ROM; reload via 6200 software from tape/PC.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More